Letter Sequence Approval |
---|
|
|
MONTHYEARML0203603422002-02-0707 February 2002 Memo Email Transmission Issues to Be Discussed in an Upcoming Conference Call (Tac No. MB3708) Project stage: Other ML0207204342002-03-12012 March 2002 Technical Specification Pages for Amendment 156, Limerick, Unit 1 Project stage: Other ML0202600012002-03-12012 March 2002 Issuance of Amendment License Amendment Request 01-01092, Safety Limit Minimum Critical Power Ratio Change (Tac No. MB3708) Project stage: Approval 2002-02-07
[Table View] |
|
---|
Category:Letter
MONTHYEARML24151A3842024-10-31031 October 2024 – Issuance of Amendment Nos. 264 and 226 Support to Digital Modernization Project Installation (EPID L-2023-LLA-0025) and Exemption from the Requirements of 10 CFR 50.62 ML24303A0902024-10-29029 October 2024 Operator Licensing Examination Approval ML24303A2782024-10-29029 October 2024 10 CFR 50.46 Annual Report ML24299A2642024-10-25025 October 2024 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications IR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR 05000352/LER-2024-003, Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK1232024-06-18018 June 2024 Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK123 ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 05000352/LER-2024-002, Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker2024-06-10010 June 2024 Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure 05000352/LER-2024-001, Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit2024-06-10010 June 2024 Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . 2024-09-06
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML23321A2362023-12-14014 December 2023 Issuance of Amendment Nos. 262 and 224 Adoption of TSTF-477, Revision 3 and Associated Technical Specification Changes ML23145A1972023-06-23023 June 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 255, 256, 257, 258, 259, and 260 ML23089A1242023-05-17017 May 2023 Issuance of Amd Nos. 261 & 223 Alternate Seismic Approach for Risk-Informed Categorization and Treatment of Structures, Systems a Components for NPR and Denial Proposed Alternative Defense in Depth and Pressure Boundary Component ML22348A1762023-03-0707 March 2023 Issuance of Amendment Nos. 260 and 222 Regarding Technical Specifications 3.3.7.4, Remote Shutdown System Instrumentation and Controls ML22272A0372023-01-0303 January 2023 Issuance of Amendment Nos. 258 and 220 Regarding Technical Specifications 3/4.8.1, AC Sources-Operating and 3/4.5.1, ECCS-Operating ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22003A1862022-02-17017 February 2022 Issuance of Amendment Nos. 256 and 218 Technical Specification Changes Related to Technical Specifications Task Force (TSTF) Traveler 205-A, Revision 3, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21263A2482021-10-0101 October 2021 Audit Plan Supporting LAR Request to Implement Alternate Defense-in-Depth, Pressure Boundary, & Seismic Tier 1 Categorization Process in Accordance with Requirements of 10 CFR 50.69 ML21181A0442021-09-28028 September 2021 Issuance of Amendment Nos. 253 and 215 Technical Specification Changes Related to Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML21032A2702021-02-22022 February 2021 Issuance of Amendment Nos. 252 and 214, Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20255A0632020-12-0101 December 2020 Issuance of Amendment Nos. 250 and 212 Technical Specification Changes Related to Inservice Testing Program of the Safety Relief Valves ML20239A7252020-11-30030 November 2020 Issuance of Amendment Nos. 249 and 211 Adopt TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities ML20160A4592020-08-0707 August 2020 Issuance of Amendment Nos. 248 and 210 Revise Technical Specifications to Support Implementation of 10 CFR 50.69 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20098C9222020-04-0909 April 2020 Issuance of Amendment No. 245 Regarding Technical Specifications Change to Allow a One-Time Increase in Main Steam Isolation Valve Allowable Leakage Rate (EPID L-2020-LLA-0064) (Emergency Circumstances) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20034G5462020-03-12012 March 2020 Issuance of Amendments Revising Instrument Testing and Calibration Definitions ML20034F6372020-02-28028 February 2020 Issuance of Amendment Nos. 240 and 203 to Implement TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML19207A0062019-10-0303 October 2019 Issuance of Amendment Nos. 237 and 200 Revise Technical Specifications to Allow Penetration Flow Path Isolation for Inoperable Isolation Actuation Instrumentation ML19176A0332019-08-28028 August 2019 Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR