CRYSTAL RIVER UNIT #3 SUPERINTENDENT SHIFT OPERATIONS' LOG A Ftogrole IWEgy C- l.nY N

Wednesday, March 20,2002 Martin Wolf / Chuck Morris / Dave Schulker 1200-2300 PLANT STATUS: Mode 1, 100% Power, 2544 MWTH,888 MWE Primary: 579 TAvE, 1518 ppmb, PZR 220", 72 gpm Letdown, Secondary: 79175% OTSG, 2.0" Hga Vacuum, 77°F UHS Rx Bldg.: 114'F Ave., 0.0 psig, AHF-1C: Low, AHF-1B; High & SW Cooled int Time* Item Description m 1245 Relief Assumed the duties of the Superintendent Shift Operations [1205]. Chuck Morris assumes the duties of the Control Room Supervisor [1157].

"` 1515 Relief Dave Schulker assumes the duties of the Control Room Supervisor [1510].

MOW 1800 Turtle Received notification from Pete Ezzell that the turtle transported to the Update Mariculture Center last evening was dead when the Natural Resources Unit Staff arrived to identify the species. A necropsy of the turtle will be performed to evaluate reportability requirements.

M 2220 SP-348A Auxiliary Feedwater Pump (FWP-7) Testing and MTDG-1 Surveillance Test has been completed satisfactorily. A Dedicated Operator was stationed while the FWP-7 full-flow recirculation valve FWV-226 was open so no Maintenance Rule unavailability was accumulated during the SP.

(No Additional Log Entries This Shift)