E-mail from M. Cheok to G. Demoss, Regarding Davis Besse
ML031110500
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/10/2002
From: Michael Cheok
Office of Nuclear Regulatory Research
To: Demoss G
Office of Nuclear Regulatory Research
References
FOIA/PA-2003-0018
Download: ML031110500 (4)


Text

, Mary Demoss - Davis Besse - what else a

From: Michael Cheok fig To: Gary Demoss Date: 10/10/02 9:52AM

Subject:

Davis Besse - what else FYI

.~ ./

Gary Demoss - Re: Davis Besse Lessons learned Page 1li From: Scott Newberryj, A'S5 To: Michael Cheok Date: 10/1 0/02 9:36AM

Subject:

Re: Davis Besse Lessons learned Thanks Mike. This is well done and I am ready to forward to Ashok. Let me know--he is out for a while on travel. - -

I talked to Gary H yesterday about DB SDP--stop by or give me a call today. He indicated that he was still marking up Steve Long's work, that product was due out of NRR tomorrow, but that he expect it will indicate unresolved issues. I told him I wanted to write up our input.

Status and thoughts please.

>>> Michael Cheok 10/09/02 04:49PM >>>

A Davis Besse Lessons Learned report was published in early October. Based on the recommendations of this report, a Senior Management Action Review Team (SMART) is to hold an offsite meeting to come up with a proposed action plan. This offsite meeting will likely be held sometime during the week of October 21. Carl Paperiello will head this team. Other members are Ashok, Ellis Merschoff, Marty Virgilio, and Sam Collins.

To support Ashok's participation in this team, Gary (with the help of Chris) will be doing the following:

- get a copy of the DB lessons learned report from Joe Donoghue (or Ed Hackett). Joe and Ed are members of the task team that wrote the lesson-learned report.

- review the report with focus on consistency with OERAB/RES activities. In particular, look at Sec 3.1.1 (Significant operating experience involving boric acid leakage and corrosion), Sec 3.1.6 (NRC operating experience review and assessment capabilities), and Appendix E (primary system leakage and boric acid corrosion operating experience at U.S. PWRs)

- search for and document previous Davis Besse events that we had AIT/lIT or ASP analyses for.

Compare number and severity of events to those at other plants. Note: the SMART will be getting NUREGs 1154 and 1201 on the 1985 DB main and aux feedwater event, and the 1999 reports on the DB corrosion event - so our search should, at the least, include these events. What Ashok may be looking for here is whether the licensee has a better/worse record than the average licensee, and issues of safety culture, trends, etc.

- Talk to Jay Persensky about his NUREG on licensee's corrective action program. See if the current DB event (or previous DB events) fall into the category where corrective actions were not properly implemented.

- summarize findings from NRR's SDP analysis of the current event, and OERAB's and DET's comments on this analysis.

Output of this task should be bullets addressing the above topics. If, during the review, other topics present themselves that may be of interest to Ashok - discuss these with PatB or Mike before doing more work on them.

Please plan on briefing Pat and Scott on these bullets by 10/17.

CC: Michael Mayfield; Nilesh Chokshi; Patrick Baranowsky

Pa1

.Gary G;ary Deos- - Lessons learned Demoss Re: Davis Besse Lessons learned Iage AX ~~~~~~~~~~~~~~~. ~PaaeZ0 JoI From: Michael Mayfield f/X -~'

To: Michael Cheok; Scott Newberry Date: 10/10/02 9:39AM

Subject:

Re: Davis Besse Lessons learned Mike - there are copies of the report in-house (Scott should have one and I do) so you can get one without having to 6hase others.

We also are getting copies made of the additional reports that are going to be reviewed by the senior managers. The first two were copied and delivered to Scott and Farouk yesterday. Shirley is supposed to send the others to me to get copied and distributed.

Mike

>>> Scott Newberry 10/10/02 09:36AM >>>

Thanks Mike. This is well done and I am ready to forward to Ashok. Let me know--he is out for a while on travel.

I talked to Gary H yesterday about DB SDP--stop by or give me a call today. He indicated that he was still marking up Steve Long's work, that product was due out of NRR tomorrow, but that he expect it will indicate unresolved issues. I told him I wanted to write up our input.

Status and thoughts please.

>>> Michael Cheok 10/09/02 04:49PM >>>

A Davis Besse Lessons Learned report was published in early October. Based on, the recommendations of this report, a Senior Management Action Review Team (SMART) is to hold an offsite meeting to come up with a proposed action plan. This offsite meeting will likely be held sometime during the week of October 21. Carl Paperiello will head this team. Other members are Ashok, Ellis Merschoff, Marty Virgilio, and Sam Collins.

To support Ashok's participation in this team, Gary (with the help of Chris) will be doing the following:

- get a copy of the DB lessons learned report from Joe Donoghue (or Ed Hackett). Joe and Ed are members of the task team that wrote the lesson-learned report.

- review the report with focus on consistency with OERAB/RES activities. In particular, look at Sec 3.1.1 (Significant operating experience involving boric acid leakage and corrosion), Sec 3.1.6 (NRC operating experience review and assessment capabilities), and Appendix E (primary system leakage and boric acid corrosion operating experience at U.S. PWRs)

- search for and document previous Davis Besse events that we had AIT/IIT or ASP analyses for.

Compare number and severity of events to those at other plants. Note: the SMART will be getting NUREGs 1154 and 1201 on the 1985 DB main and aux feedwater event, and the 1999 reports on the DB corrosion event - so our search should, at the least, include these events. What Ashok may be looking for here is whether the licensee has a better/worse record than the average licensee, and issues of safety culture, trends, etc.

- Talk to Jay Persensky about his NUREG on licensee's corrective action program. See if the current DB event (or previous DB events) fall into the category where corrective actions were not properly implemented.

- summarize findings from NRR's SDP analysis of the current event, and OERAB's and DET's comments on this analysis.

Output of this task should be bullets addressing the above topics. If, during the review, other topics present themselves that may be of interest to Ashok - discuss these with PatB or Mike before doing more

[Gary Demoss - Re: Davis Besse Lessons learned Paae 2t work on them.

Please plan on briefing Pat and Scott on these bullets by 10/17.

CC: -