Fourth Quarter PSEG Metrics for Improving Work Environment - 01/31/05
ML050330576
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 01/31/2005
From: Levis W
Public Service Enterprise Group
To: Collins S
NRC Region 1
References
LR-N05-0045
Download: ML050330576 (35)


Text

William Levis PSEG Nuclear LLC Senior Vice President and CNO EO.Box 236, Hancocks Bridge, NJ 08038 tel: 856.339.1100 fax:856.339.1104 January 31,2005 LR-N05-0045 Mr. Samuel Collins, Regional Administrator United States Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 PSEG METRICS FOR IMPROVING THE WORK ENVIRONMENT SALEM AND HOPE CREEK GENERATING STATIONS QUARTERLY REPORT DOCKET NOS. 50-272, 50-311 AND 50-354

Dear Mr. Collins:

Reference:

1) PSEG Letter Dated October 29, 2004; PSEG Metrics for Improving the Work Environment, Salem and Hope Creek Generating Stations, Quarterly Report
2) PSEG Letter Dated January 14, 2005, PSEG Metrics for Improving The Work Environment Salem and Hope Creek .

Generating Stations, Quarterly Metrics Report - Error Notification This letter provides a copy of the published PSEG Nuclear quarterly metrics for the fourth quarter 2004. These metrics, previously identified to the NRC, were put in place to objectively measure the effectiveness of the Safety Conscious Work Environment (SCWE) improvements at Salem and Hope Creek Generating Stations.

Also included with each metric is an analysis that describes progress to date on the particular metric.

Since our October 29, 2004 submittal (Ref. I ) , the following changedcorrections have been made:

I.The goal for Safety System Unavailability metrics has been changed from Industry Median Performance to Industry Top Quartile Performance. This is a more challenging goal than that presented in October 2004 and aligns directly with our internal goals for those systems.

Mr. Samuel Collins January 31 , 2005 LR-N05-0045

2. Accounting errors were identified in the Executive Review Board (ERB)

Action Approvals and Salem and Hope Creek Operational Challenges metrics (Ref. 2). The accounting errors did not affect our overall assessment of any of these metrics. These errors have been captured in our Corrective Action Program.

As the new Chief Nuclear Officer of PSEG Nuclear, 1 plan on further evaluating the overall effort to measure and improve the SCWE at Salem and Hope Creek.

I look forward to discussing the SCWE metrics, as well as the results of our upcoming employee survey, in our next public meeting.

On January 17, Exelon began providing operating services for Salem and Hope Creek. More than 20 employees from Exelon are now in various management positions, including Site Vice Presidents at Salem and Hope Creek. To introduce ourselves to the workforce, we had several all hands meetings with the employees at Salem and Hope Creek. Although not an official metric, I was pleased with the candor and response of the workforce. Most employees were receptive to the Exelon presence and very willing to raise their issues.

Prior to January 17, a number of personnel decisions were made that were related to implementation of the Operating Services Contract. The Executive Review Board (ERB) did not review those decisions. In order to ensure that those actions complied with 10 CFR 50.7, we are commissioning an independent review. In addition, the matter has been captured in our Corrective Action Program. Going forward, we will continue to use the ERB until and unless that process is changed in an appropriate manner.

If you have any further questions, please contact Christina Perino, Regulatory Assurance Director, at 856-339-1989.

Very truly ours, LYKLki William Levis Senior VP and CNO PSEG Nuclear, LLC Attachments 95-4933

Mr. Samuel Collins January 31, 2005 LR-N05-0045 C U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Mr. D. Collins, Project Manager Salem & Hope Creek U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08C2 11555 Rockville Pike Rockville, MD 20852 USNRC Senior Resident Inspector - HC (X24)

USNRC Senior Resident Inspector - Salem (X24)

Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering PO Box 415 Trenton, NJ 08625 95-4933

Salem and Hope Creek Generating Stations creek

Metrics will be published following the first quarter 2005 Employee Survey for:

  • KNOWLEDGE OF ALTERNATIVE AVENUES
  • EMPLOYEE PERCEPTION OF MANAGEMENT COMMITMENT
  • SUPERVISOR COMMUNICATION EFFECTIVENESS
  • TRUST AND RESPECT BETWEEN MANAGEMENT &SITE PERSONNEL I GENFRAJING STATIONS

SCWE MANAGEMENT TRAINING ATTENDANCE Updated. Monthly Management ISdefined Chart Owner 43 associates remaining tobetrained Nuclear Training Manager Goal:

bv vear end This metric measures the training to enhance management's understanding of key Safety Conscious Work Enwronment (SCWE) policy attributes and our collectwe roles and responsibilities for proper New Indicator for 2004 196 200 U

.-e 175 I-z s m 150

.m.

