MONTHYEARCNL-22-031, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-03-22022 March 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML19029A1542018-12-17017 December 2018 Permanently Defueled Emergency Action Level Technical Bases LIC-17-0041, Independent Spent Fuel Storage Installation - Revision to Emergency Plan Update2017-04-0707 April 2017 Independent Spent Fuel Storage Installation - Revision to Emergency Plan Update LIC-17-0002, Independent Spent Fuel Storage Installation - Submittal of Emergency Plan Update2017-02-14014 February 2017 Independent Spent Fuel Storage Installation - Submittal of Emergency Plan Update LIC-16-0091, Forward Emergency Plan Update2016-09-27027 September 2016 Forward Emergency Plan Update ML16243A1302016-08-17017 August 2016 Emergency Planning Changes LIC-16-0057, Emergency Planning Changes2016-07-15015 July 2016 Emergency Planning Changes LIC-16-0017, Submittal of Emergency Planning Implementing Procedure and Index. Includes Emergency Plan Implementing Procedure Change EPIP-TSC-2, Rev 182016-02-10010 February 2016 Submittal of Emergency Planning Implementing Procedure and Index. Includes Emergency Plan Implementing Procedure Change EPIP-TSC-2, Rev 18 LIC-16-0002, Transmittal of Emergency Planning Implementing Procedure and Index, Revision 49 to EPIP-EOF-6, Offsite Dose Assessment Using the Unified RASCAL Interface2016-01-0404 January 2016 Transmittal of Emergency Planning Implementing Procedure and Index, Revision 49 to EPIP-EOF-6, Offsite Dose Assessment Using the Unified RASCAL Interface LIC-15-0146, Emergency Planning Implementing Procedure and Index2015-12-21021 December 2015 Emergency Planning Implementing Procedure and Index LIC-15-0138, Transmittal of Emergency Planning Implementing Procedure and Index, Including Revision 49 to EPIP-EOF-6, Revision 63 to EPIP-OSC-2, and Revision 20 to RERP Section F2015-12-0404 December 2015 Transmittal of Emergency Planning Implementing Procedure and Index, Including Revision 49 to EPIP-EOF-6, Revision 63 to EPIP-OSC-2, and Revision 20 to RERP Section F LIC-14-0098, License Amendment Request 14-06 to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2014-12-26026 December 2014 License Amendment Request 14-06 to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors LIC-12-0156, OPPD Communications Assessment Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3, Emergency Preparedness, of the Near-Term Task Force Review of Insights2012-10-31031 October 2012 OPPD Communications Assessment Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3, Emergency Preparedness, of the Near-Term Task Force Review of Insights fro LIC-04-0060, Transmittal of Changes to Emergency Plan Implementing Procedures2004-04-29029 April 2004 Transmittal of Changes to Emergency Plan Implementing Procedures LIC-04-0048, Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP)2004-04-14014 April 2004 Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP) LIC-04-0041, Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP)2004-03-17017 March 2004 Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP) LIC-04-0037, Transmittal of Changes to Emergency Plan Implementing Procedures2004-03-15015 March 2004 Transmittal of Changes to Emergency Plan Implementing Procedures LIC-03-0155, Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP)2003-11-21021 November 2003 Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP) LIC-03-0151, Revision 15 to TSC-8, Core Damage Assessment and Revised EPIP Index Page 1 and 22003-11-0606 November 2003 Revision 15 to TSC-8, Core Damage Assessment and Revised EPIP Index Page 1 and 2 LIC-03-0128, Transmittal of Changes to Emergency Implementing Procedures (EPIP)2003-09-15015 September 2003 Transmittal of Changes to Emergency Implementing Procedures (EPIP) LIC-03-0125, Transmittal of Changes to Emergency Plan Implementing Procedures2003-09-0505 September 2003 Transmittal of Changes to Emergency Plan Implementing Procedures LIC-03-0115, Revision of Cover Letter to Previously Transmitted Changes to Emergency Plan Implementing Procedures (EPIP)2003-08-14014 August 2003 Revision of Cover Letter to Previously Transmitted Changes to Emergency Plan Implementing Procedures (EPIP) LIC-03-0111, Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP) for Fort Calhoun2003-08-0606 August 2003 Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP) for Fort Calhoun LIC-03-0102, Transmittal of Changes to Emergency Plan Implementing Procedures2003-07-25025 July 2003 Transmittal of Changes to Emergency Plan Implementing Procedures LIC-03-0098, Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP)2003-07-14014 July 2003 Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP) LIC-03-0096, Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP)2003-07-0909 