Tech Spec Page for Amendment No. 224 Missed Surveillances
ML022390060
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/26/2002
From:
NRC/NRR/DLPM
To:
References
TAC MB4953, TAC MB4954
Download: ML022390060 (1)


Text

SR Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified LCOs, unless conditions in the Applicability for individual to meet a Surveillance, otherwise stated in the SR. Failure the performance whether such failure is experienced during between performances of the of the Surveillance or to meet the LCO. Failure to Surveillance, shall be failure shall perform a Surveillance within the specified Frequency in SR 3.0.3.

be failure to meet the LCO except as provided Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if theinterval Surveillance is performed within 1.25 times the the previous specified in the Frequency, as measured from a specified performance or as measured frommet. the time condition of the Frequency is For Frequencies specified as "once," the above interval extension does not apply.

If a Completion Time requires periodic performance on a

" per . . " basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 3.0.3 If it is discovered that a Surveillance was not with performed Frequency, then compliance the within its specified from requirement to declare the LCO not met ormayup betodelayed, the limit of the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is greater. This delay the specified Frequency, whichever Ii period is permitted to allow performance of the Surveillance. A risk evaluation shallhours be performed for any Surveillance delayed greater than 24 and the risk impact shall be managed.

within the delay If the Surveillance is not performed declared period, the LCO must immediately be not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within must the delay period and the Surveillance is not met, the LCO immediately be be declared not met, and the applicable Condition(s) must entered.

(continued) 3.0-4 Amendment No. 224 I Brunswick Unit 1