I 0

-x m

0 2

125 -Attended I

Lu c

m 100

+Goal Em 75 m

50

- -Remaining I-m 0

to Attend

-Expected to Enroll Sept20 Sept27 Septa Oct 12 Oct 18 Oct 19 Oct25 Novl Nov8 Novl2 Nov29 Dec6 Dec 13 wI G E N i R A T l N G STATIONS

EXECUTIVE REVIEW BOARD (ERB) ACTION proposed personnel acbons to ensure no Updated Monthly retaliabon or chilling effect irnplicabons APPROVALS Chart Owner 3420134 402004 Safety Conscious Work Environment Manager Goal: No Adverse Trend New Indicator for 2004 No adverse trend in ERB action was present in the 4th quarter.

Forty-eight cases [cases can involve more than one person] were reviewed by ERE in the 4th quarter.

Of those, 42 cases (88%) were concurred with by ERB. The remaining 6 cases were rejected by ERE due to process inconsistencies (e.g.. not following HR processes, inconsistent with past practice). No rejected cases involved instances of potential violation of 10 CFR 50.7.

I 30 I 19 16 16

=Total Cases m

Lo m

0 m

(1 :

w 0 Approved Cases Jan Feb Mar APr May Jun Jul Aw SeP Oct Nov Dec w ) GENFRATINGS T A T I O N S

S CONFIDENTIALITY / ANONYMITY Updated: Monthly c 33 0" __ ______ __

a 30-w 0

'i; 20 _____ 46--

8 II f lo-- -. - ~- -_

z 0

2003 Two of the eight concerns were anonymous There are no adverse trends o Confidentiality/Anonymously mTotal Number of Concerns The increased number of concerns brought to Employee Concerns in 2004 may be attributed to management's encouragement to raise issues with ECP Actions Continue working w t h management to resolve issues at the lowest level ECP continues to encourage people to raise issues and monitor the results Monthly Total Confidentiality/

Anonymously Monthly Total Number of Concerns Jan Feb Mar Apr May Jun Jul AW Sep Oct Nov Dec h \

Sa/em$ij$&e (J' I GENERATING creek STATIONS

Total Notifications Monthly Average Tolal Notifications

-1 2 2 2 h) hl fa h) "W ul 21 "0 kl "m ;r "g 'E;1 -E "w 0 o u l o u l o u l V I 0 0 0 0 0 0 0 0 0 0 0 0

]The number of open online corrective ONLINE CORRECTIVE MAINTENANCE maintenance work tems.

Updated: Monthly BACKLOG Chart Owner 34- 442004 Salem Maintenance Manager and Hope Creek Maintenance Manager - Goal: 215 by year end History 1 1This metric measures our total backlog of on-line correcbw maintenance These are items that have an impact on plant operations and can be fixed while the unit is in service. Benchmarking indicates the industry median at 90, with top performance at 45 for our site. Our goal is to achieve top performance by the end of 2005.

Historical Data Not Available Hope Creek: Goal was 115; actual was 107. Metthe goal.

Salem: Goal was 100; actual ws 91. Met the goal.

-SI Actual oS2 Actual HC Actual

+Goal w 1 GENERATING STATIONS

maintenance work rtems ONLINE ELECTIVE MAINTENANCE BACKLOG Updated: Monthly Chart Owner 302004 492004 Salem Maintenance Manager and Hope Creek Maintenance Manager I Goal: 1,900 by year end History I Intent of Metric This metric measures ourtotal backlog of on-line elective maintenance. These are items that do NOT have an impact on plant operations and can be fixed while the unit is in service. Benchmarking indicates the industry median at 1450, wth top performance at 1200 for our site. Our goal is to achieve top performance by the end of 2005.

Historical Data Not Available Hope Creek: Hope Creek actual was 966, which did not meet the goal of 700. This was due t o refueling outage extending into 2005, which did not allow for post maintenance testing and closure of the on-line elective maintenance activities due to plant conditions. On-line work was added to the outage to improve plant reliability.

Salem: Goal was 1,200; actual was 1 ,171. Met the goal.

2,750 I 1 m 2,500 2,250 2,000 1.750 c

1,500 0"

m L

1,250 c

1,000 750 500 250 0

We- creek

) G E N ~ A T I N GSTATIONS

CORRECTIVE ACTION PROBLEM RESOLUTION petfomance indicator is a monthly value.

Chart Owner 342004 4~2004 Corrective Action Program Manager I Goal: 95%

Site personnel M i t e a notification in our Corrective Action Program (CAP) to identlfy an issue that needs attention. This metric tracks the quality of the corrective actions that resulted wth a goal of greater than or equal to 95% Closure Board acceptance rate, meaning the correct actions resulted from the notification. Items that are not accepted by the Board are not closed until the issue is reworked and the Board approves.