RS-19-017, Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control2019-06-14014 June 2019 Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control ML19078A0182019-05-24024 May 2019 Issuance of Amendment Nos. 235, 198, 14, 325, and 328 to Revise the Emergency Response Organization Staffing Requirements ML19036A9132019-02-28028 February 2019 Issuance of Amendment Nos. 234 and 197 Adopt TSTF-372, Revision 4, Addition of LCO 3.0.8, Inoperability of Snubbers ML18304A3652019-01-16016 January 2019 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements ML18255A2782018-11-27027 November 2018 Issuance of Amendment Nos. 232 and 195 to Revise Technical Specifications to Lower the Minimum Standby Liquid Control System Pump Flowrate ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18165A1622018-07-31031 July 2018 Issuance of Amendment Nos. 230 and 193 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components (CAC Nos. MF9873 and MF9874; EPID L-2017-LLA-0275) ML18113A0452018-05-29029 May 2018 Issuance of Amendments to Revise Technical Specification Requirements for Secondary Containment ML18025B7692018-02-28028 February 2018 Issuance of Amendment Nos. 228 and 191 Revising Technical Specifications to Relocate Main Condenser Offgas Monitoring Instrumentation and Gaseous Effluents TSs (CAC Nos. MF9650 and MF9651; EPID L-2017-LLA-0214) ML18017A2012018-02-27027 February 2018 Issuance of Amendment Nos. 227 and 190 Revising Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC Nos. MF9967 and MF9968; EPID L-2017-LLA-0260) ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) ML17073A0672017-05-26026 May 2017 Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256) ML17103A0812017-05-16016 May 2017 Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-545 ML17024A0892017-03-29029 March 2017 Issuance of Amendments Safety Limit Minimum Critical Power Ratio Change ML17047A3532017-03-15015 March 2017 Issuance of Amendment Partial Length Fuel Rod Burnup ML16356A2722017-02-28028 February 2017 Issuance of Amendments to Revise High Pressure Coolant Injection System and Reactor Core Isolation Cooling System Actuation Instrumentation Technical Specifications ML16335A0382016-12-29029 December 2016 Issuance of Amendments to Revise Technical Specification Snubber Requirements ML16307A0122016-12-0505 December 2016 Correction to Amendment No. 185 Regarding Application of an Alternative Source Methodology ML16041A0212016-03-15015 March 2016 Issuance of Amendment Safety Limit Minimum Critical Power Ratio Change ML15356A1402016-01-28028 January 2016 Issuance of Amendments Secondary Containment Access Openings ML15218A5012015-09-15015 September 2015 Issuance of Amendment Nos. 219 and 181 Proposed Change to Add New Limiting Conditions for Operation 3.0.5 and 3.0.6 ML15153A2822015-07-30030 July 2015 Issuance of Amendments Revising the Completion Date for Milestone 8 of the Cyber Security Plan (TAC Nos. MF4728, MF4729, MF4730, MF4731, MF4732, MF4733, MF4734, MF4735, MF4736, MF4737, MF4738, MF4739, MF4740 2024-05-23
[Table view] Category:Safety Evaluation
MONTHYEARML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML23321A2362023-12-14014 December 2023 Issuance of Amendment Nos. 262 and 224 Adoption of TSTF-477, Revision 3 and Associated Technical Specification Changes ML23089A1242023-05-17017 May 2023 Issuance of Amd Nos. 261 & 223 Alternate Seismic Approach for Risk-Informed Categorization and Treatment of Structures, Systems a Components for NPR and Denial Proposed Alternative Defense in Depth and Pressure Boundary Component ML23094A1792023-05-17017 May 2023 Amd Nos. 261 & 223 Alternate Seismic Approach for Risk-Informed Categorization & Treatment of Structures, Systems, Components for NPR & Denial of Proposed Alternative Defense in Depth & Pressure Boundary Component-Partial Denial SE Encl 4 ML23094A1712023-05-17017 May 2023 Amd Nos. 261 & 223 Alternate Seismic Approach for Risk-Informed Categorization & Treatment of Structures, Systems and Components for NPR and Denial Proposed Alternative Defense in Depth and Pressure Boundary Component ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML22348A1762023-03-0707 March 2023 Issuance of Amendment Nos. 260 and 222 Regarding Technical Specifications 3.3.7.4, Remote Shutdown System Instrumentation and Controls ML23005A0082023-02-23023 February 2023 Technical Specifications to Correct Non-conservative Technical Specification Table 3.3.2-1 for Main Steam Line Isolation Trip Function 1.G (EPID L 2020 Lla 0034) Amds. 259 and 221 ML22272A0372023-01-0303 January 2023 Issuance of Amendment Nos. 258 and 220 Regarding Technical Specifications 3/4.8.1, AC