LIC-03-0065, Transmittal of Changes to Emergency Plan Implementing Procedures & to Emergency Planning Forms

From kanterella
Jump to navigation Jump to search
Transmittal of Changes to Emergency Plan Implementing Procedures & to Emergency Planning Forms
ML031330348
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/28/2003
From: Ridenoure R
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-03-0065
Download: ML031330348 (36)


Text

_~ -

Omaha Public Power District 444 Soutlh 16tlh Street Mall Omaha NE 68102-2247 April 28, 2003 LIC-03-0065 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Reference:

Docket No. 50-285

SUBJECT:

Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP) and to Emergency Planning Forms (EPF)

In accordance with 10 CFR 50.54(q), 10 CFR 50, Appendix E, Section V, and 10 CFR 50.4(b)(5), please find EPF change packages enclosed for the Document Control Desk (holder of Copy 165) and the NRC Region IV Plant Support Branch Secretary (holder of Copies 154 and 155).

The document update instructions and summary of changes are included on the Confirmation of Transmittal form (Form EP-1) attached to each controlled copy change package. Please return the Confirmation of Transmittal forms by June 16, 2003.

The revised documents included in the enclosed package are:

EPIP Index issued 04/15/03 EPIP-EOF- 7 R14 issued 04/15/03 EPIP-RR-19A R6 issued 04/15/03 FC-EPF Index issued 04/22/03 FC-EPF-19 R7 issued 04/22/03 No commitments are made to the NRC in this letter. If you have any questions regarding the enclosed changes, please contact Mr. Carl Simmons at (402) 533-6430.

Sincerely, c: NRC Region IV Plant Support Branch Secretary (2 sets)

Alan Wang, NRC Project Manager (w/o enclosures)

J. G. Kramer, NRC Senior Resident Inspector (w/o enclosures)

Winston & Strawn (w/o enclosures)

Emergency Planning Department (Nv/o enclosures) p4W Enplopnent IVithl Equal Opportunity

FORM EP-1 Rev. 6 (04(29/99)

OMAHA PUBLIC POWER DISTRICT Confirmation of Transmittal for Emergency Planning Documents/information g

D Radiological Emergency Response Plan (RERP) 11 mpegentin Proceduresgny Impementin EP Procedures Forms (EPF)

Planning D2 Emergency Planning Department Manual F Other Emergency Planning Document(s)/

(EPDM) Information Transmitted to:

Name: Document Control Desk Copy No: 165 Date:

Division of Reactor Safety CopV No: 154 Attn: Senior Emergency Preparedness Inspector Division of Reactor Safety Copy No: 155 Attn: Senior Emergency Preparedness Inspector The following document(s) I information are forwarded for your manual:

REMOVE SECTION INSERT SECTION EPIP Index 3 pages issued 04/03/03 EPIP Index 3 pages issued 04/15/03 EPIP-EOF-7 R13 issued 10/31/00 EPIP-EOF-7 R14 issued 04/15/03 EPIP-RR-19A R5 issued 10/07/99 EPIP-RR-19A R6 issued 04/15/03 FC-EPF Index page 2 of 3 issued 10/08/02 FC-EPF Index page 2 of 3 issued 04/22/03 FC-EPF 19 R6 issued 09/01/94 FC-EPF-19 R7 issued 04/22/03 Summary of Changes:

EPIP-EOF-7 was revised to clarify guidance for determining and adjusting PARs. EPIP-RR-1 9A was revised to insert step in Attachment 6.2 to include tracking of EOP's and AOP's by TSC Ops Liaison. FC-EFP-1 9 was revised to add room numbers and equipment locations to the maps.

Supervisor - Emergency Planning I hereby acknowledge receipt of the above documents/information and have included them in my assigned manuals.

Signature: Date:_

Please sign above and return by 06113/03 to: Beth Nagel Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 16th Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)linformation contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below.

