V /I I. 11 UNITES STATES COURT OF APPEALS y3/3 FOR THE SECOND CIRCUIT RIVERKEEPER, INC.,
RIVERKEEPER, INC., )
Petitioner )
)
V. )
)
SAMUEL J.COLLINS, Director, Office of Nuclear )
Reactor Regulation; DR. WILLIAM TRAVERS, )
Executive Director for Operations of the Nuclear ) PETITION FOR Regulatory Commission; UNITED STATES NUCLEAR ) REVIEW REGULATORY COMMISSION; the UNITED STATES )
OF AMERICA; ENTERGY NUCLEAR INDIAN )
POINT 2, LLC; ENTERGY NUCLEAR INDIAN )
POINT 3, LLC; and ENTERGY NUCLEAR )
OPERATIONS, INC. )
)
Respondents. .)
Riverkeeper, Inc. (hereinafter "Riverkeeper"), hereby petitions the Court for review of the final Order of Executive Director for Operations of the United States Nuclear Regulatory Commission ("NRC" or "Commission") in a 10 C.F.R. § 2.206 petition for action concerning Indian Point Nuclear Power Station, in which the NRC denied Riverkeeper's administrative petition requesting the immediate shutdown of Indian Point Units 2 & 3, entered on the 18th day of November, 2002, which pursuant to 10 C.F.R. § 2.206 (c) became final on the 13'h of December, 2002, twenty-five days after issuance.
Riverkeeper seeks review and reversal of the Director's Decision number DD-02-06, Nuclear Regulatory Commission docket numbers50-003, 50-247, and 50-286 on the grounds that it violates the Atomic Energy Act as amended and constitutes an abuse of the Commission's discretion and a complete abdication of its statutory duty under 42 U.S.C. § 2201(i) "to protect health and to minimize dangers to life or property." Pursuant to 28 U.S.C. § 2343, Riverkeeper seeks review in the Second Circuit Court of Appeals, where petitioner has its principal office.
a, A true copy of the final order of the Directors Decision, DD-02-06, is attached as Exhibit DATED: White Plains, NY February 10, 2003 Attorney for Petitioners Karl S. Coplan, Esq.
Pace Environmental Litigation Clinic 78 North Broadway White Plains, NY 10603
0 F=
0n WASHINGTON6p.C. 2055.0001 November 18, 2002 Mr. Alex Matthiessen Executive Director Riverkeeper, Inc.
25 Wing & Wing Garrison, NY 10524
Dear Mr. Matthiessen:
This letter responds to the petition you filed with Dr. William Travers, Executive Director for Operations, of the U.S. Nuclear Regulatory Commission (NRC) pursuant to Section 2.206 of Title 10 of the Code of FederalRegulations (10 CFR 2.206) on November supplemented on December 20, 2001. In your petition, you requested that8, 2001, and as the NRC: (1) order the licensee to suspend operations, revoke the operating license, or adopt other measures resulting In a temporary shutdown of the Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and 3); (2) order the licensee to conduct a full review of the facility's vulnerabilities, security measures and evacuation plans; (3) require the licensee to provide information documenting the existing and readily attainable security measures which protect the IP facility against land, water, and airborne terrorist attacks; (4) immediately modify the IP2 and 3
mandate certain specified security measures sufficient to protect the facility;operating licenses to and (5) order the revision of the licensee's Emergency Response Plan and Westchester County's Emergency Response Plan (RERP) to account for possible terrorist attacks Radiological comprehensive response to multiple, simultaneous attacks in the region which and prepare a efficient evacuation of the area. In addition, you stated that if, after conducting may impair the a full review of the facility's vulnerabilities. security measures, and evacuation plans, the NRC finds that it cannot sufficiently ensure the security of the IP facility against terrorist threats, take prompt action to permanently retire the facility. Further, separately from the NRC should the above issues, you requested that the NRC order the licensee to undertake the immediate conversion of the current spent fuel storage technology from a water-cooled system to a dry cask system.
On December 20, 2001, the NRC staff acknowledged receiving your petition and stated that, pursuant to 10 CFR 2.206, your petition would be acted upon within a reasonable time, You were also told that the NRC did not consider the immediate closure of IP2 necessary to provide adequate protection for the public's health and safety and 3 to be in light of the defense-in-depth concept incorporated into the facility's design and the heightened security measures implemented in response to the events of September 11, 2001, Although the NRC staff did not request Entergy Nuclear Operations, Inc.
(ENO), to provide information related to the petition, ENO responded on February 11, 2002, and the information provided was considered by the staff in its evaluation of the petition.
The staff sent a copy of the Proposed Director's Decision to you and to ENO for comment on May 16, 2002. You responded with comments on August 9, 2002. ENO comments. Your comments and the staff's response to them are included did not provide any as enclosures.
With regard to the issues raised by the Petitioners, the NRC has, in effect, Petitioners' request for an immediate security upgrade at IP2 and 3. As partially granted the stated in its letter to the
A. M4atthie~sen -'2 - 'q a Petitioners on December 20, 2001, the NRC took action to enhance security at all nuclear facilities, including IP2 and 3, on September 11, 2001. Immediately after the attacks, the NRC advised all nuclear power plants to go to the highest These facilities have remained at a heightened level of security, which they promptly did.
security level since that time. Additionally, the NRC issued Orders to all operating commercial nuclear power plants on February 25, 2002, to implement interim compensatory security measures of the requirements formalized a series of security for the current threat environment. Some response to advisories Issued by the NRC, and measures that NRC licensees had taken in others were security enhancements which have emerged from the Commission's ongoing comprehensive requirements include increased patrols, augmented security review. In general, the security posts, installation of additional physical security forces and capabilities, additional barriers, vehicle checks at greater stand-off distances, enhanced coordination with law enforcement restrictive site access controls for all personnel. and military authorities, and more The NRC continues to work with other Federal agencies and is monitoring relevant information it receives on security matters at nuclear facilities. The NRC is prepared to make immediate adequate protection of the public's health and safety.adjustments as necessary to ensure Petitioners' request that the licensee conduct a full On the basis of these actions, the review of the facility's vulnerabilities, security measures, and evacuation plans has been, in effect, Petitioners' request for specific information about partially granted. Regarding the the security measures, the NRC's policy is to not release safeguards information to the public.
Thus, this request is denied.
The NRC in its February 25, 2002, Orders also directed potential vulnerabilities to maintain or restore cooling licensees to evaluate and address pool and to develop specific guidance and strategies to the core, containment, and spent fuel areas of the plant due to explosions or fires. These to respond to an event that damages large identify and utilize any remaining onsite or offsite strategies are intended to help licensees to security review recommends any other security equipment and capabilities. If NRC's ongoing measures, the NRC will take appropriate action.