July 2003 Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP) LIC-03-0087, Transmittal of Changes to Emergency Plan Implementing Procedures2003-06-13013 June 2003 Transmittal of Changes to Emergency Plan Implementing Procedures LIC-03-0082, Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP)2003-05-23023 May 2003 Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP) LIC-03-0065, Transmittal of Changes to Emergency Plan Implementing Procedures & to Emergency Planning Forms2003-04-28028 April 2003 Transmittal of Changes to Emergency Plan Implementing Procedures & to Emergency Planning Forms LIC-03-0058, Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP) and to Radiological Emergency Response Plan (RERP)2003-04-14014 April 2003 Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP) and to Radiological Emergency Response Plan (RERP) LIC-03-0041, Transmittal of Omaha Public Power District, Changes to Radiological Emergency Response Plan for Fort Calhoun2003-03-24024 March 2003 Transmittal of Omaha Public Power District, Changes to Radiological Emergency Response Plan for Fort Calhoun LIC-03-0015, Transmittal of Changes to Emergency Plan Implementing Procedure & Emergency Planning Forms2003-02-0606 February 2003 Transmittal of Changes to Emergency Plan Implementing Procedure & Emergency Planning Forms LIC-02-0149, Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP)2002-12-20020 December 2002 Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP) LIC-02-0135, Transmittal of Changes to Emergency Plan Implementing Procedure2002-11-21021 November 2002 Transmittal of Changes to Emergency Plan Implementing Procedure LIC-02-0126, Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP)2002-11-0404 November 2002 Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP) LIC-02-0112, Transmittal of Changes to Emergency Planning Forms (Epf) and Radiological Emergency Response Plan (RERP)2002-09-23023 September 2002 Transmittal of Changes to Emergency Planning Forms (Epf) and Radiological Emergency Response Plan (RERP) LIC-02-0086, Transmittal of Changes to Emergency Plan Implementing Procedures2002-07-30030 July 2002 Transmittal of Changes to Emergency Plan Implementing Procedures LIC-02-0068, Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP) and Emergency Planning Forms (Epf)2002-05-22022 May 2002 Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP) and Emergency Planning Forms (Epf) LIC-02-0069, Omaha Public Power District Transmittal of Changes to Emergency Plan Implementing Procedure (EPIP)2002-05-22022 May 2002 Omaha Public Power District Transmittal of Changes to Emergency Plan Implementing Procedure (EPIP) ML0207406432002-02-14014 February 2002 Radiological Emergency Response Plan LIC-02-0015, Transmittal of Fort Calhoun Revised Emergency Plan Implementing Procedures FC-EPF Index Page 1 of 2 Issued 01/15/2002, FC-EPF-14 R10 Issued 01/15/2002, EPIP Index Page 1 of 2 Issued 01/23/2002, EPIP-EOF-6 R32 Issued 01/23/20022002-02-0707 February 2002 Transmittal of Fort Calhoun Revised Emergency Plan Implementing Procedures FC-EPF Index Page 1 of 2 Issued 01/15/2002, FC-EPF-14 R10 Issued 01/15/2002, EPIP Index Page 1 of 2 Issued 01/23/2002, EPIP-EOF-6 R32 Issued 01/23/2002 2022-03-22
[Table view] Category:Letter type:LIC
MONTHYEARLIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0006, Annual 2021 Decommissioning Funding/Irradiated Fuel Management Status Report2021-09-0808 September 2021 Annual 2021 Decommissioning Funding/Irradiated Fuel Management Status Report LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ LIC-19-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-01-0303 January 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2024-06-18
[Table view] |
Text
- -
OmahaPbcPowerOmc 444 South 16th Street Mail Omaha NE 68102-2247 September 15, 2003 LIC-03-0128 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
Docket No. 50-285
SUBJECT:
Transmittal of Changes to Emergency Implementing Procedures (EPIP)
In accordance with 10 CFR 50.54(q), 10 CFR 50, Appendix E, Section V, and 10 CFR 50.4(b)(5), please find EPIP change packages enclosed for the Document Control Desk (holder of Copy 165) and the NRC Region IV Plant Support Branch Secretary (holder of Copies 154 and 155).
The document update instructions and summary of changes are included on the Confirmation of Transmittal form (Form EP-1) attached to each controlled copy change package. Please return the Confirmation of Transmittal forms by November 7, 2003.
The revised documents included in the enclosed package are:
EPIP Index page 2 of 3 issued 09/09/03 EPIP-RR-22 R23 issued 09/09/03 If you have any questions regarding the enclosed changes, please contact Mr. Carl Simmons at (402) 533-6430.
