Issuance of Amd Nos. 261 & 223 Alternate Seismic Approach for Risk-Informed Categorization and Treatment of Structures, Systems a Components for NPR and Denial Proposed Alternative Defense in Depth and Pressure Boundary Component
ML23089A124
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/17/2023
From: Jamie Heisserer
Plant Licensing Branch 1
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
Sreenivas V, NRR/DORL/LPLI, 415-2597
References
EPID L-2021-LLA-0042
Download: ML23089A124 (13)


Text

May 17, 2023 Mr. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

LIMERICK GENERATING STATION, UNITS 1 AND 2 ISSUANCE OF AMENDMENT NOS. 261 AND 223 RE: ALTERNATIVE SEISMIC APPROACH FOR RISK-INFORMED CATEGORIZATION AND TREATMENT OF STRUCTURES, SYSTEMS AND COMPONENTS FOR NUCLEAR POWER REACTORS AND DENIAL OF PROPOSED ALTERNATIVE DEFENSE-IN-DEPTH AND PRESSURE BOUNDARY COMPONENT CATEGORIZATION PROCESSES (EPID L-2021-LLA-0042)

Dear Mr. Rhoades:

The U.S. Nuclear Regulatory Commission (NRC or the Commission) has issued the enclosed Amendment Nos. 261 and 223 to Renewed Facility Operating License Nos. NPF-39 and NPF-85 for the Limerick Generating Station, Units 1 and 2 (Limerick), respectively, in response to Exelon Generation Company, LLCs (the licensees) application dated March 11, 2021, as supplemented by letters dated May 5, 2021, December 15, 2021, February 14, 2022, and June 30, 2022. On February 1, 2022, Exelon Generation Company, LLC was renamed Constellation Energy Generation, LLC.

On July 31, 2018, the NRC issued Amendment Nos. 230 and 193 to Renewed Facility Operating License Nos. NPF-39 and NPF-85, respectively, which added a new license condition in Appendix C of the operating licenses that allowed the licensee to implement Title 10 of the Code of Federal Regulations (10 CFR), Section 50.69, Risk-informed categorization and treatment of structures, systems and components for nuclear power reactors. Amendment Nos. 261 and 223 to Renewed Facility Operating License Nos. NPF-39 and NPF-85 revise this license condition in each license to allow the use of an alternative seismic approach to categorizing structures, systems, and components in the licensees application of 10 CFR 50.69. The NRC staffs safety evaluation for these amendments is in Enclosure 3 to this letter.

The licensee also requested approval of proposed alternative defense-in-depth and pressure boundary processes for categorizing structures, systems, and components in the licensees application of 10 CFR 50.69. By telephone conference dated December 15, 2022, the NRC staff informed your staff of its plans for the approval of the proposed alternative seismic approach and denial of the proposed alternative defense-in-depth and pressure boundary processes and offered your staff the opportunity for a public meeting to discuss the proposed partial denial of the license amendment request (LAR), prior to the NRC staffs issuance of the partial denial of

the LAR. Your staff requested to have the public meeting, and the NRC staff held the public meeting with your staff on February 23, 2023.

Based upon its review, the NRC staff has concluded that it cannot approve these two proposed processes. Therefore, the LAR is approved in part and denied in part. Accordingly, the NRC staffs notice of denial of the portion of the LAR that has been denied will be published in the Federal Register notice. The basis for this finding is documented in the safety evaluation in to this letter, which explains the nature of any deficiencies and the reason for the denial. Under Title 10 of the Code of Federal Regulations (10 CFR) 2.103(b)(2), within 20 days from the date of the notice of denial, which will be published in the Federal Register, you may demand an adjudicatory hearing with respect to this denial. Under 10 CFR 2.307(a), you may request an extension of this time limit if you can show good cause. Enclosure 5 to this letter has additional instructions for demanding an adjudicatory hearing with respect to this denial.

The NRC staff has included a copy of the notice of issuance of the amendments and of the partial denial of the amendment request in Enclosure 5 to this letter and will forward it to the Office of the Federal Register for publication.

Sincerely, Jamie M. Heisserer, Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353

Enclosures:

1. Amendment to Renewed NPF-39
2. Amendment to Renewed NPF-85
3. Safety Evaluation for the Approved Seismic Approach Amendments
4. Safety Evaluation for Partial Denial
5. Copy of Notice cc: Listserv Jamie M.