The NRC denies the Petitioners' request to mandate the Petitioners, for the protection of the facility, such certain security measures, as specified by as a system to defend a no-fly zone. As part of its ongoing comprehensive security review, the environment in coordination with other Federal agenciesNRC is examining the threat augment the licensee's response. These organizations and the use of governmental assets to will define the appropriate boundary between the public and private sector in the defense security requirements, along with the enhancements of nuclear facilities. Further, the current in the February 25 Orders, provide reasonable assurance of the protection of the facility.
The NRC finds that the existing emergency response plans are flexible enough to respond to a wide variety of adverse conditions, including a terrorist Orders issued since September 11, 2001, directed attack. The NRC advisories and the licensees to take specific actions deemed appropriate to ensure continued improvements to Petitioners' concern that the emergency plans do existing emergency response plans. The not contemplate multiple attacks on the infrastructure is alleviated by the fact that the emergency flexible enough to respond to a wide spectrum of plans are intended to be broad and events. Thus, the Petitioners' request that the onsite and offsite emergency plans be revised to account for possible terrorist attacks has been, in part, granted.
A. 'Matthlessen The NRC found that the current spent fuel storage system and the adequately protect the spent fuel. Thus, the Petitioners' security provisions at IP dry-cask storage facility is denied. However, the licensee request to order the installation of a has stated its intention to add such a facility.
A copy of the Director's Decision (DD-02-06) will be filed with the Secretary of the Commission for the Commission to review in accordance with 10 CFR 2.206(c). As provided for by this regulation, the decision will constitute the final action of the of the decision unless the Commission, on its own motion, Commission 25 days after the date within that time. The documents cited in the enclosed institutes a review of the decision decision are available in the Agencywide Documents Access and Management System (ADAMS)
Public Document Room, located at One White Flint North, for inspection at the Commission's 11555 Rockville Pike (first floor),
Rockville, Maryland, and from the ADAMS Public Ubrary component on the NRC Web site, http://www.nrc.gov/reading-r..html (the Public Electronic Reading Room).
The incoming petition was originally withheld from the potential for sensitive, security-related information to public document room due to the be included. When the NRC received your letter, the criteria for releasing security-related information was still being determined in light of the events of September 11, 2001. Your incoming letter, and subsequent correspondence, were later made publicly available.
I have also enclosed a copy of the notice of "lssuance 10 CFR 2.206" that has been filed with the Office of of Director's Decision Under the Federal Register for publication.
Please feel free to contact the petition manager, Patrick Milano, at 301.-415-1457 to discuss any questions related to this petition. I thank you for your time and interest in nuclear power plant security.
Sincerely, Aamue J.Cins, Director "Office of Nuclear Reactor Regulation Docket Nos.50-003, 50-247, and 50-286
Enclosures:
- 1. Director's Decision 02-06
- 2. Petitioners' Comments on Proposed Director's Decision
- 3. Staff's Response to Petitioners' Comments
- 4. FederalRegisterNotice
- 1 DD-02-06 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION Samuel J. Collins, Director Inthe Matter of )
)
Docket Nos.50-003, 50-247, and 50-286 ENTERGY NUCLEAR OPERATIONS, INC. ) License Nos. DPR-5, DPR-26,
) and DPR-64
)
(Indian Point Nuclear Generating Unit ) (10 CFR 2.206)
Nos. 1,2, and 3) )
DIRECTORS DECISION UNDER 10 CFR 2.206 I. Introduction By letter dated November 8, 2001, as supplemented on December 20, 2001, Riverkeeper, Inc., et al. filed a Petition pursuant to Title 10 of the Code of FederalRegulations, Section 2.206 (10 CFR 2.206). The Petitioners requested that the U.S. Nuclear Regulatory Commission (NRC) take the following actions: (1) order the licensee to suspend operations, revoke the operatli ig license, or adopt other measures resulting in a temporary shutdown of the Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and 3); (2) order the licensee to conduct a full review of the facility's vulnerabilities, security measures, and evacuation plans; (3) require the licensee to provide information documenting the existing and readily attainable security measures which protect the IP facility against land, water, and.airborne terrorist attacks; (4) immediately modify the IP2 and 3 operating licenses to mandate certain specified security measures sufficient to protect the facility;, and (5) order the revision of the licensee's emergency response plan and Westchester County's Radiological Emergency Response Plan (RERP) to account for possible terrorist attacks and prepare a comprehensive response to multiple, simultaneous attacks in the region, which could impair the efficient evacuation of the
area. In addition, the Petitioners requested that the NRC take prompt action to permanently retire the facility if, after conducting a full review of the facility's vulnerabilities, security measures, and evacuation plans, the NRC finds that the IP facility cannot be adequately protected against terrorist threats. Further, separately from the above issues, the Petitioners requested that the NRC order the licensee to undertake the immediate conversion of the current water-cooled spent fuel storage system to a dry cask system. The bases for the requests are that (1) the IP facility is a plausible target of future terrorist actions, (2) actual threats against nuclear power plants have been documented, (3) IP is currently vulnerable to a catastrophic terrorist attack, (4) a terrorist attack on 1P2 and 3 would have significant public health, environmental, and economic impacts, and (5) the Westchester County's RERP is inadequate because it is based on erroneous assumptions.
In a letter dated December 20, 2001, the NRC informed the Petitioners that their request for a full review of the facility's vulnerabilities, security measures, and evacuation plans was, in effect, partially granted, because the NRC had already taken action to require licensees to enhance security and the Commission had directed the staff to undertake a comprehensive review of plant security. In light of the defense-in-depth concept incorporated into the facility's design and the heightened security measures implemented in response to the events of September 11, 2001, the NRC did not consider the immediate closure of IP2 and 3 to be necessary to provide adequate protection of the public health and safety.
In its December 20, 2001, letter, the NRC told the Petitioners that a public meeting or telephone conference with the NRR Petition Review Board was not necessary or appropriate at the time since the Petitioners' request was already being treated as a 2.206 Petition and because of the possible sensitive nature of the information. Under normal circumstances, the NRC would follow Management Directive (MD) 8.11, "Review Process for 10 CFR 2.206 Petitions," when reviewing requests for enforcement action; however, since the Petition involved
t-.- UY35
-3 possible sensitive information, the NRC deferred application of certain public aspects of the MD 8.11 process pending further developments of the NRC's security review.
On December 20, 2001, the Petitioners provided a declaration from Dr. Gordon Thompson dated December 20, 2001, and requested that the declaration be included as a supplement to their Petition. The NRC treated the declaration as a supplement to the Petition.
Although the NRC had Initially withheld the Petition from public distribution pending Commission guidance about public dissemination of potential security information, the NRC has now determined that the Petition can be made publicly available. Therefore, the documents are available in the NRC's Agencywide Documents Access and Management System (ADAMS) for inspection at the Commission's Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor),
Rockville, Maryland. Publicly available records are also accessible from the ADAMS Public Electronic Reading Room on the NRC Web site htt:'w n / i /adas.html. Persons who do not have access to ADAMS or have problems in accessing the documents located in ADAMS should contact the NRC PDR reference staff by telephone at 1-800-397.4209 or 301-415-4737 or by e-mail to Rdr@rC.cO.
