LR-N22-0019, Technical Specification 6.9.1.5.b 2021 Annual Report of SRV Challenges

From kanterella
Jump to navigation Jump to search
Technical Specification 6.9.1.5.b 2021 Annual Report of SRV Challenges
ML22056A215
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 02/24/2022
From: Poorman S
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N22-0019
Download: ML22056A215 (2)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236

@PSEG NuclearLLC LR-N22-0019 February 24, 2022 Technical Specification 6.9.1.5.b U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555-001 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 Docket No. 50-354

Subject:

Technical Specification 6.9.1.5.b 2021 Annual Report of SRV Challenges This report is submitted in accordance with Hope Creek Technical Specification 6.9.1.5.b, which requires documentation of all challenges to main steam line safety/relief valves (SRVs) on an annual basis.

For 2021, the SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically.

There are no regulatory commitments contained in this letter.

If you have any questions or require additional information, please contact Ms. Bernadette Humphrey at 856-339-1308.

Sincere

\m \

Llu/'\...

Steven R. Poorman Plant Manager Hope Creek Generating Station

LR-N22-0019 Technical Specification 6.9.1.5.b Page 2 cc: Regional Administrator - USNRC Region I USNRC Project Manager - Hope Creek USNRC Senior Resident Inspector - Hope Creek (X-24)

Manager IV, NJ Bureau of Nuclear Engineering Corporate Commitment Coordinator