Sources-Operating and 3/4.5.1, ECCS-Operating ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22094A0012022-04-15015 April 2022 Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) ML22003A1862022-02-17017 February 2022 Issuance of Amendment Nos. 256 and 218 Technical Specification Changes Related to Technical Specifications Task Force (TSTF) Traveler 205-A, Revision 3, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21181A0442021-09-28028 September 2021 Issuance of Amendment Nos. 253 and 215 Technical Specification Changes Related to Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21172A2682021-09-0202 September 2021 Issuance of Relief Request I4r-24 Associated with Residual Heat Removal Heat Exchanger Category C-A and C-B Examinations for the Remainder of the Fourth 10-Year Isi Interval and Up to the End of the 60-Year Operating License ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21166A1682021-06-25025 June 2021 ML21032A2702021-02-22022 February 2021 Issuance of Amendment Nos. 252 and 214, Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20322A0092020-12-10010 December 2020 Issuance of Alternative Requests 41-VRR-8 and 41-VRR-7 Regarding Certain Inservice Testing Program Requirements for Safety Relief Valves ML20255A0632020-12-0101 December 2020 Issuance of Amendment Nos. 250 and 212 Technical Specification Changes Related to Inservice Testing Program of the Safety Relief Valves ML20239A7252020-11-30030 November 2020 Issuance of Amendment Nos. 249 and 211 Adopt TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20280A7572020-11-0505 November 2020 Revised Safety Evaluation of Relief Requests GVRR-8, 11 PRR-1, 90 PRR-1, and 47 VRR-2 Regarding the Fourth 10-Year Interval of the Inservice Testing Program (EPID L-2018-LLR-0384 Through EPID L-2018-LLR-0387) ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20232A1712020-09-0101 September 2020 Request to Use Alternative Code Case OMN-26 ML20160A4592020-08-0707 August 2020 Issuance of Amendment Nos. 248 and 210 Revise Technical Specifications to Support Implementation of 10 CFR 50.69 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20090B4102020-06-0202 June 2020 Issuance of Relief Request GVRR-9 Associated with Pandemic-Related Issues - Inservice Testing Interval Extension for Motor Operated Valves (EPID L-2020-LLR-0046 (COVID-19)) ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20089A0012020-04-20020 April 2020 Issuance of Relief Request I4R-23 Associated with Pandemic-Related Issues - Examination of Containment Surfaces Requiring Augmented Examination (Category E-C) (EPID L-2020-LLR-0044 (COVID-19)) ML20098C9222020-04-0909 April 2020 Issuance of Amendment No. 245 Regarding Technical Specifications Change to Allow a One-Time Increase in Main Steam Isolation Valve Allowable Leakage Rate (EPID L-2020-LLA-0064) (Emergency Circumstances) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20034F6372020-02-28028 February 2020 Issuance of Amendment Nos. 240 and 203 to Implement TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML20028E3992020-02-0404 February 2020 Proposed Alternative to Use ASME Code Case N-879 ML19207A0062019-10-0303 October 2019 Issuance of Amendment Nos. 237 and 200 Revise Technical Specifications to Allow Penetration Flow Path Isolation for Inoperable Isolation Actuation Instrumentation ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19176A0332019-08-28028 August 2019 Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 ML19078A0182019-05-24024 May 2019 Issuance of Amendment Nos. 235, 198, 14, 325, and 328 to Revise the Emergency Response Organization Staffing Requirements ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins ML19099A2632019-04-22022 April 2019 Issuance of Relief Request 14R-08, Revision 1, Regarding Pressure Testing of Containment Atmospheric Control Penetration Piping ML19099A3072019-04-16016 April 2019 Issuance of Relief Request 14R-18 Associated with Inaccessible Supports for the Fourth 10-Year Inservice Inspection Interval Pipping 2024-07-29
[Table view] |
Text
March 12, 2002 Mr. Oliver D. Kingsley, President Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348
SUBJECT:
LIMERICK GENERATING STATION, UNIT 1 - ISSUANCE OF AMENDMENT RE: LICENSE AMENDMENT REQUEST 01-01092, SAFETY LIMIT MINIMUM CRITICAL POWER RATIO CHANGE (TAC NO. MB3708)
Dear Mr. Kingsley:
The Commission has issued the enclosed Amendment No. 156 to Facility Operating License No. NPF-39 for the Limerick Generating Station, Unit 1. This amendment consists of changes to the Technical Specifications (TSs) in response to your application dated December 21, 2001, as supplemented by letter dated February 15, 2002.