Entergy Nuclear Operations, Inc. (the licensee), responded to the Petition on February 11, 2002, and the staff considered the information in reviewing the Petition.
The NRC sent a copy of the proposed Director's Decision to the Petitioners and to the licensee for comment on May 16, 2002. The Petitioners responded with comments on August 9, 2002. The licensee did not provide comments. The comments and the NRC staff's response to them are enclosed with the final Director's Decision.
II. Discussion Full Review of Vulnerabilities and Security Measures In the Petition, as supplemented, the Petitioners requested that the NRC order the licensee to conduct a full review of the facility's vulnerabilities and security measures. The Petitioners stated that the reactor, spent fuel, control rooms, and electrical switching were vulnerable to terrorist attack. The Petitioners' request was based on the following assertions:
(1) IP2 and 3 are a plausible target because of the population density of the surrounding area and the proximity to New York City, (2) news releases have documented threats against nuclear facilities, (3) an operational plant is more vulnerable, (4) an attack could damage cooling to the spent fuel pools (SFPs) and/or drain the pools, leading to fuel cladding oxidation, fire, and release of radioactive materials, and (5) the design-basis threat did not consider a terrorist attack. The Petitioners also stated that the facility is not currently equipped to defend Itself from terrorist attacks, the licensee has a poor record in security and emergency preparedness, and nuclear industry security forces have repeatedly failed to repel mock attacks. The Petitioners also believe that an attack on an operating reactor would force plant operators to face competing interests between safe operations and physical security.
Staff's Response The Petitioners' request for a review of vulnerabilities and security measures has been partially granted based on actions initiated by the NRC following the events of September 11, 2001. The NRC concludes that Indian Point has sufficient security measures In place to defend itself from a broad spectrum of potential terrorist attacks. The basis for these conclusions is discussed below.
The NRC and its licensees have dealt with the issue of protection of licensed facilities against sabotage or attack for a number of years. Security against sabotage has been an important part of the NRC's regulatory activities, with defense-in-depth as the guiding design
and operating principle. NRC regulations ensure that .uclear power plants are among the most hardened and secure Industrial facilities in our nation. The many layers of protection offered by robust plant design features, sophisticated surveillance equipment, physical security protective features, professional security forces, access authorization requirements, and NRC regulatory oversight provide an effective deterrence against potential terrorist activities that could target equipment vital to nuclear safety.
The NRC requirements for the defense of nuclear power plants are defined, In part, by the "design basis threat" (DBT). The DBT is specified in general terms in 10 CFR 73.1 and in greater detail in sensitive documents. The DBT was prepared by safeguards experts on the basis of information from the Department of Energy and the intelligence community about terrorist-related information both abroad and in the United States. The DBT is a reasonable characterization of an adversary force against which nuclear power plant licensees must design their physical protection systems and response strategies.
In 10 CFR Part 73, "Physical Protection of Plants and Materials," the NRC provides detailed requireme, its designed to protect nuclear power plants against acts of radiological sabotage, prevent the theft of special nuclear material, and protect safeguards information against unauthorized release. The requirements of Part 73 are summarized as follows:
- 1. The licensee permits only authorized activities and conditions within established protected areas, material access areas, and vital areas by using controls and procedures, defined boundaries, detection, communication and surveillance subsystems, and by establishing schedules of authorized operations.
- 2. The licensee prevents unauthorized access of. persons, vehicles and objects into protected and vital areas by using detection and barrier systems.
- 3. The licensee provides for authorized access and assures detection of and response to unauthorized penetrations of the protected area.
- 4. The licensee permits only authorized control and movement of special nuclear material.
- 5. The licensee provides response capabilities to assure that NRC requirements are achieved.
- 6. The licensee maintains a well-equipped and highly trained security organization.
- 7. The licensee installs physical barriers to protect vital equipment and material.
- 8. The licensee installs detection, surveillance, and alarm systems capable of sensing unauthorized penetrations of isolation zones and ensuring a prompt response action.
- 9. The licensee provides access authorization (e.g., background checks, routine worker screening, badging, etc.) programs and procedures.
- 10. The licensee ensures that all guards and armed response individuals have the ability to communicate with a continuously manned alarm station.
- 11. The licensee establishes an effective testing and maintenance program to verify that all physical barriers, and detection and alarm systems are capable of meeting NRC requirements.
Licensees are also required to develop specific physical security plans (PSPs) and submit these plans to the NRC for approval before implementing them. The NRC conducts periodic inspections of the licensees' security programs. Performance testing of physical security has been conducted by the NRC staff through Operational Safeguards Response Evaluations. In addition, the licensees are required to establish a liaison with local law enforcement organizations for added assistance in the event of an attack.
Shortly after September 11, 2001, the NRC recognized the need to reexamine the basic assumptions underlying the current nuclear facility security and safeguards programs.
Chairman Richard A. Meserve, with the full support of the Commission, directed the staff to undertake a comprehensive review of the NRC's security regulations and programs.
This is an ongoing review and as results become available, they will be evaluated and, ifappropriate,
incorporated into NRC's regulatory processes. The review includes consultation with the Office of Homeland Security, the Federal Bureau of Investigation (FBI), the Departments of Transportation and Energy, and others. The NRC's participation with these agencies allows the NRC to communicate its actions to other Federal agencies, ensuring an appropriate and balanced response throughout the nation's entire critical energy infrastructure.
The attacks of September 11, 2001, were unprecedented and required the NRC and Its licensees to reevaluate the type of assault that might be mounted against a nuclear power plant. As a result, on February 25, 2002, the NRC issued Orders to all operating power reactor facilities to require that certain interim compensatory security measures be taken beyond those called for by current regulations. Although licensee responses to the prior NRC Threat and Safeguards Advisories provided reasonable assurance of adequate protection of public health and safety, the NRC determined that certain compensatory measures were prudent to address the current threat environment in a consistent manner throughout the nuclear reactor industry.
The Orders formalized a series of steps that nuclear power plant licensees had been advised to take by the NRC in the aftermath of the terrorist attacks on September 11 and added certain security enhancements. For security reasons, the details of these interim compensatory measures cannot be made public. Some of the specific measures implemented by the licensees in response to the advisories and interim compensatory measures included increased patrols, augmented security forces and capabilities, additional security posts, installation of additional physical barriers, vehicle checks at greater stand-off distances, enhanced coordination with law enforcement and military authorities and more restrictive site access controls for all personnel. The Orders also directed licensees to evaluate and address potential vulnerabilities to maintain or restore cooling to the core, containment, and spent fuel pool and to develop specific guidance and strategies to respond to an event resulting in damage to large areas of the plant due to explosions or fires. These strategies are intended to help identify and
utilize any remaining equipment and capabilities to maintain or restore core, containment, and spent fuel pool cooling, including both onsite and offsite resources. These requirements will remain in effect until the NRC notifies licensees that the threat environment has significantly changed or until the NRC determines, as a result of the ongoing comprehensive reevaluation of current safeguards and security programs, that other changes are needed.