New Indicator for 2004 The goal was met 80%

t 650 550 v

70% --- a, 60% -- 450 ,$ nGoal Reporting / &

50% -- data enhy 350 E starts in a, mActual 40% -- March 250 11 5

30% ---- z 150 -+-Number 20% --. . .. Reviewed 50 10%

0% I -50 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec GENl?RATlNG S T A T I O N S

.GI

  • Definition Percentage of Nuclear Condition Report acth/ies overdue on a NUCLEAR CONDITION REPORT ACTIVITIES OVERDUE Updated: Monthly monthly basis, measured as activities with an actual finish date occurring afterthe due date.

Chart Owner Corrective Action Program Manager Goal: 5%

I ,

History lsite personnel write a notificatio n our Correctwe Action Program (CAP) to identlfy an issue-that needs attention. This metric tracks the timeliness of our review and corrective actions by measuring the percentage overdue, with a goal of less than or equal to 5%.

New Indicator for 2004 The number of nuclear condition report activities overdue has not improved. This was because we chose to concentrate on CAP quality first, which has improved. and we will now begin focusing on CAP timeliness as part of a methodical process improvement strategy.

I Monthly Overdue

+Goal Jan Feb Mar APr May Jun Jul Aug S w OCt Nov Dec h \

w J GENERATINGSTATIONS

Updated Monthly EVALUATION Corrective Action Program Manager

.I*,. .* *,

I Goal: No Adverse Trend History Intent of Metric Site personnel write a notification in our Corrective Action Program (CAP)to identfy an issue that needs attention. This metric looks at the timeliness of our r&ew and corrective actions by tracking the number that have a due date extension, which is allowed by our process. By tracking those that are edended, we expect to see an improvement trend in overall timeliness.

~ _ _ _ ~ -~

New Indicatorfor 2004 trend for this indicator has not improved due to an increased number of extensions increased managemenl as planned In additron, quarter 2005 to include 140 - --

120 -_____I _____ -

100 Reporttngldata entry starts in May 1 Monthly Total 1 40 -

20 -__

0 Jan Feb Mar Apr May Jun Jui Aug SeP Oct Nov Dec w ) GEN;RATING STATIONS

o n safety-related equipment SALEM UNIT 1 REPEAT MAINTENANCE ISSUES Updated Monthly Chart Owner 342004 4Q2004 Salem Maintenance Manager 1 Goal: No Adverse Trend This metric monitors the number of issues that were not fbted correctlythe first time on safety-related equipment. We track items that have been fixed and need to be reworked within twelve months. This is a new metric to ensure we see a reduction as our corrective action program improves.

control room recorders for serfice water and primary systems. Engineering has initiated two common cause analyses, due New Indicatorfor 2004 in February 2005. for valves and main control room recorders. These analyses will look for common causes in relation to both systems and components. There was a trend noted in December with 55 repeat items making the indicator 'Red."

Over half of these were due to minor packing leaks on manual vahres. These will be a patt of the common cause analyses

  • - Based on feedback from our corrective action process, our understanding of how we apply the definition of repeat maintenance has evolved. This learning was applied to the data collected in the 4th quarter. Over the next quarter. the 2004 third quarter data will be reevaluatedto determine if any changes in the data or analysis and actions are warranted.

55 50

$ 45 m

- 40 2

&- 35 c

-g 30 2 25 Monthly CI Actual 8 20 n

$ 15 10 5

0 Jan Feb Mar APr May Jun Jul Aug SeP Oct Nov Dec sa/- w Creek

) G E N E R A T I N G STATIONS

identrfiedon safety-related equipment SALEM UNIT 2 REPEAT MAINTENANCE ISSUES Updated Monthly

~ ~~

Salem Maintenance Manager 1 Goal: No Adverse Trend This metric monitors the number of issues that were not fixed correctiy the first time on safety-related equipment. We track items that have been fixed and need to be reworked within Mlve months. This is a new metric to ensure we see a reduction as our corrective action program improves.

service waier and primary systems. Engineering has initiated t w o common cause analyses, due in February 2005. for New Indicator for 2004 valves and Main Control Room Recorders. These analyses will look for common causes in relation to both systems and components. There was a trend noted in Decemberwith 34 repeat items making the indicator 'Red." Over half ofthese were due to minor packing leaks on manual valves. These will be a part of the common cause analyses

  • - Based on feedback from our corrective action process, our understanding of how we apply the defmition of repeat maintenance has evolved. This learning was applied to the data collected in the 4th quatter. Over the next quarter, the 2004 third quarter data will be reevaluatedto determine if any changes in the data or analysis and actions are warranted.