El Document(s)fInformation No Longer Requested/Needed El Document(s)/Information Transferred to:

Name: Mailing Address:

Fort Calhoun Station Emergency Plan Implementing Procedure Index Page 1 of 3 EPIP Document Document Title Revision/Date EPIP-OSC-1 Emergency Classification R35 05-02-02 EPIP-OSC-2 Command and Control Position Actions/Notifications R41 01-16-03a EPIP-OSC-9 Emergency Team Briefings R7 12-09-99 EPIP-OSC-15 Communicator Actions R22 10-24-00 EPIP-OSC-21 Activation of the Operations Support Center R12 10-29-02 EPIP-TSC-1 Activation of the Technical Support Center R23 10-29-02 EPIP-TSC-2 Catastrophic Flooding Preparations R3 01-23-03 (RO 03-22-95) DELETED (05-09-95)

REINSTATED EPIP-TSC-8 - Core Damage Assessment - - R14 01-19-01 EPIP-EOF-1 Activation of the Emergency Operations Facility R13 10-29-02 EPIP-EOF-3 Offsite Monitoring R18 11-12-02 EPIP-EOF-6 Dose Assessment R32 01-23-02 EPIP-EOF-7 Protective Action Guidelines R14 04-15-03 EPIP-EOF-10 Warehouse Personnel Decontamination Station R10 01-13-OOa Operation EPIP-EOF-11 Dosimetry Records, Exposure Extensions and R19 04-03-03 Habitability April 15, 2003 8:48:41am

Fort Calhoun Station Emergency Plan Implementing Procedure Index Page 2 of 3 EPIP Document Document Title Revision/Date EPIP-EOF-19 Recovery Actions R7 09-30-98 EPIP-EOF-21 Potassium Iodide Issuance R4 11-07-00 EPIP-EOF-23 Emergency Response Message System R5 10-12-99 EPIP-EOF-24 EOF Backup Alert Notification System Activation R3 09-09-99 EPIP-RR-1 1 Technical Support Center Director Actions R14 02-29-00 EPIP-RR-13 Reactor Safety Coordinator Actions R14 12-09-99a EPIP-RR-17 TSC Security Coordinator Actions R15 12-10-02 EPIP-RR-17A TSC Administrative Logistics Coordinator Actions R20 11-07-02 EPIP-RR-19A Operations Liaison Actions R6 04-15-03 EPIP-RR-21 Operations Support Center Director Actions R12 09-23-99 EPIP-RR-21A Maintenance Coordinator Actions R4 11-30-99 EPIP-RR-22 Protective Measures Coordinator/Manager Actions R21 07-02-01 EPIP-RR-22A Chemistry Coordinator Actions R6 12-07-01 EPIP-RR-25 EOF Dose Assessment Coordinator Actions R20 11-15-01 EPIP-RR-28 OSC Accountability and Dosimetry Technician Actions R8 09-25-01 April 15, 2003 8:48:41am

Fort Calhoun Station Emergency Plan Implementing Procedure Index Page 3 of 3 EPIP Document Document Title Revision/Date EPIP-RR-29 EOF Administrative Logistics Manager Actions R20 11-07-02 EPIP-RR-39 Control Room Medical Responder Actions RO 03-27-01 EPIP-RR-63 EOF Dose Assessment Assistant Actions { R10 11-19-01 EPIP-RR-66 Communication Specialist Actions l_R8 08-31-99 EPIP-RR-72 Field Team Specialist Actions R13 07-09-02 EPIP-RR-87 Radiation Protection Coordinator Actions R7 08-24-00 EPIP-RR-90 EOF/TSC CHP Communication Actions RO 10-24-00 January 29, 2003 9:47:6am

wP1o Distribution Authorized This procedure does not contain any proprietary information, or such information has been Fort Calhoun Station censored. This issue may be Unit No. 1 released to the public document room. Proprietary information includes personnel names, company telephone numbers, and any information, which could impede emergency response.

EPIP-EOF-7 EMERGENCY PLAN IMPLEMENTING PROCEDURE

Title:

PROTECTIVE ACTION GUIDELINES FC-68 Number: EC 31470 Reason for Change: Clarify guidance for determining and adjusting PARs.