This amendment revises TS Section 2.1 to incorporate revised safety limit minimum critical power ratios due to the cycle-specific analysis performed by Global Nuclear Fuel for Limerick Generating Station, Unit 1, Cycle 10.
A copy of our safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Christopher Gratton, Sr. Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-352
Enclosures:
- 1. Amendment No. 156 to License No. NPF-39
- 2. Safety Evaluation cc w/encls: See next page
March 12, 2002 Mr. Oliver D. Kingsley, President Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348
SUBJECT:
LIMERICK GENERATING STATION, UNIT 1 - ISSUANCE OF AMENDMENT RE: LICENSE AMENDMENT REQUEST 01-01092, SAFETY LIMIT MINIMUM CRITICAL POWER RATIO CHANGE (TAC NO. MB3708)
Dear Mr. Kingsley:
The Commission has issued the enclosed Amendment No. 156 to Facility Operating License No. NPF-39 for the Limerick Generating Station, Unit 1. This amendment consists of changes to the Technical Specifications (TSs) in response to your application dated December 21, 2001, as supplemented by letter dated February 15, 2002.
This amendment revises TS Section 2.1 to incorporate revised safety limit minimum critical power ratios due to the cycle-specific analysis performed by Global Nuclear Fuel for Limerick Generating Station, Unit 1, Cycle 10.
A copy of our safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Christopher Gratton, Sr. Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-352
Enclosures:
- 1. Amendment No. 156 to License No. NPF-39
- 2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
MO'Brien WBeckner PUBLIC CGratton RCaruso PDI-2 R/F OGC ACRS EAdensam GHill (2) JClifford BPlatchek, RGN-I THuang DOCUMENT NAME: C:\Program Files\Adobe\Acrobat 4.0\PDF Output\AMD MB3708 MCPR U1.wpd Accession Number: ML020260001 OFFICE PDI-2\PM PDI-2\LA OGC DSSA\SRXB PDI-2\SC NAME CGratton SLittle for MOBrien AHodgdon RCaruso JClifford DATE 3/5/02 3/5/02 3/6/02 3/5/02 3/11/02 Official Record Copy
Limerick Generating Station, Units 1 & 2 cc:
Edward J. Cullen, Jr. Library Vice President & General Counsel U.S. Nuclear Regulatory Commission Exelon Generation Company, LLC Region I 300 Exelon Way 475 Allendale Road Kennett Square, PA 19348 King of Prussia, PA 19406 Manager-Limerick Licensing Dr. Judith Johnsrud Exelon Generation Company, LLC National Energy Committee Nuclear Group Headquarters Sierra Club Correspondence Control 433 Orlando Avenue P.O. Box 160 State College, PA 16803 Kennett Square, PA 19348 Mr. Jeffrey A. Benjamin Mr. William Levis, Site Vice President Licensing - Vice President Limerick Generating Station Exelon Corporation P.O. Box 2300 1400 Opus Place, Suite 900 Sanatoga, PA 19464 Downers Grove, IL 60515 Mr. R. Braun Mr. Michael P. Gallagher Plant Manager Director-Licensing Limerick Generating Station Exelon Generation Company, LLC P.O. Box 2300 Nuclear Group Headquarters Sanatoga, PA 19464 Correspondence Control P. O. Box 160 Regional Administrator, Region I Kennett Square, PA 19348 U.S. Nuclear Regulatory Commission 475 Allendale Road Correspondence Control Desk King of Prussia, PA 19406 Exelon Generation Company, LLC 200 Exelon Way, KSA 1-N-1 Senior Resident Inspector Kennett Square, PA 19348 U.S. Nuclear Regulatory Commission Limerick Generating Station Mr. John Skolds P.O. Box 596 Chief Operating Officer Pottstown, PA 19464 Exelon Generation Company, LLC 1400 Opus Place, Suite 900 Chairman Downers Grove, IL 60515 Board of Supervisors of Limerick Township Mr. William Bohlke 646 West Ridge Pike Senior Vice President, Nuclear Services Linfield, PA 19468 Exelon Generation Company, LLC 1400 Opus Place, Suite 900 Chief-Division of Nuclear Safety Downers Grove, IL 60515 PA Dept. of Environmental Resources P.O. Box 8469 Harrisburg, PA 17105-8469