60 55 - ____ . ... .. .. ....... __ . . . . .

-D v1

""i-45 40 35

__ .......... ___...~..

.~

-1

.$30 ....... ~ .......... ...__ ..

Monthly

-2 25 .......

Actual

' 20 15 10 5

0 Jan Feb Mar Apr May Jun Jul Aug S9P OCt Nov Dec

-/as I/ ) GEN!RATING Creek STATIONS

lThe number of repeat maintenance issues identified HOPE CREEK REPEAT MAINTENANCE ISSUES I Updated: Monthly Chart Owner Hope Creek Maintenance Manager Goal: No Adverse Trend n

Intent of Metric f issues that were not fixed correctlv the hrst time on safetv-related equipment. We track items that have been fixed and need to be reworked within twelve months. This is a new metric to ensure we see a reduction as our corrective action program improves.

Review of the data for the past quarter indicates an adverse trend. Analysis of the specific component challenges reported as repeat maintenance indicates that pumps, heat exchangers, generators, vabe New Indicator for 2004 operators, signal conditioners, switches. and panels are the largest contributors. A common cause analysis, due March 2005, has been initiated to determine targeted actions necessatyto improve reliability and reduce repeat maintenance on these components.

  • - Based on feedback from our corrective action process, our understanding of how we apply the definition of repeat maintenance has evolved. This learning was applied to the data collected in the 4th quarter. Over the nexl quarter, the 2004 third quartets data will be re-evaluatedto determine if any changes in the data or analysis and actions are warranted.

40 . .. ~ _ _ _ ~ ~ ~ . . ... .. ____ ~.~. .. . . .

35 30 25 Reporting I data entry starts in July __...... .. ___ ... . . Monthly Actual 20 15 10 .__ ._ _ ..__

5 0

Jan Feb Mar APr May Jun JUl Aug SeP Ob Nov Dec

(/ ) G E N E R A T I N G STATIONS

The number of plant operabonal issues that warrant implementanonof the Operabonal SALEM UNIT I OPERATIONAL CHALLENGES Updated Monthly Challenges Response Team Chart Owner 3Q2004 4Q2004 Salem Plant Manager Goal: No Adverse Trend We established a procedureto allow our operating crews to request additional assistance to address emergent issues. These are called "Operational Challenges.' This metric measures the number of times each month our operators engage this assistance. Our goal IS to minimize the challenges to our operabng crews. By tracking and reviewingthe challenges, we can investigatecommon causes and potentialtrends New Indicator for 2004 were associated with human performance and four were associated with equipment reliability. A common cause assessment of the equipment reliabilitywill be performed to identify any common elements or changes required in our system health plans.

An oil spill that occurred in December was an external event common to all units. Consistentwith our site reporting practices, that event is captured under the Salem Unit 2 indicator.

10 9

8 7

8 Monthly 5 Total 4

Reporting/ data entry __- __-. ___- .~

3 starts in Apnl 2

1 0

0 Jan Feb Mar Apr May Jun Jul AW SeP Oct Nov Dec h \

w ) G E N i R A T l N G STATIONS

The number of plant operational issues mat SALEM UNIT 2 OPERATIONAL CHALLENGES warrant implementationof the Operational Updated: Monthly Challenges ResponseTeam.

(Includes Unit 2, Unit 3, and Common)

Chart Owner 3Q2004 492004 Salem Plant Manager I Goal: No Adverse Trend emergent issues 'These are called 'Operatmnal Ehallenges " h i s metric measures the number of bmes each month our operators engage this assistance Our goal is to minimize the challenges to our operating crews Bytrackmg and rewewing the challenges,we can investigate common causes and potential trends There were six OCRs initiated for Unit 2 during the last quarter of 2004. One was associated with New Indicatorfor 2004 human performance, three with equipment reliability.and two as a result of external events (oil spill).

A common cause assessment of the equipment reliabilitywill be performed to identify any common elements or changes required in our system health plans.

An oil spill that occurred in December was an external event common to all units. Consistentwith our site reporting practices. that event is captured under Me Salem Unit 2 indicator.

