MessageP Page I of I Sienel, Beth From:
Pichette, Ann Sent:
Thursday, July 10, 2003 12:54 PM To:
'lerevents @ inpo.org'; 'rbelval @velco.com'; 'gparker@ velco.com'; 'rivestE gmpvt.com';
'martin @ gmpvt.com'; 'kvedar@ gmpvt.com'; 'dutton @ gmpvt.com'; 'brown @ gmpvt.com';
'william.sherman @ state.vt.us'; 'bwendland @AmNucins.com'; 'barbaralewis @ platts.com';
'bamelan~cvps.com'; Kilburn, Bobbi; Williams, Rob; Cosgrove, Brian; McElwee, David; Finn, Brian; Porter, Brad; Wanczyk, Robert; Yialiades, Theresa; Sandstrum, Sally; Jefferson, Stan; Mannai, David; Wallin, Greg; Rondeau, Nancy; Skibniowsky, Steve; Sienel, Beth; Pelton, David
Subject:
Vermont Yankee Nuclear Power Station MSR June 2003 Attached please find the Vermont Yankee Nuclear Power Station Monthly Statistical Report for June 2003. If you have any questions please feel free to contact me.
Ann M. Pichette Controlled Document Specialist Technical Support Department 802-451-3094 MC 1220 00-001 6/15/2004
-- En tergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
Vermont Yankee 322 Governor Htnt Rd.
P.O. Box 157 Vernon, Vr 05334 Tel 802-257-771 1 July 10, 2003 BVY-03-61 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Reference:
(a) License No. DPR-28 (Docket No. 50-271)
In accordance with section 6.6.B of the Vermont Yankee Technical Specifications, submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of June, 2003.
- Sincerey, Kevin H. Bronson General Manager, Plant Operations cc: USNRC Region I Administrator USNRC Resident Inspector USNRC Project Manager
VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 03-06 FOR TEIE MONTH OF JUNE 2003
OPERATING DATA REPORT DOCKETNO.50-271 DATE 030710 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 OPERATING STATUS
- 1. Unit Name:
Vermont Yankee
- 2. Reporting Period:
June
- 3. Licensed Thermal Power(MWt):1593
- 4. Nameplate Rating(Gross MWe): 540
- 5. Design Electrical Rating(Net MWe):
522
- 6. Maximum Dependable Capacity(Gross MWe):
535
- 7. Maximum Dependable Capacity(Net MWe):
510
- 8. If changes, occur in capacity ratings(Items Nutmber last report, give reasons:
3 through 7) since
- 9. Power level to which restricted, if any(Net MWe):
N/A
- 10. Reasons for restrictions, if any:
N/A 11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
Hours in Reporting Period Number Of Hours Reactor was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated(MWIH)
Gross Electrical Energy Generated(MWH)
Net Electrical Energy Generated(M.WH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor(Using MDC Net)
Unit Capacity Factor(Using DER Net)
Unit Forced Outage Rate Shutdowns scheduled over next 6 months Each:
N/A This Month 720.00 720.00 Yr-to-Date 4343.00 4343.00 Cumulative 270504.80 227491.83 0.00 720.00 0.00 1146113.15 388421.00 368768.00 100.00 100.00 100.43 98.12 0.00 (Type, Date, 0.00 0.00 4343.00 223856.78 0.00 0.00 6867901.18 339248317.97 2364340.00 113945270.00 2266856.00 108449215.00 100.00 82.76 100.00 82.76 102.34 79.29 99.99 77.68 0.00 3.86 and Duration of
- 25. If shut down at end of report period, estimated date of startup: N/A
- 26. Units In Test Status(prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 (Sample)
DP 0411 Rev. 8 Page 1 of 1 RT No. 13.FO1.19F
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-271 Vermont Yankee 030710 G.A. WALLIN (802)258-5414 MONTH June DAY AVERAGE DAILY POWER LEVEL (M0e-Net)
DAY AVERAGE DAILY POWER LEVEL (Me-Net) 1.
522 17.
522 2.
520 18.
3.
524 19.
4.
521 20.
5.
522 21.
6.
520 22.
7.
520 23.
8.
524 24.
-521 505 510 509 508 506 504 504 500 502 500 497 497 9.
10.
11.
12.
13.
14.
15.
519 25.
517 506 505 507 512 522 26.
27.
28.
29.
30.
31.
16.
519 INSTRUCTIONS:
On this format, list the average daily unit power level in MWE-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
VYDPF 0411.02 (Sample)
DP 0411 Rev. 8 Page 1 of 1 RT No. 23.F01.18V
UNIT SHUTDOWNS AND POWER REDUCTIONS I
REPORT MONTH JUNE DOCKET NO UNIT NAME DATE COMPLETED BY TELEPHONE 50-271 Vermont Yankee 030710 G.A. Wallin (802)258-5414 1
2 3
4 Cause and Corrective Action to Prevent No.
Date Type Duration Reason Method of License System Component Recurrence.
Shutting Event Code Code (hours)
Down Report #
Reactor (NONE) 1 F: Forced S: Scheduled 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-(Explain) -
3 Method:
4 1 -
Manual 2 - Manual Scram 3 -
Automatic Scram 4 -
Other (Explain)
Exhibit G-Instructions for Preparation of Data Entry Sheets for License Event Report (LER) File (NUREG 0161) 5 Exhibit I -
Same Source VYDPF 0411.03 DP 0411 Rev. 8 Page 1 of 1
I.
DOCKET NO.
DATE COMPLETED BY TELE PHONE 50-27 1 030710 G.A. WALLIN (802) 258-5414 REPORT MONTH June
SUMMARY
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 99.9% of rated thermal power for the month.
Gross electrical generation was 388,421 MWHe or 100.4% design electrical capacity.
?
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
At the beginning of the reporting period the plant was operating at 99.6%
of rated thermal power.
There were no items of interest to report for this month.
At the end of the reporting period the plant was operating at 99.95% of rated thermal power.
VYDPF 0411.04 (Sample)
DP 0411 Rev. 8 Page 1 of 1 RT No. 13.FO1.18X