Requestor: Mark Reller Preparer: Mark Reller ISSUED: 04-15-03 3:00 pm R14

FORT CALHOUN STATION EPIP-EOF-7 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 1 OF 5 PROTECTIVE ACTION GUIDELINES

1. PURPOSE 1.1 This procedure outlines the guidelines for determining Protective Action Recommendations (PARs).
2. REFERENCES/COMMITMENT DOCUMENTS 2.1 "Manual of Protective Action Guides and Protective Actions for Nuclear Incidents",

EPA 400-R-92-001, May 1992 2.2 "Response Technical Manual" NUREG/BR-0150, USNRC, Volume 1, Rev. 4, March 1996 2.3 "Protective Measures Basis Document", CHP-00-038, September 28, 2000

3. DEFINITIONS None
4. PREREQUISITES 4.1 An emergency has been declared per EPIP-OSC-1.
5. PROCEDURE NOTE: When an Emergency Notification Form (FC-1188) is issued a Protective Action Recommendation (PAR) must be made. A PAR is considered developed when the FC-1 188 is signed.

NOTE: For a Notification of Unusual Event (NOUE) or Alert the PAR is typically "None".

NOTE: At a General Emergency the minimum PAR is the evacuation of a 2 mile radius (all sectors) around the plant (Sub Areas 1 and 10).

NOTE: Do not delay required notifications while awaiting dose assessment projections or field team results.

5.1 PAR Determinations are made as follows:

5.1.1 Using Attachments 6.1 and 6.2, determine the appropriate PAR.

R14

FORT CALHOUN STATION EPIP-EOF-7 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 2 OF 5 NOTE: Adjustments to the downwind sectors selected using the following methods may be needed based on previously affected sectors and meteorological conditions such as wind shifts.

5.1.2 To determine downwind sectors:

A. IF a release is in progress AND EAGLE dose assessment results are available, use the sectors in the EAGLE dose assessment results.

OR B. IF a release is in progress AND the EAGLE dose assessment results are not available, use the Isopleths wheel.

OR C. IF there is no release, use the Isopleths wheel.

5.1.3 Document on the PAR worksheet, the PAR and the reasons, if any, for sector differences from or additions to the above method used.

5.2 Record PAR(s) on Emergency Notification Form (FC-1188).

5.3 PAR Preparation and Review 5.3.1 In the Control Room A. Operations personnel normally prepare PAR(s) based on plant conditions.

B. The dose assessment position normally prepares PAR(s) based on radiological conditions.

5.3.2 In the Technical Support Center (TSC)

A. The Operations Liaison Group or the Site Director normally prepares PAR(s) based on plant conditions.

B. The TSC Protective Measures Coordinator normally prepares PAR(s) based on radiological conditions.

5.3.3 In the Emergency Operation Facility (EOF)

A. The Protective Measures Manageres Group normally prepares PAR(s),

with assistance from the Operations Liaison Group.

R14

FORT CALHOUN STATION EPIP-EOF-7 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 3 OF 5 5.3.3 B. The Protective Measures Manager normally reviews PAR(s).

5.4 The Command and Control Position must approve all PAR(s).

NOTE: State and county officials are responsible for the final decision on what Protective Actions are issued to the public.

5.5 Transmit the PARs to the state and counties per EPIP-OSC-2 and EPIP-OSC-15.

6. ATTACHMENTS 6.1 Protective Action Recommendations Flowchart Based on Plant Conditions and Radiological Data 6.2 Protective Action Recommendations Based on Dose Assessment/Field Team Radiological Data R14

FORT CALHOUN STATION EPI P-EOF-7 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 4 OF 5 Attachment 6.1 - Protective Action Recommendations Flowchart Based on Plant Conditions and Radiological Data R14

FORT CALHOUN STATION EPIP-EOF-7 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 5 OF 5 Attachment 6.2 - Protective Action Recommendations Based on Dose Assessment/Field Team Radiological Data Early Phase (Plume Phase):

Projected Dose Protective Action Recommendation (PAR)

<1 rem TEDE None (NO PAR REQUIRED)

<5 rem CDE (thyroid) and continue to monitor radiological conditions

Ž1 rem TEDE Evacuate

>5 rem CDE (thyroid) Shelter, if it will provide protection equal to or greater than evacuation up to 10 rem (NOTE)

Ž50 rem SDE (skin) Evacuate NOTE: Sheltering may be preferable to evacuation as a protective action in some situations.