Monthly

.-c Total f

0" Jan Feb Mar APr May Jun Jul Aug SeP Oct Nov Dec h \

w I G E N F R A T I N G STATIONS

HOPE CREEK OPERATIONAL CHALLENGES Updated Monthly Chart Owner 302004 4Q2004 1 Hope Creek Plant Manager I Goal: No Adverse Trend We established a procedureto allow our operating crews to request additional assistance to address emergent issues. These are called "OperationalChallenges." This metric measures the number of times each month our operators engage this assistance. Our goal is t o minimize the challenges to our operating crews By tracking and reviewingthe challenges.we can investigate common causes and potentialtrends New Indicator for 2004 Ten operational challenges were experienced in 2004, four occurring in Ute 4th quarter. Formal OCRs were implemented for a Notification of Unusual Event because of a freon leak in the Security Center. a manual scram from a steam leak due to a failed 8" drain line on a moisture separator, trip of 4kV vital bus during transfer from alternate to normal feeds, and a fire in the HC substation that resulted in loss of various station loads. Overall performance remains high forthe period. Corrective maintenance and modifications are addressing equipment deficiencies.

I 10 8 .

i

................... ~ .... ........ ........ ......... .... .. .... . .. ..

rn Monthty 51 Total 4 4 ~ _. ....... ___ . ... ___ . -....-....-_I ..

Reporting1 data entry ............. ___ .. ___-_ .............. ____

starts in April 2 _____~ .......... __ ...... ...... ........__ ........

h GENERATING STATIONS

SALEM UNIT I UNPLANNED SHUTDOWN (LCOs) entered during the month LIMITING CONDITION O F OPERATION (LCO) Updated Monthly Chart Owner I I Salem System Engineering Manager Goal: 2 per Month (NRC) called Technical Specifications. Certain rules require operators to enter a ;hutd& LCO.

meaning the equipment must be fixed in a defined period of time, or unit shutdown is required. This metric measures the unplanned entries made at Salem Unit 1, compared t o the expected number at top performing nuclear units (less than or equal to %month).

monthly average is 2.67. The goal was NOT met Historical Data Not Available In 2004. several components such as containment fan coil units (CFCU). chillers, waste gas analyzers (WGA) and radiation monitors experienced multiple failures.

Several interim measures to improve CFCU short-term reliability have been initiated and implemented. The long-term fix is a system modification that installs a new cooling system. With respect to the chillers, a study has been initiated to develop solutions for ensuring reliability ofthe chillers until the end of plant life. For the WGA. the failures have been evaluated, resulting in procedure changes t o ensure accurate calibration of WGA instruments. To improve radiation monitor reliability, over 1 2 0 channels will be upgraded, modified. replaced. and/or deleted.

I 10 mMonthly Shutdown LCOs t . Monthly Shutdown LCOs Goal Jan Feb Mar Apr May Jun Jul AW SeP Oct Nov Dec I GENERATING STATIONS

Clefinifion h e number of Unplanned Non-Shutdown Technical SALEM UNIT I UNPLANNED NON-SHUTDOWN Specification hmiting Conditions of Operation (LCOs) entered during !he month LIMITING CONDITION OF OPERATION (LCO) Updated Monthly ENTRIES 392404 442004 Chart Owner Salem System Engineering Manager I Goal: 6 per Month Nuclear plants are operated under a fundamental set of rules from the Nuclear Regulatory Commission (NRC) called Technical Specifications. Certain rules require operators to enter a non-shutdown LCO.

meaning the equipment must be fixed in a defined period of time, or you are required t o take compensatory measures. This metric measures the unplanned entries made at Salem Unit 1, compared to the expected number at top petforming nuclear units (less than or equal to Wrnonth).

Historical Data Not Available quarter. The 4th quarter monthly average is 4.3. The goal was met.

20 I 0 Monthly Non -

Shutdown LCOs I

+Monthly Non -

Shutdown I LCOsGoal I w ) GENERATING S T A T I O N S

LIMITING CONDITION OF OPERATION (LCO) Updated: Monthly Nuclear plants are operated under a fundamental set of rules from the Nuclear Regulatory Commission (NRC) called Technical Specifications Certain rules require operators to enter a shutdown LCO.

meaning the equipment must be fixed in a defined period of bme. or unit shutdown is required This metnc measures the unplanned entries made at Salem Unit 2 , compared t o the expected number at toy performing nuclear units (less than or equal to 2fmonth)

Historical Data Not Available 4th quarter monthly average was two per month which met the goal.

10 ,

mMonthly Shutdown LCOs

+Monthly Shutdown LCOs Goal Jan Feb Mar Apr May Jun Jul Aug SeP Oct Nov Dec h \

1 GENERATING STATIONS

lThe number of Unplanned Non-Shutdown SALEM UNIT 2 UNPLANNED NON-SHUTDOWN Technical Specification Limiting Conditions of Operation &COS) entered during the month.

