Letter Sequence Other |
|---|
|
Results
Other: L-PI-03-016, Response to Opportunity for Comment on Task Interface Agreement (TIA) 2001-10, Design Basis Assumptions for Ability of Prairie Island, Unit 2, Emergency Diesel Generators to Meet Single-Failure Criteria for External Events, ML013480323, ML020020074, ML020020108, ML020030002, ML020410002, ML020570514, ML021060641, ML021070317, ML021140405, ML021140426, ML021610096, ML021990405, ML022140006, ML022600292, ML023290377, ML023640310, ML031010026, ML032040412, ML050900176, ML051030051
|
MONTHYEARML0134803232002-01-0404 January 2002 Task Interface Agreement 2000-18, Design-Basis Assumptions for Non-Seismic Piping Failures at the Perry Plant Project stage: Other ML0200201082002-01-16016 January 2002 Opportunity for Comment on TIA 2001-04, Design-Basis Reliance on Non-Seismic and Non-Safety Related Equipment Project stage: Other ML0200300022002-01-16016 January 2002 Opportunity for Comment on TIA 2001-10, Design Basis Assumptions for Ability of Prairie Island, Units 2, Emergency Diesel Generators to Meet Single Failure Criteria for External Events Project stage: Other ML0200200742002-01-18018 January 2002 Opportunity for Comment on TIA 2001-02, Design Basis Assumptions for Non-Seismic Piping Failure Project stage: Other ML0204100022002-02-11011 February 2002 Report on the Status of Open TIAs Assigned to NRR Project stage: Other ML0208702382002-03-13013 March 2002 Response to Request for Additional Information (RAI) Regarding Technical Specification (TS) Change 01-10, One-Time Frequency Extension for Type a Test (Containment Integrated Leak Rate Test (Cilrt)) Project stage: Response to RAI ML0208003112002-03-18018 March 2002 Day Response to Order for Interim Safeguards Security Compensatory Measures Project stage: Request ML0210100662002-04-0909 April 2002 TSC 01-10 - TVA Response to RAI Project stage: Request ML0211404052002-04-11011 April 2002 Additional Information for Technical Specification (TS) Change 01-10, One-Time Frequency Extension for Type a Test (Containment Integrated Leak Rate Test (Cilrt)) Project stage: Other ML0210703172002-04-17017 April 2002 Memo to Raghavan from Manoly, Response to Task Interface Agreement (TIA 2001-15) for D. C. Cook, Units 1 and 2 Project stage: Other ML0210606412002-05-0101 May 2002 Task Interface Agreement (TIA) 2001-07 from Region III Regarding Quad Cities Maintenance Rule (MR) Issues Project stage: Other ML0205705142002-05-0606 May 2002 Response to Task Interface Agreement - TIA 2001-12, Licensing Bases for the Standby Liquid Control System Project stage: Other ML0212904652002-05-10010 May 2002 Meeting with Nuclear Management Company, LLC to Discuss the Aspects of Security Orders Project stage: Request ML0215504192002-05-10010 May 2002 Response to Draft NRR Position on TIA 2001-04, Design Basis Reliance on Non-Seismic and Non-Safety Related Equipment Project stage: Draft Other ML0215504132002-05-10010 May 2002 Response to Draft NRR Position on TIA 2001-02, Design Basis Assumptions for Non-Seismic Piping Failure Project stage: Draft Other ML0211404262002-05-24024 May 2002 Memo Re Response to Task Interface Agreement 2001-009 Regarding Potential Unisolable Reactor Coolant Leak Outside Containment Project stage: Other ML0509001762002-05-28028 May 2002 Fire Hazard Analysis for Fire Zone 98-J, Emergency Diesel Generator Corridor and Fire Zone 99-M, North Electrical Switchgear Room, Arkansas Nuclear One, Unit 1 Project stage: Other ML0214800332002-05-31031 May 2002 DC Cook, Units 1 & 2 - Request for Additional Information Regarding Containment Structure Conformance to Design-Basis Requirements Project stage: RAI ML0216100962002-06-11011 June 2002 Information Sent & Received by Electronic Mail Concerning Heavy Loads Request for Additional Infomration Project stage: Other 05000237/LER-2002-003, Manual Valve Failures Prevent the Cooling Water Flow to Control Room Refrigeration Condensing Unit2002-07-0808 July 2002 Manual Valve Failures Prevent the Cooling Water Flow to Control Room Refrigeration Condensing Unit Project stage: Request ML0220301902002-07-16016 July 2002 Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements Project stage: Response to RAI ML0220303702002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Pages A30.1 - A56.4 Project stage: Response to RAI ML0220304002002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Pages A57.1 - A80.10 Project stage: Response to RAI ML0220304152002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Engineering Report SE 99-5, Attachment 6 to AEP:NRC:2520, Pages 1 - B29.6 Project stage: Response to RAI ML0220304172002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Pages A81.1 - 1.2 Project stage: Response to RAI ML0220304462002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Pages B30.1 - B67.6 Project stage: Response to RAI ML0220304482002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Attachment 