PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 0PSEG Nuclear LLC Technical Specification 6.9.1.5.b LR-N18-0020 APRl 0 Z018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555-001 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 Docket No. 50-354

Subject:

Technical Specification 6.9.1.5.b 2017 Annual Report of SRV Challenges This report is being submitted in accordance with Hope Creel< Technical Specification 6.9.1.5.b, which requires the documentation of all challenges to main steam line safety/relief valves (SRVs) be provided on an annual basis.

For2017, the SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically.

There are no regulatory commitments contained in this letter.

If you have any questions or require additional information, please contact Ms. Alysse K. Ochoa at 856-339-2742.

Slnc?JJ-AZ-)

Edward T. Casulli Plant Manager Hope Creek Generating Station al<o

LR-N18-0020 Technical Specification 6.9. 1.5.b Page 2 cc: Mr. David Lew, Acting Regional Administrator- NRC Region 1 Ms. Carleen Parker, Project Manager~ USNRC Mr. Justin Hawkins, USNRC Senior Resident Inspector - Hope Creek Mr. Patrick Mulligan, Manager IV, NJBNE Mr. Lee Marabella, Corporate Commitment Tracking Coordinator Mr. Thomas MacEwen, Hope Creek Commitment Tracking Coordinator