The Petitioners are correct that the DBT did not consider a terrorist attack such as occurred on September 11, 2001. As part of the comprehensive review of safeguards vulnerabilities, the NRC will reexamine the DBT and modify it as appropriate. As in the past, the NRC will coordinate its evaluation with various other Government agencies and discuss resource commitments with the military, the States, and local law enforcement. Ifa credible vulnerability is identified that is not addressed by another Federal agency, the NRC staff will consider additional physical protection, material control, and other appropriate requirements.
Although the NRC cannot rule out the possibility of future terrorist activity directed at a licensee's site before implementing any further enhancements to its safeguards programs, the NRC believes that these facilities can continue to operate safely.
The staff also recognizes that design and construction of commercial nuclear power plants could contribute to their survivability in the event of an attack not considered by the current design-basis threat, such as an aircraft impact. Nuclear power plant design is based on defense-in-depth principles, and includes many features to protect public health and safety. For example, reinforced containment buildings and redundant safety systems would help trained operators prevent or limit the release of radioactive material in the event of a terrorist attack. In addition, NRC requirements for coping with fires and station blackout (loss of offsite and onsite power) provide added capability to bring the plant to safe shutdown conditions assuming such aspects as loss of the control room or failure of the emergency diesel generators.
The NRC requires careful background checks ,'o minimize the risk of insider assistance) and facility access controls, delay barriers, and intrusion detection systems (to detect potential attackers). The NRO also requires licensees to be able to respond with force to a group of armed attackers, using protective strategies involving layers of defense. Therefore, the NRC believes that the facilities are adequate to withstand many of the challenges from safety or safeguards events, such as armed assaults.
In summary, a robust security program existed at IP prior to the events of September 11,2001. Since September 11, the NRC has initiated a review of nuclear facility security and safeguards programs, and has taken action to enhance security in the interim.
Full Review of Radiological Emergency.Preparedness and Evacuation Planning In its December 20 supplement, the Petitioners cited a prior NRC study prepared by Sandia National Laboratory that discussed source terms and potential radiological consequences of an attack on IP. The Petitioners were concerned about the economic and environmental consequences of an attack causing a massive release of radioactive materials.
Regarding umergency preparedness planning, the Petitioners believe that the IP onsite and offsite emergency plans did not envision an act of terrorism of the magnitude seen on September 11, 2001. Additionally, the Petitioners stated that the Westchester County RERP is inadequate and does not consider the possibility of multiple simultaneous attacks on vital infrastructure relied on in the current plan.
Staff's Response The NRC finds that the emergency preparedness plans and evacuation planning at IP2 and 3 are appropriate to use in response to a radiological emergency, including a release caused by a terrorist attack. The basis for this conclusion is discussed below.
The overall objective of emergency response planning is to minimize the dose to the public for a spectrum of accidents that could produce offsite doses in excess of protective
-19 action guidelines. No single accident sequence should be isolated as the one for which to plan because each accident could have different consequences, both in nature and degree.
Emergency plans are intended to be broad and flexible enough to respond to a wide spectrum of situations, including various initiating events, sources of release, types of nuclides released, and magnitude, timing, or duration of release.
The NRC and the Federal Emergency Management Agency (FEMA) are the two Federal agencies responsible for evaluating emergency preparedness at and around nuclear power plants. The NRC is responsible for evaluating the adequacy of onsite emergency plans developed by the utility, while FEMA Is responsible for assessing the adequacy of offsite (State and local) radiological emergency planning and preparedness activities. The NRC requires licensees to have detailed procedures for responding to events, making timely notifications to appropriate authorities, and providing accurate radiological information. For the offsite plans, the NRC relies on FEMA's findings in determining whether there is reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency.
- The licensee, local and county emergency response officials, and State emergency management officials discuss and agree on the facility's emergency response plan.
NRC regulations require the establishment of a plume exposure pathway emergency planning zone (EPZ) about 10 miles in radius and an ingestion exposure pathway EPZ about 50 miles in radius around each nuclear power plant site.
In the unlikely event of a severe reactor accident with offsite consequences, NRC guidance calls for the prompt evacuation of the population within a 2-mile radius of the plant and about 5 miles in the downwind direction. The guidance states that these protective actions would be expanded, as necessary, based on further assessment of plant conditions, dose assessment, and field monitoring information. At longer distances, shelter is usually the appropriate protective action, followed by relocation of segments of the population, if warranted
r
-'11 -
by the results and analysis of radiological measurements taken in the field. The main protective action planned for the 50-mile EPZ is protection of the public from the ingestion of contaminated food and water. It is considered extremely unlikely that evacuation would be required at a distance of 50 miles even after the most severe accident. The planning established for the 10-mile and 50-mile EPZs, the decreasing consequences and increasing time available for taking protective actions as the distance from the plant increases, and the availability of monitoring data on which to base protective action decisions provide assurance that appropriate protective actions would be taken to protect the population within 50 miles of a site.
NRC regulations also require that the applicant for a nuclear power reactor operating license provide an analysis of the time required to evacuate and take other protective actions within the plume exposure pathway EPZ. This analysis is referred to as the "evacuation time estimate" (ETE). There are no preset minimum evacuation times that a nuclear power plant site must meet. However, the NRC expects that the ETEs for a site are a reasonably accurate reflection of the time it would take to evacuate the site environs under normal and adverse conditions. ETEs are mostly used to identify potential traffic bottlenecks so that appropriate traffic control plans can be developed. Nuclear power reactor licensees are expected to review and revise their ETEs for their sites. The revisions must take into account changes in population, road capacities, potential traffic impediments, and other factors affecting the ETEs.
The ETEs are assessment tools used by decision makers for determining whether evacuation is the preferred protective action option for the general public under specific accident and offsite conditions.
On August 1, 2001, the NRC issued Regulatory Issues Summary (RIS) 2001-16, "Update of Evacuation Time Estimates,* to all holders of operating licenses for nuclear power
plants. In this RIS, the NRC alerted licensees of the possible need to update ETEs as a result of the 2000 Census. The Jicerisee is currently preparing a new ETE report for IP2 and 3.
FEMA has established the Radiological Emergency Preparedness Program to (1) ensure that the health and safety of citizens living around commercial nuclear power plants can be adequately protected in the event of a nuclear power plant accident, (2) inform and educate the public about radiological emergency preparedness, and (3) make findings and determinations as to the adequacy of State and local plans and the capability of State and local governments to effectively implement these plans and preparedness measures. Federal agencies also have plans In place to coordinate their response activities and share their resources in support of State and local officials during an emergency. Coordination of activities includes joint planning and training sessions and exercise participation. Emergency plans are continually improved based on experience gained through plan implementation and as a result of exercises, drills, and actual events.