6, Pages B68.1 - Attachment 7 Project stage: Response to RAI ML0220303342002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Attachment 5, Solvia Engineering Report SE 99-4 Project stage: Response to RAI ML0219904052002-07-18018 July 2002 Supplemental Fire Modeling for Fire Zone 98-J, Emergency Diesel Generator Corridor & Fire Zone 99-M, North Electrical Switchgear Room, Arkansas Nuclear One, Unit 1 Project stage: Other ML0224100432002-08-23023 August 2002 Supplement to Nuclear Regulatory Commission Request for Additional Information Regarding Containment Structure Conformance to Design Basis Requirements Project stage: Supplement ML0223805242002-08-23023 August 2002 License Amendment Request for One-Time Extension of Essential Service Water System Allowed Outage Time-Additional Information Project stage: Request ML0221400062002-08-29029 August 2002 Response to Task Interface Agreement (TIA 2001-02) &Tia 2001-04 Evaluation of Service Water System Design Basis Requirements Project stage: Other ML0224201372002-09-11011 September 2002 Cover Letter - Draft Response to Task Interface Agreement 2001-13 Concerning the Reactor Building Crane and Heavy Loads Project stage: Draft Other ML0226002922002-09-17017 September 2002 Memorandum Regarding Report on the Status of Open TIAs Assigned to NRR Project stage: Other ML0231000392002-11-11011 November 2002 Examples of Risk-Informed Licensing Actions for Acrs/Acnw Project stage: Request ML0236403102002-12-30030 December 2002 Opportunity for Comment on Task Interface Agreement (TIA) 2001-10, Design-Basis Assumptions for Ability of Prairie Island, Unit 2, Emergency Diesel Generators to Meet Single-Failure Criteria for External Events Project stage: Other ML0510300512003-01-13013 January 2003 Response to Task Interface Agreement (TIA 2001 -15) Regarding Evaluation of Containment Structure Conformance to Design-basis Requirements Project stage: Other ML0232903772003-01-13013 January 2003 Task Interface Agreement (TIA 2001-15) Evaluation of Containment Structure Conformance to Design-Basis Requirement Project stage: Other ML0224200972003-02-21021 February 2003 Draft - NRR Response to TIA 2001-13, Backfitting Requirements for Dresden Units 2 & 3 Reactor Building Crane Project stage: Draft Other ML0310100262003-02-21021 February 2003 NRC Response to TIA 2001-13, Backfitting Requirements for Dresden Units 2 & 3 Reactor Building Crane Project stage: Other L-PI-03-016, Response to Opportunity for Comment on Task Interface Agreement (TIA) 2001-10, Design Basis Assumptions for Ability of Prairie Island, Unit 2, Emergency Diesel Generators to Meet Single-Failure Criteria for External Events2003-04-21021 April 2003 Response to Opportunity for Comment on Task Interface Agreement (TIA) 2001-10, Design Basis Assumptions for Ability of Prairie Island, Unit 2, Emergency Diesel Generators to Meet Single-Failure Criteria for External Events Project stage: Other ML0320404122003-09-0404 September 2003 Response to TIA 2001-10, Design Basis Assumptions for Ability of Emergency Diesel Generators to Meet Single Failure Criteria for External Events Project stage: Other ML0411204872004-04-13013 April 2004 License Amendment Request to Use Yield Strength Determined from Measured Material Properties for Reinforcing Bar in Structural Calculations for Control Rod Drive Missile Shields Project stage: Request 2002-05-28
[Table View] |
Text
January 18, 2002 Mr. Mano Nazar Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -
OPPORTUNITY FOR COMMENT ON TIA 2001-02, DESIGN BASIS ASSUMPTIONS FOR NON-SEISMIC PIPING FAILURE (TAC NOS. MB1402 AND MB1403)
Dear Mr. Nazar:
The Nuclear Regulatory Commission (NRC) staff has completed its review of the subject Task Interface Agreement (TIA) request, dated March 27, 2001, from the NRCs Region III office. This TIA requested the Office of Nuclear Reactor Regulation (NRR) staffs assistance in resolving issues related to design-basis assumptions for the service water system operations at the Prairie Island Nuclear Generating Plant. The purpose of this letter is to provide you with the opportunity to respond to the NRR staffs preliminary conclusions made in the enclosed draft TIA response. In developing the enclosed TIA response, the NRR staff considered your letter dated September 17, 2001, as well as other relevant licensing basis documents.
Our internal procedures encourage the input of licensees or other external stakeholders in order to ensure all relevant information has been considered in responding to a TIA. While you are not required to respond to this letter, your staff has previously indicated a desire to review and comment on the staffs draft TIA response.
If you decide to respond to this letter, we request that your response be provided within 60 days of receipt of this letter. Please feel free to contact me at (301) 415-1392 if you have any questions.
