Forwards Public & Central Files Versions of Revised Epips, Including FC-EPF Forms Index Issued 950808,Rev 4 to FC-EPF-10,FC-EPF Forms Index Issued 950810,Rev 2 to FC-EPF-2 & Rev 5 to FC-EPF-8.Central Files Version Withheld
ML20091L502
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/21/1995
From: Tira Patterson
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19330G237 List:
References
LIC-95-0162, LIC-95-162, NUDOCS 9508290218
Download: ML20091L502 (2)


Text

(

l Omaha Public Power District 444 South 16th Street Mall Omaha. Nebraska 68102-2247 402/636-2000 August 21, 1995 LIC-95-0162 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington, DC 20555

Reference:

Docket No. 50-285

SUBJECT:

Transmittal of Changes to the Fort Calhoun Station (FCS) Emergency Plan Implementing Procedures (EPIP)

In accordance with 10 CFR 50 Appendix E Part V and 10 CFR 50.4(b)(5)(iii),

please find the following EPIP changes enclosed for the Document Control Desk (

(holder of Copy 165) and the NRC Region IV Administrator (holder of copies 154, 155 and 156). Please return the attached receipt confirmation forms using the enclosed pre-addressed envelopes by October 7,1995.

REMOVE SECTION INSERT SECTION FC-EPF Forms Index, page 1, FC-EPF Forms Index, page 1, issued 7/11/95 issued 8/8/95 FC-EPF-10, R3, issued 4/19/93 FC-EPF-10, R4, issued 8/8/95 FC-EPF Forms Index, page 1, FC-EPF Forms Index, page 1, issued 8/8/95 issued 8/10/95 FC-EPF-2, R1, issued 8/23/93 FC-EPF-2, R2, issued 8/10/95 FC-EPF-8, R4, issued 8/23/93 FC-EPF-8, R5, issued 8/10/95  ;

I Please note that this change to Form FC-EPF-10 does contain proprietary information which may not be released to the Public Document Room. These issues may only be used for internal NRC copies of the FCS EPIP manuals. A censored version of this procedure has been provided for the Public Document Room.

kt 9508290218 950821 [ l PDR

([ f F

ADOCK 05000285 PDR -

45 5120 Employment witti Equal opportumty , i J

.l

~

)

' O,, S. : N'uclear' Regulatory Commission

'LIC-95-0162 Page'2 l

-Summary of Chances l

FC-EPF-10 was' revised-to delete positions from the Technical Support Center

'and Control Room 24-hour staffing schedule. . The. revision to Form FC-EPF-2 j 1"Offsite' Monitoring Log" included _ instrument changes 'and the use of a .  ;

different font. : Revision 5 of form FC-EPF-8 " Sample Worksheet" . replaced the i HP-260 probe with.the Geiger-Muller (GM) pancake' probe. l.

If you should have any questions, please contact me~. j Sincerely, fk  ;

T. L. Patterson

~.

Division ~ Manager Nuclear Operations  ;

TLP/dll' Enclosures  :

c: Winston&Strawn(w/oEnclosures)

L. J. Callan, NRC. Regional Administrator, Region IV S. D. Bloom, NRC Project Manager (w/o Enclosures)

W. C. Walker, NRC Senior Resident Inspector (w/o Enclosures) i 4