Limerick Generating Station, Units 1 & 2 cc:
Mr. John Cotton Senior Vice President, Operations Support Exelon Generation Company, LLC 1400 Opus Place, Suite 900 Downers Grove, IL 60515 Mr. Joseph Hagan Senior Vice President Mid-Atlantic Regional Operating Group Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Ms. K. Gallogly Regulatory Assurance Manager Limerick Generating Station P.O. Box 2300 Sanatoga, PA 19464
EXELON GENERATION COMPANY, LLC DOCKET NO. 50-352 LIMERICK GENERATING STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 156 License No. NPF-39
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Exelon Generation Company, LLC (the licensee) dated December 21, 2001, as supplemented February 15, 2002, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-39 is hereby amended to read as follows:
Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 156, are hereby incorporated in the license. Exelon Generation Company, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA VNerses for/
James W. Clifford, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: March 12, 2002
ATTACHMENT TO LICENSE AMENDMENT NO. 156 FACILITY OPERATING LICENSE NO. NPF-39 DOCKET NO. 50-352 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 2-1 2-1 B 2-1 B 2-1
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 156 TO FACILITY OPERATING LICENSE NO. NPF-57 EXELON GENERATION COMPANY, LLC LIMERICK GENERATING STATION, UNIT 1 DOCKET NO. 50-352
1.0 INTRODUCTION
By letter dated December 21, 2001, as supplemented by letter dated February 15, 2002, the Exelon Generation Company, LLC (the licensee), submitted a request for changes to the Limerick Generating Station (LGS), Unit 1, Technical Specifications (TSs). The requested changes would revise TS 2.1.2 to incorporate revised safety limit minimum critical power ratios (SLMCPRs) due to the cycle-specific analysis performed by Global Nuclear Fuel - Americas, LLC (GNF-A), for LGS, Unit 1, Cycle 10. The February 15, 2002, letter provided clarifying information that did not change the initial proposed no significant hazards consideration determination.
2.0 BACKGROUND
The licensee requested the following changes to LGS Unit 1 TS 2.1.2, THERMAL POWER, High Pressure and High Flow. The licensee proposed to change the SLMCPR values for LGS Unit 1, Cycle 10, from 1.12 to 1.10 for dual recirculation loop operation (DLO), and from 1.14 to 1.11 for single recirculation loop operation (SLO), with the reactor vessel steam dome pressure greater than 785 psig and core flow greater than 10% of rated flow. The LGS Unit 1, Cycle 10, core is comprised of 764 fuel assemblies; 280 fresh GE14 bundles, 264 once-burned GE13 fuel bundles, and 220 twice-burned GE13 fuel bundles.
The licensee described the approved methodologies used to calculate the SLMCPR value for the proposed TS change in their application dated December 21, 2001. The LGS Unit 1, Cycle 10, SLMCPR analysis was performed by GNF-A using plant- and cycle-specific fuel and core parameters, and NRC-approved methodologies including NEDC-32505P, Revision 1 (R-Factor Calculation Method for GE11, GE12 and GE13 Fuel), NEEDO-10958-A (GETAB),
NEDC-32601P (Methodology and Uncertainties for Safety Limit MCPR Evaluations), NEDC-32694P (Power Distribution Uncertainties for Safety Limit MCPR Evaluation), and Amendment 25 to NEDE-24011-P-A (GESTAR II).