LIMITING CONDITION OF OPERATION (LCO) Updated: Monthly ENTRIES Chart Owner 342004 4 ~ 2 0 ~

Salem System Engineering Manager Goal: 6 per Month Nuclear plants are operated under a fundamental set of rules from the Nuclear Regulatory Commission (NRC) called Technical Specifications Certain rules require operators to enter a non-shutdown LCO.

meaning the equipment must be fixed in a defined period of time, or you are required to take compensatory measures This metric measures the unplanned entnes made at Salem Unit 2.

compared to the expected number at top performing nuclear units (less than or equal to Wmonth)

Historical Data Not Available There were a total of 39 Unplanned Non-Shutdown LCOs in 2004.15 of which occurred in the 4th quarter The 4th quarter monthly average i s 5 . The goal was met A negative trend, however. continues with respect to various station radiation monitors. To improve radiation monitor reliability, over 120 channels will be upgraded, modified, replaced, andor deleted. To date. 39 channels for Unit 2 have been completed.

0 Monthly Non -

Shutdown

+-Monthly Shutdown LCOs Goal w GENERATING S T A T I O N S

Specification hmiting Conditions of Operation (LCOs) entered dunng the month TlNG CONDITION OF OPERATION (LCO) Updated Monthly Hope Creek System Engineering Manager 2 per Month Nuclear plants are operated under a fundamental set of rules from the Nuclear Regulatory Commission-(NRC) called Technical Specificabons Certain rules require operators to enter a shutdown LCO. meaning the equipment must be frxed in a defined penod of tme. or unit shutdown is required This metric measures the unplanned entnes made at Hope Creek, compared to the expected number at top performin$

nuclear unlts (less than or equal to Zmonth)

Historical Data Not Available NOTE: Hope Creek Station was in an extended refueling outage for most of the 4th quarter 10 mMonthly Shutdown LCOs

+Monthly Shutdown LCOs Goal Jan Feb Mar APr May Jun Jul Aug SeP OCt Nov Dec si/- w creek

) GENERATING STATIONS

PSEG Nuclear, LLC I December2004 I Status De :in ition The number of Unplanned Non-Shutdown Technical HOPE CREEK UNPLANNED NON-SHUTDOWN Specification Limiting Conditions of Operation (LCOs:

entered during the month.

LIMITING CONDITION OF OPERATION (LCO) Updated: Monthly ENTRIES Chart Owner 342004 402004 Hope Creek System Engineering Manager I Goal: 6 per Month History Intent of Metric Nuclear plants are operated under a fundamental set of rules from the Nuclear Regulatory Commission (NRC) called Technical Specifications Certain rules require operators to enter a non-shutdown LCO, meaning the equipment must be fixed in a defined period of time. or you are required to take compensatob measures This metric measures the unplanned entries made at Hope Creek, compared to the expected number at top performing nuclear units (less than or equal to #month)

I Analysis and Actions Historical Data Not Available The goal was met.

NOTE: Hope Creek Station was in an extended refueling outage for most of the 4th quarter 20 1 -1 0 Monthly Non -

Shutdown

+Monthly Non -

Shutdown LCOs Goal w i GENERATING STATIONS

The sum of the planned and unplanned hours thal the Emergency Diesel Generators were not SALEM UNIT 1 EMERGENCY DIESEL GENERATOR Updated Monthly available.

UNAVAILABILITY I

302004 4Q2004 Chart Owner 21.9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> per month Salem System Engineering Manager Goal: (36-tnoirthrolling average)

Intent of Metric

]Nuclear plants are designed With a SI es of redundant safety systems and equipment. This allows equipment to be 150 ~

removed from service for maintenance. This metric monitors the amount of time the Emergency Diesels are out of service, compared against industry top quattile. The total represents the sum of the unavailable hours ofthe three e ~______

a 125 - ~

Emergency Diesel Generators at Salem Unit 1 , This is a longterm trend of our performance.

I loo -

79 75 .............

50- .....

rolling average:The-goal was not met for the 36-month rolling average; however, for the calendar year, Salem z6 Unit 1 met the top quartile goal.

25 . .- ....................

0, Improvements have been made to the reliability of the air start system 2002 2003 I

0 175

- Good Monthly Actual

- rn -36Month Rolling Actual

-36 Month Indusby TOP Quartile

(/ GENERATING STATIONS

SALEM UNIT 2 EMERGENCY DIESEL GENERATOR the EmergencyDiesel Generators were not Updated Monthly UNAVAILABILITY Chart Owner I

21.9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> per month Salem System Engineering Manager Goal:

(36moillh rolliiig average)

A!4 ?

,',Intentof Metric INuclear plants are designed with a SI ?s of redundant safety systems and equipment This allows equipment to be 50 1-50 removed from service for maintenance. This metric monitors the amount of time the EmergencyDiesels are out of I service, comparedagainst industry top quartile. The total represents the sum of the unavailable hours of the three

-(u 125 EmergencyDiesel Generators at Salem Unit 2. This is a long-term trend of our performance.

