ML030520297

From kanterella
Jump to navigation Jump to search
January 2003 Monthly Operating Report for Vermont Yankee Nuclear Power Station
ML030520297
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 02/10/2003
From: Bronson K
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY-03-14
Download: ML030520297 (6)


Text

'

Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc Vermont Yankee 322 Governor Hunt Rd PO Box 157 Vernon, VT 05354 Tel 802-257-7711 February 10, 2003 BVY-03-14 United States Nuclear Regulatory Commission ATT'N: Document Control Desk Washington, D.C. 20555

Reference:

(a) License No. DPR-28 (Docket No. 50-271)

In accordance with section 6.6.B of the Vermont Yankee Technical Specifications, submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of January, 2003.

Sincerely,

,/

Kevin H. Bronson General Manager, Plant Operations cc: USNRC Region I Administrator USNRC Resident Inspector USNRC Project Manager

VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 03-01 FOR THE MONTH OF JANUARY 2003

OPERATING DATA REPORT DOCKET NO.50-271 DATE 030210 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 OPERATING STATUS

1. Unit Name:
2. Reporting Peri<

Vermont Yankee

)d:

January

3.

Licensed Thermal Power(MWt) :1593

4. Nameplate Rating(Gross MWe): 540
5. Design Electrical Rating(Net MWe):

522

6. Maximum Dependable Capacity(Gross MWe):

535

7. Maximum Dependable Capacity(Net MWe):

510

8.

If changes, occur in capacity ratings(Items Number last report, give reasons:

3 through 7) since

9.

Power level to which restricted, if any(Net MWe):

N/A

10. Reasons for restrictions, if any:

N/A This Month

11. Hours in Reporting Period 744.00
12. Number Of Hours Reactor was Critical 744.00
13.

Reactor Reserve Shutdown Hours 0.00

14. Hours Generator On-Line 744.00
15. Unit Reserve Shutdown Hours 0.00
16. Gross Thermal Energy Generated(MWH) 1184386.45
17. Gross Electrical Energy Generated(MWH) 410190.00
18. Net Electrical Energy Generated(MWH) 394170.00
19. Unit Service Factor 100.00
20. Unit Availability Factor 100.00
21. Unit Capacity Factor(Using MDC Net) 103.90
22. Unit Capacity Factor(Using DER Net) 101.50
23. Unit Forced Outage Rate 0.00
24.

Shutdowns scheduled over next 6 months(Type, Date, Each:

N/A Yr-to-Date Cumulative 744.00 263712.00 744.00 223892.83 0.00 0.00 744.00 220257.78 0.00 0.00 1184386.45 333564803.29 410190.00 111991120.00 394170.00 106576529.00 100.00 82.50 100.00 82.50 103.90 79.00 101.50 77.40 0.00 3.93 and Duration of

25.

If shut down at end of report period, estimated date of startup: N/A

26. Units In Test Status(prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 (Sample)

DP 0411 Rev. 8 Page 1 of 1 RT No. 13.FO1.19F

AVERAGE DAILY UNIT POWER LEVEL MONTH January DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

1.

530

2.

530

3.

530

4.

530

5.

530

6.

530

7.

530

8.

530

9.

530

10.

530

11.

530

12.

530

13.

530

14.

530

15.

530

16.

528 DOCKET NO.

50-271 UNIT Vermont Yankee DATE 030210 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

17.

530

18.

529

19.

529

20.

530

21.

529

22.

529

23.

529

24.

529

25.

530

26.

530

27.

530

28.

530

29.

530

30.

530

31.

530 INSTRUCTIONS:

On this format, list the average daily unit power level in MWE-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

VYDPF 0411.02 (Sample)

DP 0411 Rev.

8 Page 1 of 1 RT No.

13.FO1.18V

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH JANUARY DOCKET NO UNIT NAME DATE COMPLETED BY TELEPHONE 50-271 Vermont Yankee 030210 G.A. Wallin (802)258-5414 1

F: Forced S: Scheduled VYDPF 0411.03 DP 0411 Rev.

8 Page 1 of 1 2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)

H-(Explain)-

3 Method:

1 -

Manual 2 - Manual Scram 3 - Automatic Scram 4 -

Other (Explain) 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for License Event Report (LER) File (NUREG 0161) 5 Exhibit I -

Same Source 1

2 3

4 5

No.

Date Type Duration Reason Method of License System Component Cause and Corrective (hours)

Shutting Event Code Code Action to Prevent Down Report #

Recurrence Reactor (None)

DOCKET NO.

50-271 DATE 030210 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 REPORT MONTH January

SUMMARY

OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 99.9 of rated thermal power for the month.

Gross electrical generation was 410,190 MWHe or 100.9% design electrical capacity.

Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:

At the beginning of the reporting period the plant was operating at 99.9%

of rated thermal power.

There were no items of interest to report for this month.

At the end of the reporting period the plant was operating at 99.9% of rated thermal power.

VYDPF 0411.04 (Sample)

DP 0411 Rev.

8 Page 1 of 1 RT No.

13.FO1.18X