Sincerely,
/RA/
Tae Kim, Senior Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306
Enclosure:
Response to TIA 2001-02 cc w/encl: See next page
ML020020074
May 2001 Prairie Island Nuclear Generating Plant, Units 1 and 2 cc:
J. E. Silberg, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, N. W.
Washington, DC 20037 Site Licensing Manager Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089 Adonis A. Neblett Assistant Attorney General Office of the Attorney General 455 Minnesota Street Suite 900 St. Paul, MN 55101-2127 U.S. Nuclear Regulatory Commission Resident Inspector's Office 1719 Wakonade Drive East Welch, MN 55089-9642 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Mr. Stephen Bloom, Administrator Goodhue County Courthouse Box 408 Red Wing, MN 55066-0408 Commissioner Minnesota Department of Commerce 121 Seventh Place East Suite 200 St. Paul, MN 55101-2145 Tribal Council Prairie Island Indian Community ATTN: Environmental Department 5636 Sturgeon Lake Road Welch, MN 55089 Mr. Roy A. Anderson Executive Vice President and Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Nuclear Asset Manager Xcel Energy, Inc.
414 Nicollet Mall Minneapolis, MN 55401
OFFICE OF NUCLEAR REACTOR REGULATION STAFFS RESPONSE TO TASK INTERFACE AGREEMENT (TIA) 2001-02 "PIPE FAILURE CRITERIA FOR THE COOLING WATER SYSTEM AT THE PRAIRIE ISLAND NUCLEAR GENERATING STATION"
1.0 BACKGROUND
By memorandum dated March 27, 2001, Region III requested the Office of Nuclear Reactor Regulation (NRR) staffs assistance to resolve an inspection-related finding concerning design assumptions for seismic qualification of nonsafety-related piping at the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2. The following two issues were identified in TIA 2001-02:
Issue (1)
From a design basis perspective for system functional capability, can non-seismically analyzed piping be assumed to only leak as specified in BTP MEB 3-1, or should non-seismic piping be assumed to fail completely?
Issue (2)
From a design basis perspective for system functional capability, can piping designed for a Uniform Building Code (UBC) Zone 1 earthquake loading of 0.05g be considered seismically qualified piping?
2.0 NRR STAFFS RESPONSE TO ISSUE (1)
The current NRC review criteria for piping breaks is specified in the Standard Review Plan (SRP), Sections 3.6.1 and 3.6.2, and in Regulatory Guide (RG) 1.29. However, the licensing application for the Prairie Island units was reviewed by the NRC before the SRP and RG 1.29 criteria were implemented. Therefore, these criteria (including Backfit Test Program (BTP)
MEB 3-1) do not apply to PINGP. As a point of clarification, BTP MEB 3-1 provides guidance for postulating pipe failures (breaks and cracks) that occur as initiating events during normal plant operation, and this guidance does not apply to the situation where pipe failures are postulated as a consequence of a seismic event.
The design basis of the PINGP units with respect to earthquake protection is discussed in the Final Safety Analysis Report (FSAR) that was in effect at the time of licensing of the plant.
FSAR Appendix B, Special Design Procedures, Section B.7.2(a), Design Criteria for Class I Vessels, Piping, and Supports, states that critical components must not lose the capability to perform their safety function during a design-basis earthquake (DBE). This capability is ensured by limiting the stresses that are induced in Class I piping by the DBE so that they are not sufficient to cause a pipe rupture. Non-Class I piping does not satisfy this criteria and therefore, pipe ruptures of non-Class I piping is not precluded during a DBE. Consequently, critical components must be able to perform their safety function assuming the complete rupture of non-Class I piping during a DBE. This is consistent with the seismic design criteria that is stated in RG 1.29, which is a reflection of the staffs review practices that were being used during the time when the PINGP units were licensed.
ENCLOSURE 3.0 NRR STAFFS RESPONSE TO ISSUE (2)
Structures, systems, and components of a nuclear power plant that are important to safety are required to withstand the effects of earthquakes without a loss of the capability to perform their safety functions. The earthquake for which these plant features are designed is defined as a safe-shutdown earthquake (SSE) and described in the licensing basis documentation for the plant. Those plant features that are designed to remain functional if an SSE occurs are considered to be seismically functional.
The seismic design load at PINGP is 0.12g for an SSE. Therefore, the use of 0.05g in the licensees analysis for the subject piping system to demonstrate its seismic qualification is not acceptable. The licensee should use its licensing-basis SSE of 0.12g in a suitable dynamic analysis for the purpose of demonstrating its seismic adequacy.
With respect to the use of a UBC analysis, the staff does not consider this analysis as a rigorous dynamic analysis to demonstrate the seismic qualification of a piping system.
However, a UBC analysis would be acceptable if: (1) the SSE of 0.12g is used in the analysis and (2) an acceptable analytical approach or method is employed such that the results of the analysis are comparable to those obtained by the use of methods described in the licensees FSAR for the Category 1 piping system.
Based on the above discussions, the NRR staff concludes that a piping system designed based on the UBC Zone 1 earthquake loading of 0.05g can not be considered as seismically qualified. The NRR staff considers that any analysis performed to establish the seismic qualification of the piping system must utilize the licensing-basis SSE of 0.12g, and meet the acceptance criteria set forth in the FSAR for PINGP.