During the week of March 26, 2001, the NRC staff visited the GNF-A engineering and manufacturing facility in Wilmington, North Carolina, to conduct an onsite review of the safety analyses and system and component performance evaluations used to support the Duane Arnold Energy Center (DAEC) extended power uprate application. The staffs audit covered several areas, some of which had an impact on the LGS Unit 1, Cycle 10, SLMCPR TS
amendment review and will be discussed in Section 3.0 of this safety evaluation. The purpose of the GNF-A audit, the findings, and the NRC staffs resolution to those findings are documented in NRC staff letter, Duane Arnold Energy Center - Issuance of Amendment Regarding Extended Power Uprate (TAC NO. MB0543), dated November 6, 2001.
3.0 EVALUATION The staff reviewed (1) issues identified during the NRC staffs audit of the GNF-A data bases for the GEXL14 correlation as they apply to the LGS Unit 1, Cycle 10, SLMCPR TS amendment review; (2) whether previously approved methodologies used to calculate SLMCPR were acceptable for calculating the SLMCPRs for reactor cores using newer GE14 fuel; and (3) the justification for the changes to the LGS Unit 1, Cycle 10, SLMCPR from 1.12 to 1.10 for DLO, and from 1.14 to 1.11 for SLO, using the approach stated in Amendment 25 to GESTAR II.
The NRC staff identified discrepancies in data bases while conducting an audit of GNF-As GEXL14 correlation development for the DAEC plant-specific extended power uprate application. The details of the deficiencies were documented in an NRC request for additional information (RAI) to Mr. Gary Van Middlesworth of the DAEC, dated June 4, 2001. Based on the findings of that audit, the NRC staff requested that LGS provide a justification why the overall GEXL14 correlation uncertainty for LGS Unit 1, Cycle 10, remains valid. In their response to the NRC staffs RAI dated February 15, 2002, the licensee provided the results of additional analyses that indicated there was sufficient conservatism associated with the reduced power distribution uncertainties to compensate for the impact due to the outlet peaked power shape on LGS Unit 1, Cycle 10, SLMCPR values such that the SLO and DLO TS SLMCPRs did not need to be changed. The NRC staff reviewed the licensees evaluation and found it to be acceptable because the licensee used an NRC-approved methodology to resolve the discrepancy in the GFN-A data bases for the GEXL14 correlation.
To address the audit issue of the applicability of the previously-approved methodologies to GE14 fuel, GNF-A submitted two letters for the staffs review: (1) FLN-2001-016, from Glen A.
Watford, to USNRC, Confirmation of 10x10 Fuel Design Applicability to Improved SLMCPR, Power Distribution and R-Factor Methodologies, dated September 24, 2001; and (2) FLN-2001-017, from Glen A. Watford, to USNRC, Confirmation of the Applicability of the GEXL14 Correlation and Associated R-Factor Methodology for Calculating SLMCPR Values in Core Containing GE14 Fuel, dated October 1, 2001. The NRC staff reviewed the GNF-As evaluation contained in the two letters and found that the approach, supplemented by the approach dealing with a proposed higher interim GEXL14 correlation uncertainty discussed in the licensees RAI response, dated February 15, 2002, is acceptable for this application because the licensee used an NRC-approved methodology to resolve the audit issue regarding the application of the proposed higher, interim GEXL14 correlation uncertainty to the reload analyses.
The NRC staff reviewed the licensees application dated December 21, 2001, and the response to the NRC staffs RAI dated February 15, 2002, including the detailed summary results of the analysis for LGS Unit 1, Cycle 10, operation in Table 1 of Attachment 4 of the application, and Table 1 of Attachment 2 in the response to the RAI, to determine whether the proposed changes to the LGS Unit 1 SLMCPR values were justified. The staff found that the proposed LGS Unit 1, Cycle 10, SLMCPR values will ensure that 99.9% of the fuel rods in the core will
not experience boiling transition, which satisfies the requirements of Generic Design Criterion 10 of Appendix A to Title 10 of the Code of Federal Regulations (10 CFR), Part 50 regarding acceptable fuel design limits. Therefore, the staff concludes that the SLMCPR analysis for LGS Unit 1, Cycle 10, operation, which uses plant- and cycle-specific parameters in conjunction with an approved method, is acceptable. The staff also concludes that the SLMCPR values of 1.10 for DLO and 1.11 for SLO are acceptable for LGS Unit 1, Cycle 10, since previously approved methodologies were used.
The NRC staff reviewed the changes to TS Bases 2.0, Introduction, and found them consistent with the proposed changes.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Pennsylvania State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (67 FR 2924). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
5.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Tai Huang Date: March 12, 2002