In late January 2002, the State of New York issued its annual letter of certification to FEMA. By this letter, the State informed FEMA that specific preparedness activities have been completed including training and the updating of State and local plans. However, the updating of State and local plans is an ongoing activity.
The NRC staff understands that the State and counties have addressed the adequacy of evacuation plans through their required review process in preparation for the exercise conducted in September 2002 and, in doing so, continue to review evacuation-related procedures in light of changes in demographics and conditions.
FEMA's specific findings on the exercise will be issued later this year, but the preliminary assessment indicates that the offsite emergency plans are adequate to protect public health and safety.
The Petitioners refer to the 1982 Sandia National Laboratory (SNL) Report, 'Calculation of Reactor Accident Consequences" (CRAC-2 Report), and cite this report as a basis for
concern that a terrorist attack could result in a massive release of radioactive materials. The reactor siting studies in the CRAG-2 Report were performed as part of research on the sensitivity of various plant siting parameters. The studies used generic postulated releases of radioactivity from a spectrum of severe (core melt) accidents, independent of the probabilities of the event occurring or the impact of mitigation mechanisms. The studies were never intended to be realistic assessments of accident consequences. The estimated deaths and injuries resulted from assuming the most adverse condition for each parameter in the analytical code.
In the cited studies, the number of resulting deaths and injuries also reflected the assumption that no protective actions were taken for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The studies did not, and were never intended to, reflect reality or serve as a basis for emergency planning. The CRAC-2 Report analyses used more simplistic models than current technologies. The two basic conclusions from the SNL siting studies were that the mean estimated number of health effects from the assumed releases for all reactor sites varied by up to more than 4 orders of magnitude and that the financial costs of the releases were dominated by clean-up costs and replacement power costs. The SNL studies provided a useful measure to compare sites, not to analyze plant specific accident consequences.
Regarding the Petitioners' assertion that the emergency plans do not contemplate multiple attacks on the infrastructure (i.e., roads, bridges, transportation, communications, etc.),
the NRC finds that the existing emergency response plans allow considerable flexibility to respond to a wide variety of adverse conditions, including the results of a terrorist attack. As previously discussed in this Director's Decision, the NRC considers that commercial nuclear power plants have sufficient security measures in place to defend against a broad spectrum of potential terrorist threats, thereby precluding the release of radioactive material to the environment. If a terrorist attack inflicted damage on a nuclear plant, the redundant design features inherent in the plant, and the high level of training accorded the plant staff, would likely
result in actions being taken by the plant staff to prevent or minimize the release of radioactive material. In the unlikely event of a significant release of radioactive material, for whatever reason, the emergency response plans provide for protective actions for the surrounding population. While the emergency response plans provide alternative actions in the event of some failures of the local infrastructure, there are limits to the degree to which it is reasonable to assume that infrastructure components are unavailable. The responsibility to preclude the large scale and resource intensive effort that would be required for a successful terrorist attack on multiple targets, rests with agencies of the Federal government. The NRC considers the actions of various intelligence and law enforcement agencies, combined with the actions of the Department of Defense, to provide assurance that a successful large scale terrorist attack is unlikely. Additionally, the NRC advisories and the Orders issued since September 11, 2001, directed licensees to take specific actions to improve existing emergency response plans, including heightened coordination with local, State, and Federal authorities. In summary, the NRC concludes that emergency preparedness plans and evacuation planning are routinely revised and updated, and are appropriate to use in response to a radiological emergency, including a release caused by a terrorist attack.
Information about Security Measures to Protect Aqainst Terrorist Attacks The Petitioners requested that the NRC require the licensee to provide information documenting the existing and readily attainable security measures which provide IP with protection against land, water, and airborne terrorist attacks. This information should provide sufficient basis for the NRC to determine that physical barriers, intrusion alarms, and other measures are in place or constructed and are sufficient to meet realistically expected threats.
" -15 Staff's ResDonse As previously discussed, the NRC and its licensees have taken a number of steps since September 11, 2001, to increase security at NRC-licensed facilities, including safeguards advisories. At IP, the licensee's security force was augmented by the New York State Police and the National Guard (including Hudson River patrols) and local law enforcement personnel.
The NRC issued Orders on February 25, 2002, to all commercial nuclear power plants to implement interim compensatory security measures for the current threat environment.
Some of the requirements made mandatory by the Orders formalized the security measures that NRG licensees had taken in response to advisories issued by the NRC in the aftermath of the September 11 terrorist attacks. The Orders also imposed additional security enhancements, which have emerged based on the NRC's assessment of the current threat environment and its ongoing security review.
The requirements will remain in effect until the NRC determines that the level of threat has diminished, or that other security changes are needed. The specific actions are sensitive, but include increased patrols, augmented security forces and capabilities, additional security posts, installation of additional physical barriers, vehicle checks at greater stand-off distances, enhanced coordination with law enforcement and military authorities and more restrictive site access controls for all personnel. The Orders also require additional security measures pertaining to the owner-controlled land outside of the plants' protected areas. Currently, the New York State Naval Militia provides security measures to detect and deter watercraft access from entedng the exclusion area around the IPplants.
In its report on security, the State of New York Office of Public Security (OPS) provided recommendations to enhance security at IP.
Many of the measures suggested have been implemented by the licensee and others are currently under advisement. The measures are recommendations by OPS to further enhance security and are not requirements in current NRC regulations. In response to the NRC Orders of February 25, 2002, the licensee provided
information, that taken in conjunction with other sources of security information, resulted in the NRC finding the licensee's security posture to be appropriate under the current circumstances.
The Petitioners additionally seek specific details of security measures in place to respond to the potential for terrorist attacks. The NRC's policy is to withhold safeguards information from the public. Therefore, this request is denied.
Mandate Security Measures Sufficient to Protect the Facility The Petitioners requested the NRC to mandate, at a minimum, the following security measures sufficient to protect the facility:
- 1. Obtainment of a permanent no-fly zone from the Federal Aviation Administration (FAA) in the airspace within 10-nautical miles of the IP facility.
- 2. A defense and security system sufficient to protect and defend the no-fly zone.
- 3. A defense and security system sufficient to protect the entire facility, including the containment and spent fuel storage buildings, control room and electrical equipment.
Staff's Response In the aftermath of September 11, 2001, the Federal government took a number of steps to improve aviation security and minimize the threat of terrorists using airplanes to damage facilities critical to our nation's infrastructure. The Commission views that the efforts associated with protecting our nation from terrorist attacks by air should be directed toward enhancing security at airports and on airplanes. Thus, the Commission endorses the prompt response by Congress to strengthen aviation security under the Aviation and Transportation Security Act of 2001, because this legislation provides for improved protection against air attacks on all industrial facilities, both nuclear and non-nuclear. The NRC further supports the steps taken by the FAA to improve aircraft security, including enhanced passenger and baggage screening, strengthening of cockpit doors, and the Air Marshal program. The U.S.
intelligence community and various Federal law enforcement agencies have also increased
- -,*17.
efforts to identify potential terrorists and prevent potenti3l attacks before they occur. For example, the FAA and Department of Defense have acted more than once to protect airspace above nuclear power plants from what were thought to be credible threats against certain specific sites. These potential threats were later judged to be non-credible.