Because of the higher risk associated with evacuation of some special groups in the population (e.g. those who are not readily mobile), sheltering may be the preferred alternative for such groups as a protective action at projected doses up to 5 rem TEDE. In addition, under unusually hazardous environmental conditions, use of sheltering up to 5 rem TEDE to the general population (and up to 10 rem to special groups) may be justified.

For example, situations when evacuation may not be appropriate at 1 rem TEDE include:

(1) the presence of severe weather; (2) competing disasters; (3) institutionalized people who are not readily mobile; and (4) local physical factors which impede evacuation.

R14

wP1o Distribution Authorized Fort Calhoun Station This procedure does not contain Unit No. 1 any proprietary information, or such information has been censored. This issue may be released to the public document room. Proprietary information includes personnel names, company telephone numbers, EPIP-RR-1 9A and anyemergency impede information,response.

which could EMERGENCY PLAN IMPLEMENTING PROCEDURE

Title:

OPERATIONS LIAISON ACTIONS FC-68 Number: EC 31900 Reason for Change: Insert step in Attachment 6.2 to include tracking of EOP's and AOP's by TSC Ops Liaison.

Requestor: Mark Reller Preparer: Mark Reller ISSUED: 04-15-03 3:00 pm R6

FORT CALHOUN STATION EPIP-RR-1 9A EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 1 OF 8 OPERATIONS LIAISON ACTIONS NON-SAFETY RELATED

1. PURPOSE 1.1 This procedure provides guidance to the Control Room, TSC, OSC and EOF Operations Liaisons in performing actions in response to an emergency at Fort Calhoun Station [AR 11390].
2. REFERENCES/COMMITMENT DOCUMENTS 2.1 EPIP-OSC-1, Emergency Classification 2.2 EPIP-EOF-7, Protective Action Guidelines 2.3 FCS Abnormal Operating Procedures (AOPs) 2.4 FCS Emergency Operating Procedures (EOPs) 2.5 Ongoing Commitments
  • AR 11390, LIC-91-065R
3. DEFINITIONS None
4. PREREQUISITES None
5. PROCEDURE NOTE: The attached checklist are designed as a reminder of actions which are required to be performed during an emergency condition.

5.1 The Control Room Operations Liaison will use Attachment 6.1 as an aid to completing required actions [AR 11390].

5.2 The TSC Operations Liaison will use Attachment 6.2 as an aid to completing required actions.

5.3 The EOF Operations Liaison will use Attachment 6.3 as an aid to completing required actions.

R6

FORT CALHOUN STATION EPIP-RR-19A EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 2 OF 8 5.4 The OSC Operations Liaison will use Attachment 6.4 as an aid to completing required actions.

5.5 Review the procedure and appropriate checklist, and accomplish the applicable steps both upon initial activation and periodically, as required, thereafter.

5.6 At the completion of the shift or at event termination, initial the steps which have been completed.

5.7 Retain all documentation (logs, calculation sheets, notes, etc.) generated or used during the emergency. At the termination, deliver all documentation to the TSC Administrative Logistics Coordinator in the TSC, or the EOF Administrative Logistics Manager in the EOF.

6. ATTACHMENTS 6.1 Control Room Operations-Liaison Checklist 6.2 TSC Operations Liaison Checklist 6.3 EOF Operations Liaison Checklist 6.4 OSC Operations Liaison Checklist R6

FORT CALHOUN STATION EPIP-RR-1 9A EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 3 OF 8 Attachment 6.1 - Control Room Operations Liaison Checklist

  • Page 1 of 1
  • Maintain a log of all key activities *
  • INIT/TIME
1. Sign in on the Accountability Roster, obtain worker packet and put on Position Identification Badge. /
2. Interface with the Control Room Coordinator to receive a briefing on the following:

2.1 Plant status and actions taken; 2.2 Current Classification; 2.3 Plant prognosis; 2.4 Status of AOPs; 2.5 Status of EOPs. /

3. Stand by to establish a conference call with the TSC, OSC and EOF Operations Liaisons. The TSC and/or OSC and/or EOF will initiate this conference by calling the Control Room upon their arrival. - /
4. Periodically review the following steps and perform, as required.