Heisserer Digitally signed by Jamie M. Heisserer Date: 2023.05.17 16:41:50 -04'00'

CONSTELLATION ENERGY GNERATION, LLC DOCKET NO. 50-352 LIMERICK GENERATING STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 261 Renewed License No. NPF-39

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC,1 dated March 11, 2021, as supplemented by letters dated May 5, 2021, December 15, 2021, February 14, 2022, and June 30, 2022, complies, to the extent discussed in the NRC staffs safety evaluation dated May 17, 2023, with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

1 The Commission approved a transaction on November 16, 2021, that resulted in Exelon Generation Company, LLC being renamed Constellation Energy Generation, LLC.

2.

Accordingly, Renewed Facility Operating License No. NPF-39 is hereby amended as indicated in the attachment to this license amendment.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 60 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jamie M. Heisserer, Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Renewed Facility Operating License Date of Issuance: May 17, 2023 Jamie M.

Heisserer Digitally signed by Jamie M. Heisserer Date: 2023.05.17 16:42:16 -04'00'

ATTACHMENT TO LICENSE AMENDMENT NO. 261 RENEWED FACILITY OPERATING LICENSE NO. NPF-39 LIMERICK GENERATING STATION, UNIT 1 DOCKET NO. 50-352 Replace the following page of the Renewed Facility Operating License with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.

Remove Page Insert Page Page 5 Page 5 Appendix C, Page 1 Appendix C, Page 1

 

5HQHZHG/LFHQVH1R13)

$PHQGPHQW 1R 



$GGLWLRQDO&RQGLWLRQV 7KH$GGLWLRQDO&RQGLWLRQVFRQWDLQHGLQ$SSHQGL[&DVUHYLVHGWKURXJK

$PHQGPHQW1R*HQHUDWLRQ//&VKDOORSHUDWHWKHIDFLOLW\\LQ DFFRUGDQFHZLWKWKH$GGLWLRQDO&RQGLWLRQV



&RQVWHOODWLRQ(QHUJ\\*HQHUDWLRQ//&VKDOOSURYLGHWRWKH 'LUHFWRURIWKH 2IILFHRI1XFOHDU5HDFWRU5HJXODWLRQRUWKH'LUHFWRURIWKH2IILFHRI 1XFOHDU0DWHULDO6DIHW\\ DQG6DIHJXDUGVDVDSSOLFDEOHD FRS\\RIDQ\\

DSSOLFDWLRQDWWKHWLPHLWLVILOHG WRWUDQVIHU H[FOXGLQJJUDQWVRIVHFXULW\\

LQWHUHVWVRU OLHQV IURP&RQVWHOODWLRQ(QHUJ\\*HQHUDWLRQ//&WRLWVGLUHFW RULQGLUHFWSDUHQWRUWR DQ\\RWKHUDIILOLDWHGFRPSDQ\\IDFLOLWLHVIRUWKH SURGXFWLRQWUDQVPLVVLRQRUGLVWULEXWLRQRIHOHFWULFHQHUJ\\KDYLQJD GHSUHFLDWHGERRNYDOXH H[FHHGLQJWHQSHUFHQW  RI&RQVWHOODWLRQ (QHUJ\\*HQHUDWLRQ//&¶VFRQVROLGDWHGQHWXWLOLW\\SODQWDVUHFRUGHGRQ