Qm loo 6-50 ZE

?

a 0 75 25 - _ _

2002

~

~

m

~

Salem 2 EmergencyDiesel Generator unavailabilityis 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> versus a goal of 21 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> on a 36-month rolling average. The goal was not met for the 36-mOnth rolling average, however,for the calendar year, Salem Unit 2 met the top quamle goal.

175

~~ . . . . . . . .. . .. . . ... . . . . ... .-....... ... . ..... .~. _

125 ~ . ...~ .. ~ ~ ~ ~ . . .. . ~ ... . . . .. . . . .. ~ ~ ..... ............... ........ .

-Monthly 1501 ~~

Actual

- -36Month Rolling Actual

-36 Month industry Top Quartile Jan Feb Mar APr May Jun Jul Aug SeP Oct Nov Dec

(/ ) G E N ~ A T I N GSTATIONS

the EmergencyDiesel Generators were not HOPE CREEK EMERGENCY DIESEL GENERATOR available.

Updated: Monthly UNAVAl LABILlTY Chart Owner 342004 4Q2004 29.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per month Hope Creek System Engineering Manager Goal: i36-manth rollina averaael 150 removed from sewce for maintenance This metric monltorsthe amount of time the Emergency Diesels are out of 1% sewce. compared against industrytop quartlle The total representsthe sum of the unavailable hours of the four

_-__ -~ Emergency Diesel Generators at Hope Creek This is a long-termtrend of our performance

~ . .. .._ .. . ..

49

. ____ - average. The goal was not met.

4IEl -___

-m3 In 2004, all maintenance performed (363 hours0.0042 days <br />0.101 hours <br />6.001984e-4 weeks <br />1.381215e-4 months <br />) with the exceptionof 61 hours7.060185e-4 days <br />0.0169 hours <br />1.008598e-4 weeks <br />2.32105e-5 months <br />, was planned maintenance designed to improw system reliability of the Hope Creek EmergencyDiesel Generators (EDGs) System unavailabilitywas further managed by performing241 EDG preventative and corrective maintenancework orders in refueling outage RF12. This outage work scope significantly reduced future planned online maintenance unavailabilityhours Actions in 2005 will include continuingto minimize unavailabilty hours of the online workwindows by optimizing EDG schedules and performingwork in parallel.

175 150

-Monthly 125 Actual 100

- -36Month Rolling 75 Actual 50

-36 Month lndumy 25 TOP Quartile 0

Jan Feb Mar APr Jun Jul SeP oct Nov Dec sa-l w Creek

) GENFRATING STATIONS

the Auxiliary Feedwater Systems were not Updated Monthly U N AVAl LAB1LITY 7.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per month Salem System EngineeringManager Goal: W-snonlh rolliiig aveiage)

Nuclear plants are designed wth a series of redundant safely systems and equipment This allows equipment to be 1 s removed from setwce for maintenance This metric monltors the amount of bme the Salem Unt 1 Auxtliay 109 Feedwater System is out of semce compared against industry top quartile The total represents the sum of the three Auxlliary Feedwater Systems on Salem Unit 1 This is a long-term trend of our performance The goal was not met.

In 2004, Salem Unit 1 atodliaryfeedwater availabilitywas challenged by repeat failures of a wive that admits steam into a turbine that drives the 13 aux feed pump and failure of the overspeed trip latch mechanism. For the steam admission valve. repeated efforts to correct the condition resulted in unavailability. The cause of the condition is nw 2002 2003 well understood and has been corrected. The overspeed latch mechanism failure was due to a worn latch. The condbon has been corrected and inspection procedures have been improved. To further improve this trend, all corrective and preventative maintenance workwill be optimized with respect to online and outage windows to ensuri system unavailability is minimized.

Q Good Monthly Actual

- -36Month Rolling Actual

-36 Month Industry TOP Quartile Jan Feb Mar APr May Jun Jul Aw SeP Oct Nov Dee

(/ I GENERATING S T A T I O N S

the Auxiliary Feedwater Systems were not Updated Monthly UNAVAILABILITY 7.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per month Salem System Engineering Manager Goal: @month rolling average)

Nuclear plants are designed wth a series of redundant safety systems and equipment This allows equkment to be removed from seMce for maintenance This metric monttors the amount of time the Salem Unt 2 Auxiliary Feedwater System is out of setme compared against industry top quarhle The total represents the sum of the three Auxtliary Feedwater Systems on Salem Unt 2 This is a long-term trend of our performance Salem Unit 2 Auxiliaty Feedwater Unavailability is 1 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> versus a goal of 7.4hours on a 36-month rolling average. The goal was not met.