4.1 Provide updates of the information listed above to the TSC, OSC and EOF Operations Liaisons using the established communications link. /

4.2 Provide a detailed briefing to your shift relief of any actions taken and the current emergency status. /

R6

FORT CALHOUN STATION - EPIP-RR-19A EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 4 OF 8 Attachment 6.2 - TSC Operations Liaison Checklist Page 1 of 2

  • Maintain a log of all key activities *
  • INIT/TIME
1. Sign in on the Accountability Roster, obtain worker packet and put on the Personnel Identification Badge. /
2. Using the Ops Liaison phone, perform the following:

2.1 Pick up the receiver and ask if the Control Room is on the line.

2.2 IF the Control Room is already on the line, THEN go to Step 3. Otherwise, continue.

2.3 Dial the Control Room number (listed on the pull-out template on the bottom of the phone) to access the Control Room Operations Liaison. /

3. Interface with the Control Room Operations Liaison to receive a briefing on the following:

3.1 Plant status and actions taken; 3.2 Current Classification; 3.3 Plant prognosis; 3.4 Status of AOP's; 3.5 Status of EOP's. /

4. Brief the Site and TSC Director on operational status and review status boards and ERFCS for accurate data. /
5. Assist the Site Director in formulating an appropriate protective action recommendation based on plant parameters when necessary. /

R6

FORT CALHOUN STATION EPIP-RR-1 9A EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 5 OF 8 Attachment 6.2 - TSC Operations Liaison Checklist Page 2 of 2

  • Maintain a log of all key activities *
  • INIT/TIME
6. Periodically review the following steps and perform, as required:

6.1 Interface with the NRC Response Team and OPPD support personnel on technical and operational matters relating to the emergency. /

6.2 Review EPIP-OSC-1 to determine if the current classification is valid. /

6.3 Follow the status of EOPs and AOPs and report significant changes or problems to the TSC Director. _ _ _ _ _ _ _ _ _ _ _ 4 6.4 Provide a detailed briefing to your shift relief of any actions taken and the current emergency status. I R6

FORT CALHOUN STATION  : EPIP-RR-19A EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 6 OF 8 Attachment 6.3 - EOF Operations Liaison Checklist - Page 1 of 2

  • Maintain a log of all key activities *
  • INIT/TIME
1. Obtain and put on the Personnel Identification Badge.
2. Using the Ops Liaison phone, perform the following:

2.1 Pick up the receiver and ask if the Control Room is on the line.

2.2 IF the Control Room is already on the line, THEN go to Step 3. Otherwise, continue.

2.3 Dial the Control Room number (listed on the pull-out template on the bottom of the phone) to access the Control Room Operations Liaison. l

3. Interface with the Control Room Operations Liaison and the TSC Operations Liaison to receive a briefing on the following:

3.1 Plant status and actions taken; 3.2 Current Classification; 3.3 Plant prognosis; /

4. Brief the Emergency Director on operational status and review status boards and ERFCS for accurate data. /
5. Periodically review the following steps and perform, as required:

5.1 Interface with the NRC Response Team and OPPD support personnel on technical and operational matters relating to the emergency. /

5.2 Assist the Emergency Director with staff and non-OPPD agency briefings. /

5.3 Review EPIP-OSC-1 to determine if the current classification is valid and keep the Emergency Director informed. /

R6

FORT CALHOUN STATION EPIP-RR-1 9A EMERGENCY PLAN IMPLEMENTING ~~~~. PROCEDURE . 2 .i PAGE 7 OF 8 Attachment 6.3 - EOF Operations Liaison Checklist Page 2 of 2