&RQVWHOODWLRQ(QHUJ\\*HQHUDWLRQ//&¶VERRNV RIDFFRXQW



'HOHWHG



'HOHWHG



'HOHWHG



APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE NO. NPF-39

&RQVWHOODWLRQ(QHUJ\\*HQHUDWLRQ//&VKDOOFRPSO\\ZLWKWKHIROORZLQJFRQGLWLRQVRQWKH

VFKHGXOHQRWHGEHORZ

$PHQGPHQW1R

$GGLWLRQDO&RQGLWLRQV



&RQVWHOODWLRQ (QHUJ\\ *HQHUDWLRQ//& LV DSSURYHG

WRLPSOHPHQW &)5  XVLQJWKHSURFHVVHVIRU

FDWHJRUL]DWLRQRI 5LVN,QIRUPHG 6DIHW\\ &ODVV

5,6& 5,6& 5,6& DQG 5,6& VWUXFWXUHV

V\\VWHPV DQGFRPSRQHQWV 66&V XVLQJ

3UREDELOLVWLF 5LVN $VVHVVPHQW 35$ PRGHOV WR

HYDOXDWHULVNDVVRFLDWHGZLWKLQWHUQDO HYHQWV

LQFOXGLQJLQWHUQDO IORRGLQJ DQG LQWHUQDO ILUHWKH

VKXWGRZQVDIHW\\ DVVHVVPHQW SURFHVVWRDVVHVV

VKXWGRZQULVN WKH $UNDQVDV 1XFOHDU2QH 8QLW 

$12 SDVVLYHFDWHJRUL]DWLRQPHWKRG WRDVVHVV

SDVVLYHFRPSRQHQW ULVNIRU &ODVV  DQG&ODVV 

66&V DQGWKHLU DVVRFLDWHG VXSSRUWV DQG WKH

UHVXOWV RI QRQ35$ HYDOXDWLRQV WKDWDUH EDVHGRQ

WKH,3((( 6FUHHQLQJ$VVHVVPHQWIRU([WHUQDO

+D]DUGV LHVHLVPLF PDUJLQDQDO\\VLV 60$ WR

HYDOXDWHVHLVPLF ULVN DQG DVFUHHQLQJRI RWKHU

H[WHUQDO KD]DUGV XSGDWHGXVLQJ WKHH[WHUQDO KD]DUG

VFUHHQLQJVLJQLILFDQFH SURFHVV LGHQWLILHG LQ

$60($16 35$ 6WDQGDUG 5$6D DV

VSHFLILHG LQ 8QLW /LFHQVH$PHQGPHQW 1R 

GDWHG-XO\\  

,QDGGLWLRQ &RQVWHOODWLRQ (QHUJ\\ *HQHUDWLRQ //&

&(* LV DSSURYHGWRLPSOHPHQW  &)5 

XVLQJWKHDOWHUQDWLYH VHLVPLF DSSURDFK DV GHVFULEHG

LQWKHOLFHQVHH¶V OHWWHUV GDWHG'HFHPEHU 

DQG)HEUXDU\\  IRU FDWHJRUL]DWLRQRI 5,6&

5,6& 5,6& DQG5,6&66&V DV VSHFLILHG LQ

8QLW  /LFHQVH $PHQGPHQW 1R  GDWHG 0D\\



3ULRU 15& DSSURYDO XQGHU  &)5  LV

UHTXLUHGIRU DFKDQJHWRWKHFDWHJRUL]DWLRQSURFHVV VSHFLILHGDERYH HJ FKDQJHIURPD VHLVPLF

PDUJLQV DSSURDFK WR DVHLVPLF SUREDELOLVWLF ULVN

DVVHVVPHQW DSSURDFK 

 

5HQHZHG/LFHQVH1R13)

$PHQGPHQW 1R  

  

 

   

CONSTELLATION ENERGY GENERATION, LLC DOCKET NO. 50-353 LIMERICK GENERATING STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 223 Renewed License No. NPF-85

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC,1 dated March 11, 2021, as supplemented by letters dated May 5, 2021, December 15, 2021, February 14, 2022, and June 30, 2022, complies, to the extent discussed in the NRC staffs safety evaluation dated May 17, 2023, with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

1 The Commission approved a transaction on November 16, 2021, that resulted in Exelon Generation Company, LLC being renamed Constellation Energy Generation, LLC.

2.

Accordingly, Renewed Facility Operating License No. NPF-85 is hereby amended as indicated in the attachment to this license amendment.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 60 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jamie M. Heisserer, Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Renewed Facility Operating License Date of Issuance: May 17, 2023 Jamie M.

Heisserer Digitally signed by Jamie M. Heisserer Date: 2023.05.17 16:42:46 -04'00'

ATTACHMENT TO LICENSE AMENDMENT NO. 223 RENEWED FACILITY OPERATING LICENSE NO. NPF-85 LIMERICK GENERATING STATION, UNIT 2 DOCKET NO. 50-353 Replace the following page of the Renewed Facility Operating License with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.

Remove Page Insert Page Page 8 Page 8 Appendix C, Page 1 Appendix C, Page 1

 

5HQHZHG/LFHQVH1R13)