The NRC is also reviewing measures to bolster defenses and to establish new antiterrorism strategies in a thorough and systematic manner. The NRC is taking a realistic and prudent approach toward assessing the magnitude of the potential threat and the strength of licensee defenses.
NRC licensees must defend nuclear power plants against the DBT. September 11 showed that the NRC and its licensees must reevaluate the scope of potential assaults of all types. However, there are limits to what can be expected from a private guard force, even assisted by local law enforcement. Even if it is determined that nuclear power plants should be defended against aircraft attack, the NRC cannot expect licensees to acquire and operate antiaircraft weapornry. Protection against this type of threat may be provided by other means within the Federal guvernment.
In summary, the Petitioner's request is denied because the NRC considers that the collective measures taken since September 11, 2001, provide adequate protection of public health and safety.
Dry-Cask Spent Fuel Storage System The Petitioners requested that the NRC order the licensee to immediately convert the current spent fuel storage from water-cooled SFPs to a dry-cask storage system In a bunkered structure. As the basis for the request, the Petitioners state that this action would reduce the long-term risk of potential exothermic oxidation in the existing fuel storage facility. The Petitioners state that the NRC has never established that the spent fuel storage facility at IP is secure against foreseeable attacks nor can the NRC be certain that the spent fuel storage
"& -'18 -
- facility is sufficiently sound to preclude the possibility of a spent fuel fire in the event of an airborne, land, or water-based assault. The Petitioners' concerns were based, in part, on information in an NRC report, "Final Technical Study of Fuel Pool Accident Risk at Decommissioning Nuclear Power Plants," dated October 2000, and on the Petitioners' evaluation of the consequences of a terrorist attack on the spent fuel pool buildings. In their December 20, 2001, supplement, the Petitioners state that the NRC has not performed an environmental impact statement or probabilistic risk analysis assuming all modes of water loss from the SFPs, including terrorist attack, and the Petitioners further discuss the probability and consequences of exothermic oxidation of the spent fuel cladding.
Staff's Re~sronse The NRC staff presently concludes'that spent fuel can be safely stored at the IP reactor site in the current system of SFPs and therefore, the Petitioners' requests are denied.
Although the spent fuel storage buildings at IP are not as hardened as the reactor containment structures, the SFPs themselves are robust, and relatively small structures, that are partially below ground level. The spent fuel is stored in racks resting on the floor of the pools and is covered by more than 20 feet of water. The pools are designed to prevent a rapid loss of water with the structure intact, and the pool water level and cooling system are monitored and alarmed in the control rooms. Thus, the response time for events involving the SFP is significantly longer than for other event scenarios.
It is also easier to add water to the SFP from various sources because It Is an open pool. The robust design and small size of the pools minimize the likelihood that a terrorist attack would cause damage of a magnitude sufficient to result in an offsite release of radioactive material.
Further, offsite resources can be brought onsite to assist the response to an event.
When the NRC staff completes its reevaluation of the physical security requirements, the NRC will be able to judge whether modifications to the SFP structures and enclosures are warranted and whether additional safeguards measures should be established. If so, the NRC will act accordingly. In the meantime, the NRC has issued Orders to all nuclear power plants requiring certain interim compensatory measures to augment security and strengthen mitigation strategies. The SFPs are within the protected area of the facility and therefore protected from certain external threats under the security provisions identified in the PSPs.
During the NRC review of the transfer of the licenses for IP1 and 2, the licensee indicated that it was evaluating the possible construction of an independent spent fuel storage facility. In a public meeting on March 14, 2002, the licensee stated that it was expediting its engineering review for this facility.
I1l. Conclusion As stated in its letter to the Petitioners on December 20, 2001, the NRC has, in effect, partially granfed the Petitioners' request for an immediate security upgrade at 1P2 and 3. On September 11, 2001, the NRC took action to enhance security at all nuclear facilities, including IP2 and 3. Immediately after the attacks, the NRC advised all nuclear power plants to go to the highest level of security, which they promptly did. These facilities have remained at a heightened security level since. The NRC continues to work with other Federal agencies and Is monitoring relevant information it receives on security matters at nuclear facilities. The NRC is prepared to make immediate adjustments as necessary to ensure adequate protection of the public.
On February 25, 2002, the NRC issued Orders to IP2 and 3 and all other operating commercial nuclear power plants to implement interim compensatory security measures for the high-level threat environment. Some of the requirements formalized a series of security measures that NRC licensees had taken in response to advisories issued by the NRC, and
A ~ a4 others are security enhancements that have emerged from the Commission's ongoing comprehensive security review. The Commission issued the Orders, which incorporated the threat advisories and added additional requirements, to formalize the security enhancements at commercial nuclear power plants. Because the threat environment had persisted longer than expected, it is appropriate to maintain these security measures within the established regulatory framework. The details of these security requirements are sensitive and will not be provided to the public. Some of the specific measures Implemented by the licensees in response to the advisories and interim compensatory measures included Increased patrols, augmented security forces and capabilities, additional security posts, Installation of additional physical barriers, vehicle checks at greater stand-off distances, enhanced coordination with law enforcement and military authorities and more restrictive site access controls for all personnel. Therefore, the Petitioners' request that the licensee conduct a full review of the facility's vulnerabilities, security measures, and evacuation plans has been, in effect, partially granted. Regarding the Petitioners' request for specific information about the security measures, the NRC believes that it is inappropriate to discuss perceived vulnerabilities and current or planned security measures in the public domain. Thus, this request Is denied.
The NRC in its February 25, 2002, Orders also directed licensees to evaluate and address potential vulnerabilities to maintain or restore cooling to the core, containment, and SFP and to develop specific guidance and strategies to respond to an event that damages large areas of the plant due to explosions or fires. These strategies are intended to help licensees to identify and utilize any remaining onsite or offsite equipment and capabilities.
If NRC's ongoing security review recommends any other security measures, the NRC will take appropriate action.
S a The NRC denies the Petitioners' request to ma,.date certain security measures, as specified by the Petitioners, for the protection of the facility, such as systems to defend a no-fly zone. As part of its ongoing comprehensive security review, the NRC is examining the threat environment in coordination with the new Office of Homeland Security, the FBI, FEMA, the FAA, the military, the intelligence community, and the Department of Energy, among others.
The NRC will take appropriate action based on the results of this review. The NRC considers that the current security requirements, along with the enhancements in the February 25 Orders, provide reasonable assurance of the protection of the facility.