  • Maintain a log of all key activities *
  • INIT/TIME 5.4 Provide a detailed briefing to your shift relief of any actions taken and the current emergency status. I R6

FORT CALHOUN STATION EPIP-RR-1 9A EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 8 OF 8 Attachment 6.4 - OSC Operations Liaison Checklist Page 1 of 1

  • Maintain a log of all key activities *
  • INIT/TIME
1. Sign in on the Accountability Roster, obtain worker packet and put on the Personnel Identification Badge. l
2. Using the Ops Liaison phone, perform the following:

2.1 Pick up the receiver and ask if the Control Room is on the line.

2.2 IF the Control Room is already on the line, THEN go to Step 3. Otherwise, continue.

2.3 Dial the Control Room number (listed on the pull-out template on the bottom of the phone) to access the Control Room Operations Liaison. I

3. Interface with the Control Room Operations Liaison only when necessary to determine information applicable to OSC functions.

Brief the OSC Director when necessary. Some of these functions include:

3.1 Information concerning equipment/system status, especially when needed for team briefings. /

3.2 Operator dispatch directly to an affected area, so that the OSC personnel may be directed to assist if necessary. I 3.3 Operator dispatch to the OSC, so that the OSC may better prepare for necessary team briefing/dispatch process. I

4. Monitor the network to determine any other information that may impact the OSC, and inform the OSC Director. I
5. Periodically review the following steps, and perform, as required:

5.1 Provide a detailed briefing to your shift relief of any actions taken and the current emergency status. /

R6

Fort Calhoun Station Emergency Planning Forms Index Page 2 of 3

. FC-EPF Document Document Title Revision/Date FC-EPF-15 Drill Exercise Comment Form R3 07-11 -97a FC-EPF-17 Pager Response Follow Up Questionnaire R3 11-06-99 FC-EPF-19 Process and Area Monitor Locations R7 04-22-03 FC-EPF-20 Site Boundary/Owner Control Area RI 07-29-97 FC-EPF-21 Fort Calhoun Station Sector Map R2 05-15-97 FC-EPF-27 Onsite/Offsite Dose Comparison Data Record (Using Eagle Program) R3 11-07-00 FC-EPF-29 Estimation of Unmonitored Release Rates RI 12-30-93 FC-EPF-31 AT/aO Stability Class Chart R2 03-14-02 FC-EPF-32 Area Monitor Trending RO. 06-10-93 FC-EPF-33* Emergency Response Facility Computer System (ERFCS) RI 07-02-96 FC-EPF- ERFCS Function Key Mapping . R 10-08-02 33A FC-EPF-34 MRC Director Checklist RO 06-23-93 FC-EPF-35 Iowa EOC Route Map (double-sided) RO 06-21-94 FC-EPF-36 Briefing Guidelines R3 10-22-01 April 22, 2003 7:44 am

Distribution Authorized This procedure does not contain any proprietary information, or such information has been censored. This issue may be released to the public document room. Proprietary information includes personnel names, company telephone numbers, and any information, which could impede emergency response.

FORT CALHOUN STATION FC-EPF-1 9 EMERGENCY PLAN FORM R7 PAGE 1 OF 14 PROCESS AND AREA MONITOR LOCATIONS

- SITE TSC r-I NORTH JI 11 r

RM-067: PING '

RM-093: AREA MONITOR

FORT CALHOUN STATION FC-EPF-1 9 EMERGENCY PLAN FORM R7 PAGE 2 OF 14 PROCESS AND AREA MONITOR LOCATIONS AUXILIARY BUILDING (ELEV. 989'-0")

N NORw SITE -

-'kNORTH X ROOM NUMBERS RAD MONITORS

FORT CALHOUN STATION FC-EPF-1 9 EMERGENCY PLAN FORM R7 PAGE 3 OF 14 PROCESS AND AREA MONITOR LOCATIONS AUXILIARY BUILDING (ELEV. 971'-0")

w s l -

_:NRH =

0 ROOM NUMBERS

FORT CALHOUN STATION FC-EPF-1 9 EMERGENCY PLAN FORM R7 PAGE 4 OF 14 PROCESS AND AREA MONITOR LOCATIONS AUXILIARY BUILDING (ELEV. 1007' -0" & 1013' -0")