$PHQGPHQW1R



7KHOLFHQVHH¶V8)6$5 VXSSOHPHQWVXEPLWWHGSXUVXDQWWR&)5

 G DVUHYLVHGGXULQJWKHOLFHQVHUHQHZDO DSSOLFDWLRQ UHYLHZ SURFHVVDQGDVUHYLVHG LQDFFRUGDQFHZLWKOLFHQVHFRQGLWLRQ &  

GHVFULEHVFHUWDLQSURJUDPVWREHLPSOHPHQWHG DQGDFWLYLWLHV WREH FRPSOHWHGSULRUWRWKHSHULRGRIH[WHQGHGRSHUDWLRQ 3(2 

D

&RQVWHOODWLRQ(QHUJ\\*HQHUDWLRQ//&VKDOOLPSOHPHQWWKRVHQHZ SURJUDPVDQGHQKDQFHPHQWVWRH[LVWLQJSURJUDPVQRODWHUWKDQ

'HFHPEHU

E

&RQVWHOODWLRQ(QHUJ\\ *HQHUDWLRQ//&VKDOOFRPSOHWHWKRVH DFWLYLWLHVGHVLJQDWHGIRU FRPSOHWLRQSULRUWRWKH 3(2DVQRWHGLQ

&RPPLWPHQW1RV 

DQGRI$SSHQGL[$RI 185(*³6DIHW\\

(YDOXDWLRQ5HSRUW5HODWHGWRWKH/LFHQVH5HQHZDORI/LPHULFN

  • HQHUDWLQJ6WDWLRQ8QLWVDQG'QRODWHUWKDQ 'HFHPEHU

RUWKH HQGRIWKHODVWUHIXHOLQJ RXWDJHSULRUWRWKHSHULRGRI H[WHQGHGRSHUDWLRQZKLFKHYHURFFXUVODWHU

F

&RQVWHOODWLRQ(QHUJ\\ *HQHUDWLRQ//&VKDOOQRWLI\\WKH15&LQ ZULWLQJZLWKLQGD\\VDIWHUKDYLQJDFFRPSOLVKHG LWHP D DERYH DQGLQFOXGH WKHVWDWXVRI WKRVHDFWLYLWLHVWKDWKDYHEHHQRUUHPDLQ WREHFRPSOHWHGLQLWHP E DERYH



7KH$GGLWLRQDO&RQGLWLRQVFRQWDLQHGLQ$SSHQGL[&DVUHYLVHGWKURXJK

$PHQGPHQW1RDUHKHUHE\\LQFRUSRUDWHGLQWRWKLVUHQHZHGOLFHQVH

&RQVWHOODWLRQ(QHUJ\\*HQHUDWLRQ//&VKDOORSHUDWHWKHIDFLOLW\\LQ DFFRUGDQFHZLWKWKH$GGLWLRQDO&RQGLWLRQV

'

7KHIDFLOLW\\UHTXLUHVH[HPSWLRQVIURPFHUWDLQUHTXLUHPHQWVRI&)53DUW

DQG&)53DUW7KHVHLQFOXGH D H[HPSWLRQIURPWKHUHTXLUHPHQWRI

$SSHQGL[-WKHWHVWLQJRIFRQWDLQPHQWDLUORFNVDWWLPHVZKHQWKHFRQWDLQPHQW LQWHJULW\\LVQRWUHTXLUHG 6HFWLRQRIWKH6(5DQG66(5  E H[HPSWLRQ IURPWKHUHTXLUHPHQWVRI$SSHQGL[-WKHOHDNUDWHWHVWLQJRIWKH0DLQ6WHDP

,VRODWLRQ9DOYHV 06,9V DWWKHSHDNFDOFXODWHGFRQWDLQPHQWSUHVVXUH3DDQG H[HPSWLRQIURPWKHUHTXLUHPHQWVRI$SSHQGL[-WKDWWKHPHDVXUHG06,9OHDN UDWHVEHLQFOXGHGLQWKHVXPPDWLRQIRUWKHORFDOOHDNUDWHWHVW 6HFWLRQRI 66(5  F H[HPSWLRQIURPWKHUHTXLUHPHQWRI$SSHQGL[-WKHORFDOOHDNUDWH WHVWLQJRIWKH7UDYHUVLQJ,QFRUH3UREH6KHDU9DOYHV 6HFWLRQRIWKH6(5 DQG66(5 DQG G DQH[HPSWLRQIURPWKHVFKHGXOHUHTXLUHPHQWVRI&)5

 N O UHODWHGWRDYDLODELOLW\\RIIXQGVIRUGHFRPPLVVLRQLQJWKHIDFLOLW\\

6HFWLRQ66(5 7KHVSHFLDOFLUFXPVWDQFHVUHJDUGLQJH[HPSWLRQV D 

E DQG F DUHLGHQWLILHGLQ6HFWLRQVRIWKH6(5DQG66(5$Q H[HPSWLRQIURPWKHFULWLFDOLW\\PRQLWRULQJUHTXLUHPHQWVRI&)5ZDV SUHYLRXVO\\JUDQWHGZLWK15&PDWHULDOVOLFHQVH1R610LVVXHG 1RYHPEHU7KHOLFHQVHHLVKHUHE\\H[HPSWHGIURPWKHUHTXLUHPHQWVRI