The NRC finds that the existing emergency response plans are flexible enough to respond to a wide variety of adverse conditions, including a terrorist attack. The NRC advisories and the Orders issued since September 11, 2001, directed licensees to take specific actions deemed appropriate to ensure continued improvements to existing emergency response plans. The Petitioners' concern that the emergency plans do not contemplate multiple attacks on the infrastructure is alleviated by the fact that the emergency plans are intended to be broad and flexible enough to respond to a wide spectrum of events. Thus, the Petitioners' request that the onsite and offsite emergency plans be revised to account for possible terrorist attacks has been, in part, granted.
The NRC finds that the current spent fuel storage system and the security provisions at IP adequately protect the spent fuel. However, the licensee has stated its intention to install an Independent Spent Fuel Storage Installation. The Petitioners' request to order the installation is denied.
As provided in 10 CFR 2.206(c), a copy of this Director's Decision will be filed with the Secretary of the Commission for the Commission to review. As provided for by this regulation, the Decision will constitute the final action of the Commission 25 days after the date of the
6 l Decision unless the Commission, on its own motion, institutes a review of the Decision within that time.
Dated at Rockville, Maryland, this 18 th day of November 2002.
FOR THE NUCLEAR REGULATORY COMMISSION m
,Sans Director Office of Nuclear Reactor Regulation
Form C:-A (forAgency Cases)
UNITED STATES COURT OF APPEALS FOR THE SECOND CIRCUIT El APPLICATION FOR ENFORCEMENT El PETITION FOR REVIEW PRE-ARGUM ENT STATEM ENT SEE NOTICE ON REVERSE PLEASE TYPE OR PRINT. ATTACH XDDITIONAL PAGES IF NECESSARY.
NAMEOFAGENCY: U.S. Nuclear Regulatory Commission AGENCY DOCKET NO.: 50 003
- ' 50-247, 50-286 TITLE IN FULL:
ORDER NUMBE:,
Please see attachment.
DD-02-06 i
APPROXIMATE NO. OF PAGES IN RECORD:
DATE ENTERE DOCK/T N8/02O.:
__a_2113/02
.50 NO. OF EXHIE 3rTS: one JURISDICTION OF COURT OF APPEALS: yes USCA HAS THIS MATTER BEEN BEFORETHIS COURT PREVIOUSLY? D3Yes ? No IF YES, STATE CASE NAME CITATION: DOCKET NO.:
ATiORNEY(S) FOR PETITIONER(S): Karl (Thpl *n NAME 78 N. Broadway, White Plains, NY 10603 (914)422-4343 ADDRESS TELEPHONE ATTORNEYS FORRESPONDENT(S): Please see attachments.
NAME ADDRESS TELEPHONE APPEAL TAKEN: I AS OF RIGHT 0 BY DISCRETION (SPECIFY STATUTES UNDER WHICH APPEAL IS TAKENý 28 USCA 2342(4)
PETITIONERIAPPLICANT IS 03AGENCY 0 OTHER PARTY 3 NON-PARTY. SPECIFY STANDING. Please see attachment.
FACTS UPON WHICH VENUEIS BASED:Petitioner, Riverkeeper, has its principal office in the 2nd Cir.
NATURE OF ORDER ON WHICH REVIEW OR ENFORCEMENT IS SOUGHT:
- ADM INISTRATIVE REGULATIONIRULEMAKING 0I BENEFITS REVIEW E3UNFAIR LABOR PRACTICE E3 ROUTES: HEALTH & SAFETY EMPLOYER
__ COMMUNICATIONS IMMIGRATION UNION
__ COMMERCE TARIFFS
__ OTHER. (SPECIFY)
CONCISE DESCRIPTION OF PROCEEDINGS BELOW AND ORDER TO BE REVIEWED OR ENFORCED (NOTE THOSE PARTS OF THE ORDER FROM WHICH RELEF IS SOUGHT): Please see attachment.
ISSUES PROPOSED TO BERAISEON PETITION ORAPPUCATION: Please see attachment.
RELIEF SOUGHT: Please see attachment.
TO YOUR KNOWLEDGE, IS THEREANY CASE NOW PENDING ORABOUT TO BE BROUGHT BEFORE THIS COURT ORANY OTHER COURT OR ADM INISTRATIVE AGENCY WHICH:
(A) ARISES FROM SUBSTANTIALLY THE SAME CASE OR CONTROVERSY AS THIS APPEAL? C3YESZ NO (B) INVOLVES AN ISSUE SUBSTANTIALLY THE SAME, SIMILAR, OR REATED TO AN ISSUE IN THIS APPEAL? 0 YESA NO (IF YES, STATE WHETHER "A" OR"B" OR BOTH AND PROVIDE DOCKET: CASE NAME COURT OR AGENCY: CITATION: NUM BER.
FOR PETITIONER OR APPLICANT:
Riverkeeper, Inc. Karl Coplan (914 421-4343 (PRJNT) NAME OF PETITIONER NAME OF COUNSEL OF RECOC/g*PH 02/10/03 ONE DATE SIGNATURE OF COUNSEL OF RECORD
U I1, 0 4
ATTACHMENT TO SECOND CIRCUIT FORM C-A TITLE IN FULL Riverkeeper, Inc., Petitioner, V.
Samuel J. Collins, Director, Office of Nuclear Reactor Regulation; Dr. William Travers, Executive Director for Operations of the Nuclear Regulatory Commission; United States Nuclear Regulatory Commission; the United States of America; Entergy Nuclear Indian Point 2, LLC; Entergy Nuclear Indian Point 3, LLC; and Entergy Nuclear Operations, Inc., Respondents.
ATTORNEYS FOR PETITIONERS Karl Coplan Pace Environmental Litigation Clinic, Inc.
78 N. Broadway White Plain, NY 10603 (914)422-4143 ATTORNEYS FOR RESPONDENTS John Fulton, Esq. Sara E. Brock, Esq.
Entergy Nuclear Operations, Inc. Catherine L. Marco, Esq.
440 Hamilton Avenue Office of the General Counsel White Plains, NY 10601 Mail Stop- 0-15 D21 U.S. Nuclear Regulatory Commission Jay E. Silberg Washington, DC 20555-0001 Matias F. Travieso-Diaz Paul A. Gaukler John Ashcroft Shaw Pittman, LLP United States Attorney General 2300 N Street, NW United States Department of Justice Washington, DC 20037 950 Pennsylvania Avenue, NW (202)663-8000 Washington, DC 20530-0001 (202)353-1555 SPECIFY STANDING Organizational - Petitioner, Riverkeeper, Inc., has members who are personally affected.
Statutory - 42 U.S.C. § 2014 (5); 42 U.S.C. § 2239.
1
.4 6
CONCISE DESCRIPTION OF PROCEEDINGS BELOW AND ORDER TO BE REVIEWED OR ENFORCED 2.206 Petition On November 8, 2001, pursuant to 10 C.F.R. § 2.206, Riverkeeper filed a petition (supplemented on December 20, 2001) with Dr. William Travers, Executive Director for Operations of the Nuclear Regulatory Commission (NRC). Riverkeeper requested that the NRC:
1.) Order the licensee to suspend operations, revoke the license, or adopt other measures resulting in a temporary shutdown of the Indian Point 2 and 3 ("IP2 and IP3").
