Superintendent Shift Operations' Log, 0700-1500
ML030070118
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/01/2002
From: Rawls R, Simon S
Florida Power Corp
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0059
Download: ML030070118 (1)


Text

CRYSTAL RIVER UNIT #3 SUPERINTENDENT SHIFT OPERATIONS' LOG FLORIDA PO"ER A Iog'e- 3sn.rgy Conpany Friday, March 1, 2002 Shawn Simon/ Ricky Rawls 0700-1500 PLANT STATUS: Mode 1, 100% Power, 2544 MWTH, 888 MWE, Primary: 579F Tayg/ 2148 psig/ 1536 ppmb/ 218" PZR/ 4 RCPs/ 68 gpm letdown, Secondary: 79/75% OTSGs/ 899 psig MS/ 1.4" Hga cond. press/ 58F UHS/ 4 CWPs, RB: 118F avg -0.1 psig/ AHF-1A in low and AHF-1B in high & cooled by SW.

Init Time Item Description sMs 0815 Relief Assumed the duties of the Superintendent Shift Operations [0630].

Ricky Rawls assumed the duties of the Control Room Supervisor[0703].

sMs 0950 BS-90-PT Calibration has been authorized per the maintenance schedule. The SP-162 actions of ITS 3.3.17 Condition A became applicable [0931].

SMS 1132 Fire Drill A scheduled drill was held for the crew [0945].

sMs 1144 Turtle Received notification from Site Security that a healthy turtle has been Reportable rescued from the intake and transported to the Mariculture Center. The turtle is approximately 20 inches in diameter and weighs around 15 pounds. The Mariculture StaffL. Olsen) has identified the species as a Green Sea Turtle. A 4 Hour Non-Emergency report has been made to the NRC per 10 CFR 50.72 for the offsite notification (NMFS) related to capture of the latest turtle (#66) this biennial period (NRC Event# 38602 Updated) [1122]. This condition has been documented on NCR 56669. Notifications have been made to: NRC ENS (G. Waig), NRC Resident (S. Stewart), PGM (D. Roderick), MSO_ D. Jones)', and the Regulatory representative$. Bright).

sMs 1150 SP-323 Evacuation and Fire Alarm Demonstration has been completed satisfactorily.

sMs 1155 RM-G26 Radiation Monitoring Instrumentation Functional Test RMG's has been RM-G27 completed satisfactorily for RM-G26 and RM-G27 only [1144]. Further maintenance and calibration is required. This has restored functionality (Maintenance Rule available) to the monitors.

SSO Page 2

- Indicates time log entry was Initsted