&)5LQVRIDUDVWKLVUHTXLUHPHQWDSSOLHVWRWKHKDQGOLQJDQGVWRUDJHRI IXHODVVHPEOLHVKHOGXQGHUWKLVUHQHZHGOLFHQVH



APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE NO. NPF-85

&RQVWHOODWLRQ(QHUJ\\*HQHUDWLRQ//& VKDOOFRPSO\\ZLWKWKHIROORZLQJFRQGLWLRQVRQWKH

VFKHGXOHQRWHGEHORZ

$PHQGPHQW 1R

$GGLWLRQDO&RQGLWLRQV



&RQVWHOODWLRQ(QHUJ\\ *HQHUDWLRQ //& LV DSSURYHG

WRLPSOHPHQW &)5 XVLQJWKH SURFHVVHV IRU

FDWHJRUL]DWLRQRI 5LVN,QIRUPHG 6DIHW\\ &ODVV

5,6& 5,6&5,6& DQG 5,6& VWUXFWXUHV

V\\VWHPV DQGFRPSRQHQWV 66&V XVLQJ

3UREDELOLVWLF 5LVN $VVHVVPHQW 35$ PRGHOV WR

HYDOXDWHULVN DVVRFLDWHGZLWKLQWHUQDO HYHQWV

LQFOXGLQJLQWHUQDO IORRGLQJ DQGLQWHUQDO ILUH WKH

VKXWGRZQVDIHW\\ DVVHVVPHQW SURFHVV WRDVVHVV

VKXWGRZQULVN WKH$UNDQVDV 1XFOHDU 2QH 8QLW 

$12 SDVVLYH FDWHJRUL]DWLRQPHWKRGWRDVVHVV

SDVVLYHFRPSRQHQW ULVN IRU &ODVV DQG &ODVV 

66&V DQGWKHLU DVVRFLDWHGVXSSRUWV DQGWKH

UHVXOWV RI QRQ35$ HYDOXDWLRQV WKDW DUHEDVHGRQ

WKH,3((( 6FUHHQLQJ$VVHVVPHQW IRU ([WHUQDO

+D]DUGV LH VHLVPLF PDUJLQDQDO\\VLV 60$ WR HYDOXDWHVHLVPLF ULVN DQG DVFUHHQLQJRI RWKHU H[WHUQDO KD]DUGV XSGDWHGXVLQJWKHH[WHUQDO KD]DUG

VFUHHQLQJVLJQLILFDQFH SURFHVV LGHQWLILHG LQ

$60($16 35$ 6WDQGDUG 5$6D DV

VSHFLILHGLQ8QLW /LFHQVH $PHQGPHQW 1R 

GDWHG-XO\\  

,QDGGLWLRQ &RQVWHOODWLRQ(QHUJ\\ *HQHUDWLRQ //&

&(* LV DSSURYHGWRLPSOHPHQW  &)5 

XVLQJ WKH DOWHUQDWLYH VHLVPLF DSSURDFK DV GHVFULEHG

LQWKH OLFHQVHH¶V OHWWHUV GDWHG'HFHPEHU  

DQG )HEUXDU\\   IRU FDWHJRUL]DWLRQRI 5,6&

5,6&5,6&DQG5,6&66&V DV VSHFLILHGLQ

8QLW /LFHQVH $PHQGPHQW 1R GDWHG 0D\\



3ULRU 15& DSSURYDO XQGHU  &)5  LVUHTXLUHG

IRU DFKDQJHWRWKHFDWHJRUL]DWLRQSURFHVV VSHFLILHG

DERYH HJ FKDQJHIURPD VHLVPLF PDUJLQV

DSSURDFK WR D VHLVPLF SUREDELOLVWLF ULVN DVVHVVPHQW

DSSURDFK 

 

5HQHZHG /LFHQVH 1R

13)$PHQGPHQW 1R 

 





Package: ML23090A163 Cover letter and Amendment Pages: ML23089A124 SE for Amendments: ML23094A171 SE for Denial: ML23094A179 FRN: ML23094A198 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DEX/EEEB/BC NAME AKlett KZeleznock WMorton DATE 05/15/2023 04/18/2023 04/20/2023 OFFICE NRR/DEX/EICB/BC NRR/DEX/EMIB/BC NRR/DSS/SNSB/BC (A)

NAME MWaters SBailey DWoodyatt DATE 04/21/2023 04/19/2023 04/20/2023 OFFICE NRR/DRA/APLA/BC NRR/DRA/APLC/BC NRR/DNRL/NPHP/BC NAME BPascarelli SVasavada MMitchell DATE 04/14/2023 04/20/2023 04/14/2023 OFFICE OGC (NLO)

NRR/DORL/LPL1/BC NRR/DRA/DD NAME MWoods HGonzalez MKhanna DATE 05/12/2023 05/09/2023 05/12/2023 OFFICE NRR/DNRL/DD NRR/DORL/DD NAME BThomson JHeisserer DATE 05/12/2023 05/17/2023