2.) Order the licensee to conduct a full review of the facilities' vulnerabilities, security measures and evacuation plans.
3.) Require Entergy to provide information documenting the existing and readily attainable security measures which protect IP2 and IP3 against land, water, and airborne terrorist attacks.
4.) Immediately modify the IP 2 and IP3 operating licenses to mandate specified security measures sufficient to protect the facility, including institution of a no-fly zone surrounding the plant and barriers to attack from the Hudson River.
5.) Order the revision of the licensee's Emergency Response Plan to account for possible terrorist attacks and prepare a comprehensive response to multiple, simultaneous attacks.
6.) In the absence of available measures to ensure the security of the IP facility against terrorist attacks, to take prompt action to permanently retire the facility.
7.) Order the licensee to immediately convert from water-cooled to hardened dry cask system for spent fuel storage as a measure to protect spent fuel storage from terrorist attacks.
Petitioner seeks relief from the Nuclear Regulatory Commission's denial of items 1, 4, 5, 6, 7.
NRC Response (Final Action)
NRC responded to the 2.206 petition on November 18, 2002 (final for purposes of review on December 16, 2002) by:
1.) Partially granting the request for immediate security upgrade by issuing NRC February 25, 2002 Orders to all nuclear power plants to review security preparedness, but denying any temporary shutdown of IP2 or IP3.
2.) Partially granting a full review of the facilities' vulnerabilities, security measures and evacuation plans.
3.) Denying the request for specific information about the security measures because of policy to not release safeguards information to the public.
4.) Denying the request to mandate certain security measures such as no-fly zone.
5.) Denying the request to require revision of the licensee's Emergency Response Plan.
6.) Denying the request to order dry-cask storage of spent fuel.
NRC stated that the decision constitutes final action.
2
NI The NRC decision is signed by Samuel J. Collins, Director, Office of Nuclear Reactor Regulation.
ISSUES PROPOSED TO BE RAISED ON PETITION OR APPLICATION:
- 1. Where NRC has acknowledged that there is a "gap" between the licensee's capability to protect against terrorist attacks and the protections provided by the government at the Indian Point site, and given the National Research Council's determination that "the potential for a September 11-type surprise attack in the near term [on a nuclear power plant is]... high," did the Nuclear Regulatory Commission abdicate its statutory duty to "to protect health and to minimize dangers to life or property..." under 42 U.S.C. § 2201 (i), when the NRC denied Riverkeeper's request to adopt measures to temporarily shut down IP2 and IP3?
II. Where NRC has acknowledged that there is a "gap" between the licensee's ability to protect the plant against airborne terrorist attack and the protections provided by the government, and given the National Research Council's determination that "the potential for a September 11-type surprise attack in the near term [on a nuclear power plant is]...
high," did the Nuclear Regulatory Commission abdicate its statutory duty "to protect health and to minimize dangers to life or property..." under 42 U.S.C. § 2201 (i) by failing to order the immediate shut down of the Indian Point facility?
III. Where NRC has acknowledged that there is a "gap" between the lic*ensee's ability to protect the plant against airborne terrorist attack and the protections provided by the government, and given the National Research Council's determination that "the potential for a September 11-type surprise attack in the near term [on a nuclear power plant is]...
high," did the Nuclear Regulatory Commission abdicate its statutory duty "to protect health and to minimize dangers to life or property..." under 42 U.S.C. § 2201 (i) by failing to order the revision of the licensee's Emergency Response plan?
IV. Where NRC has acknowledged that there is a "gap" between the licensee's ability to protect the plant against airborne terrorist attack and the protections provided by the government, and given the National Research Council's determination that "the potential for a September 11-type surprise attack in the near term [on a nuclear power plant is]...
high," did the Nuclear Regulatory Commission abdicate its statutory duty "to protect health and to minimize dangers to life or property..." under 42 U.S.C. § 2201 (i) by failing to condition continued operation of the IP2 and IP3 power plants on the implementation of specific protective measures such as a no-fly zone and physical barriers to attack from the Hudson River?
V. Where NRC has acknowledged that there is a "gap" between the licensee's ability to protect the plant against airborne terrorist attack and the protections provided by the government, and given the National Research Council's determination that "the potential for a September 11-type surprise attack in the near term [on a nuclear power plant is]...
high," did the Nuclear Regulatory Commission abdicate its statutory duty "to protect 3
a
-4 4 . .-
a 6.
health and to minimize dangers to life or property..." under 42 U.S.C. § 2201 (i) by failing to order the licensee to convert to dry-cask storage for all of its 30 years worth of spent fuel rods currently located onsite as a measure to protect against dispersal of spent fuel rod radiation in a terrorist attack?
RELIEF SOUGHT:
I. An order remanding to the NRC to require immediate suspension of operation of Indian Point 2 and Indian Point 3 and immediate and permanent revocation of Indian Point license if, after conducting a full review of the facility's vulnerabilities, security measures and evacuation plans, the NRC cannot protect health or minimize danger to life or property of the plant through available protective measures including a no fly zone around the plants and physical barriers to attack from the Hudson River.
II. An order remanding to the NRC to require immediate conversion of the current spent fuel storage technology from a water cooled system to a hardened dry-cask system in a bunkered structure in order to reduce the long-term risk associated with potential exothermic oxidation within the existing on-site spent fuel storage facility and to protect against a terrorist attack. The NRC must also require the fortification of the spent fuel pool storage building which will continue to house irradiated fuel less than five years old.
III. An order remanding to the NRC to require the revision of the licensee's Emergency Response Plan in order to prepare for near-term threats of terrorist attacks.
4
a, 4 a b4
.4 ,,.
1t 4I . a 01, Certificate of Service I hereby certify that copies of within "Petition For Review of the Final Order of the Executive Director of Operations of the United States Nuclear Regulatory Commission, Director's Decision, DD-02-06" and Second Circuit form C-A in the above-captioned proceeding have been served on the following by deposit in the United States mail, first class, this I0th day of February, 2003:
Attorneys for Entergy Attorneys for Nuclear Regulatory Commission John Fulton, Esq. Sara E. Brock, Esq.§ Entergy Nuclear Operations, Inc. Catherine L. Marco, Esq.
440 Hamilton Avenue Office of the General Counsel White Plains, NY 10601 Mail Stop- 0-15 D21 U.S. Nuclear Regulatory Commission Jay E. Silberg Washington, DC 20555-0001 Matias F. Travieso-Diaz Paul A. Gaukler Attorney for United States Shaw Pittman, LLP John Ashcroft 2300 N Street, NW United States Attorney General Washington, DC 20037 United States Department of Justice (202)663-8000 950 Pennsylvania Avenue, NW Washington, DC 20530-0001 (202)353-1555 Nicole Harkin, Legal Intern