N _

( ROOM NUMBERS ( RAD MONITORS

FORT CALHOUN STATION FC-EPF-1 9 EMERGENCY PLAN FORM R7 PAGE 5 OF 14 PROCESS AND AREA MONITOR LOCATIONS AUXILIARY BUILDING (ELEV. 1036' -0")

&RM-064 (TURBINE BLDG.

N a SITE N-- ""NORTH v rELEV. 1036' -O')

(I EFWS X ROOM NUMBERS 0 RAD MONITORS

FORT CALHOUN STATION FC-EPF-1 9 EMERGENCY PLAN FORM R7 PAGE 6 OF 14 PROCESS AND AREA MONITOR LOCATIONS AUXILIARY BUILDING (ELEV. 1025'-0")

N N SITE

- NORTH G 0 ROOM NUMBERS ()RAO MONITORS

mO

-<0 m

MM r

CHEMISTRY AND RADIATION PROTECTION/CAFETERIA BUILDING C Cr

% I - =

IT"' L K- 0 a z

0 i 0 ZH

-4 I

m  : O CHEMISTRY L KZ I

r -

L I

=1 .. L

-a 11 m

rn 0

-n -ni

-A

FORT CALHOUN STATION FC-EPF-1 9 EMERGENCY PLAN FORM R7 PAGE 8 OF 14 PROCESS AND AREA MONITOR LOCATIONS RAD WASTE BUILDING N

RM-095 C)Lfl m

=

LAUNDRY AND SORTING STORAGE AREA GROUND FLOOR LEVEL MEZZANINE LEVEL 0 RAD MONITORS

FORT CALHOUN STATION FC-EPF-1 9 EMERGENCY PLAN FORM R7 PAGE 9 OF 14 PROCESS AND AREA MONITOR LOCATIONS TURBINE BUILDING BASEMENT n

FORT CALHOUN STATION FC-EPF-1 9 EMERGENCY PLAN FORM R7 PAGE 10 OF 14 PROCESS AND AREA MONITOR LOCATIONS SERVICE BUILDING FIRST FLOOR AND TURBINE BUILDING TRUCK DOCK LEVEL 2 z _. I I

D-z I

I I I I I

I E I I

FORT CALHOUN STATION FC-EPF-1 9 EMERGENCY PLAN FORM R7 PAGE 11 OF 14 PROCESS AND AREA MONITOR LOCATIONS SERVICE BUILDING SECOND FLOOR AND TURBINE BUILDING MEZZANINE LEVEL 1L1 I I- O zi

=rr El= c= =rrT RM-057: CONDENSER OFF-GAS MONITOR

FORT CALHOUN STATION FC-EPF-1 9 EMERGENCY PLAN FORM R7 PAGE 12 OF 14 PROCESS AND AREA MONITOR LOCATIONS SERVICE BUILDING THIRD FLOOR AND TURBINE BUILDING TURBINE DECK LEVEL w I.-

I.- o 0

3M K- z II lk I -r I I

r-E IE H

3 L

I r,-F-21 I I I I I RM-064: POST ACCIDENT MAIN STEAM MONITOR L

FORT CALHOUN STATION FC-EPF-1 9 EMERGENCY PLAN FORM R7 PAGE 13 OF 14 PROCESS AND AREA MONITOR LOCATIONS MAINTENANCE SHOP GROUND FLOOR i I N

TRUCK BAY of T h~~~~~

SHOP AREA U U

-i TOOL ROOM j-

m mIJ PROCESS AND AREA MONITOR LOCATIONS MAINTENANCE SHOP c

-<0 UPPER LEVEL (OSC) l_X_'

.~ ~~ - 0 0i I & C SHOP AREA ;CI N

CONFERENCE ROOMS nm

-4 M '.