In 2004,Salem Unit 2 auxiliary feedwater unavailabilitywas caused by scheduled preventative and corrective maintenance to improve system condition. Lessons learned from the Salem Unit 1 +turbine-driven pump failures are being incorporatedinto the Unit 2 equipment procedures.

175 -

Good 150 ___ ............ ____ .. ____ __ ........... __ ............. ~ _ _ _...._

125 4. ................... __ . . . . ............ __ . . ___...

Monthly Actual

=

m 75 - __ ~ . _ _ __ ___...........

- -36Month Rolling 3

E Actual

_ _ _ ~ ......... .

I

~~

1-36 Month GENFRATING STATIONS

The sum of the planned and unplanned hours thai HOPE CREEK RESIDUAL HEAT REMOVAL SYSTEM the Residual Heat Removal Systems were not Updated Monthly available UNAVAILABILITY Chart Owner 3Q2004 402004 Hope Creek System Engineering Manager I Goal:

9.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per month (36month rolling average)

Nuclear plants are designed with a senes of redundant safety systems and equipment This allows equipment 125 to be removedfrom setwce for maintenance This memc monitors the amount of tlme the Hope Creek Residual Heat RemovalSystems are out of serwce comparedagainst industrytop quarble The total representsthe sum of both Residual Heat Removaltrains at Hope Creek This is a longterm trend of our performance goal was met.

2 0

Good Actual-

- -I 36 Month Rolling Actual

-36 Month Industry TOP Quartile Jan Feb Mar APr MW Jun Jul Aug SeP OCt Nov Dee

-/as w Creek

) GENERATING STATIONS

The sum ofthe planned and unplanned hours tha

'I1 SALEM UNIT 1 CHEMICAL VOLUME CONTROL AND Updated Monthly the ChemicalVolume Control and Safety lnjecbor Systems were not available SAFETY INJECTION SYSTEM UNAVAILABILITY Chart Owner 3 ~ 2 0 0 0 4azood 7.3hours per month Salem System EngineeringManager Goal:

(36moiitlt rolling average)

Nuclear plants are designed with a series of redundant safety systems and equipment. This allows equipment to be removed from sewice for maintenance. This metric monitors the amount of time the Salem Unit 1 ChemicalVolume Control and Safety InjectionSystems are out of service compared against industry top quartile. The total represents the sum of the four trains an Salem Unit 1. This is a long-term trend of our performance.

7.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> on a 36-month rolling average. The goal was not met.

In 2004. availabilitywas adversely impactedby 1)the failure of a charging pump discharge checkvalve and 2) i charging pump speed increaser which was replaced due to vibrations trending up. Performance problemswith m2 2 m the nonECCS 13 charging pump caused additional reliance on the 11 and 12 pumps, which resulted in increased maintenance activities to maintain coolers in a clean condition. Actions are in progressto restore the 13 charging pump to service.

Actual I00 75 - W -36Month Rolling Actual 50

-36 Month 25 0

I Industry zrtile I Jan Feb Mar AP~ May Jun Jul Aug Sep Oct Nov Dee GENFRATING STATIONS

Updated Monthkj SAFETY INJECT10 Chart Owner 7.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> per month Salem System Engineering Manager Goal:

(%month rolling average) removed from service for maintenance. This metric monitors the amount of time the ChemicalVolume Control and Safety Injection Systems are out of service compared against industrytop quartile. The total representsthe sum of

__ . . . . .. . ... ... . . . . ~ ~

the four trains on Salem Unit 2. This is a long-term trend of our performance.

35 of 7.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> on a 36-month rolling average. The goal was not met.

Unavailabilityof the safety-relatedcharging pumps had been improving since the non-ECCS positive displacement pump (23 Charging Pump) was restored to normal service.

175 Good 150 125 -Monthly Actual (D

L 2 100 s

.- - -36Month 3

E 75 Rolling Actual 50 36 Month Industry 25 TOP Quartile 0

Jan Feb Mar APr May Juri Jul AW SeP OCt Nov Dee w ) GENFRATINGSTATIONS

OLATION COOLING SYSTEM Updated Monthly Hope Creek System Engineering Manager removed from service for maintenance. This metric monitors the amount of time the High Pressure Injection and Reactor Core Isolation Cooling Systems are out of service compared against industry tap quartile. The total represents

.......... ___ ...... the sum of both systems at Hope Creek. This is a lonpterm trend of our performance.

. . . . . . . . . . ~_.____-

175 150 125 Actual-s H 100 Q

(D E 75

- - 36Month Rolling 2 Actual 50

+36 Month Industry 25 TOP Quartile 0

Jan Feb Mar AP~ May Jun Jul Aug Sep Oct Nov Dec

-/as (/

Creek

) GENERATING STATIONS