/incerelang S
/Nuclef Ope ttions
/RTRJUF Encl Sue c: NRC Region IV Plant Support Branch Secretary (2 sets)
Alan Wang, NRC Project Manager (w/o enclosures)
J. G. Kramer, NRC Senior Resident Inspector (w/o enclosures)
Emergency Planning Department (w/o enclosures)
Emhlovment with Faunai lnnrtnitv
-, -'wr~r-1 -11
FORM EP-l Rev. 6 (04/29/99)
OMAHA PUBLIC POWER DISTRICT Confirmation of Transmittal for Emergency Planning Documents/Information ri Radiological Emergency Respose Pan (RRP)
" Emergency Plan
`~~JImplementing Procedures ri Emergency Planning Fom(EF I~~J Resonse Pla (RERP)(EPIP) I~ om EF n Emergency Planning Department Manual (EPDM) 2 Other Emergency Planning Document(s)/
Information Transmitted to:
Name: Document Control Desk COLv No: 165 Date:
Division of Reactor Safety CODy No: 154 Attn: Senior Emergency Preparedness Inspector DMsIon of Reactor Safety - CODy No: 155 Attn: Senior Emergency Preparedness Inspector The following document(s) I Information are forwarded for your manual:
REMOVE SECTION INSERT SECTION EPIP Index page 2 of 3 Issued 0828/03 EPIP Index page 2 of 3 issued 09/09/03 EPIP-RR-22 R22 issued 50/15/03 EPIP-RR-22 R23 issued 09/09/03 Summary of Changes:
EPIP-RR-22 was revised to allow the Protective Measures Manager/Coordinator to sign dose assessment reports If all projections are below the actions required In EPIP-EOF-7 and/or no PAR changes is required or there has not been a significant change from the previous plume segment; thus reducing the number of interruptions that the Command and Control faces during the event.
$ Pupervisor- E rgency PlaMing A'R I hereby acknowledge receipt of the above documentsfinformatlon and have Included them In my assigned manuals.
Signature: Date _ _
Please sign above and return by to:j1/07/03 Beth Nagel Fort Calhoun Station, FC-241 Omaha Public Power District 444 South 16e Street Mall Omaha. NE 68102-2247 NOTE: If the document(s)/Information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another Individuals, please fill out the Information below.
[3 Document(s)/Information No Longer RequestedI/Needed o Document(syInformation Transferred to:
Name: Mailing Address:
I ---- -
Fort Calhoun Station Emergency Plan Implementing Procedure Index Page 2 of 3 EPIP Document Document Title Revision/Date EPIP-EOF-19 Recovery Actions R8 07-17-03 EPIP-EOF-21 Potassium Iodide Issuance R4 11-07-00 EPIP-EOF-23 Emergency Response Message System R5 10-12-99 EPIP-EOF-24 EOF Backup Alert Notification System Activation R3 09-09-99 EPIP-RR-1 1 Technical Support Center Director Actions R14 02-29-OOa EPIP-RR-13 Reactor Safety Coordinator Actions R14 12-09-99a EPIP-RR-17 TSC Security Coordinator Actions R15 12-1 0-02a EPIP-RR-17A TSC Administrative Logistics Coordinator Actions R20 11-07-02a EPIP-RR-19A Operations Liaison Actions R6 04-15-03a EPIP-RR-21 Operations Support Center Director Actions R13 08-28-03 EPIP-RR-21A Maintenance Coordinator Actions R4 11-30-99a EPIP-RR-22 Protective Measures Coordinator/Manager Actions R23 09-09-03 EPIP-RR-22A Chemistry Coordinator Actions R6 12-07-01 EPIP-RR-25 EOF Dose Assessment Coordinator Actions R21 05-15-03 EPIP-RR-28 OSC Accountability and Dosimetry Technician Actions R8 09-25-01a September 9, 2003 7:53:52am
WP10 Distribution Authorized This procedure does not contain any proprietary information, or such information has been censored. This issue may be released to the public document room. Proprietary Information In, vrlIae narannnal nmanae Fort Calhoun Station - company telephone numl bers, Unit No. 1 and any Information, whik:h could impede emergency respo nse.
EPIP-RR-22 EMERGENCY PLAN IMPLEMENTING PROCEDURE
Title:
PROTECTIVE MEASURES COORDINATOR / MANAGER ACTIONS FC-68 Number: EC 32651 Reason for Change: This change will allow the Protective Measures Manager/Coordinator to sign dose assessment reports if all projections are below the actions required in EPIP-EOF-7 and/or no PAR change is required or there has not been a significant change from the previous plume segment. Thus reducing the number of interruptions that the Command and Control faces during the event.
Requestor: M. Reller Preparer: M. Reller ISSUED: 09-09-03 3:00 pmr R23
FORT CALHOUN STATION EPIP-RR-22 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 1 OF 11 PROTECTIVE MEASURES COORDINATOR / MANAGER ACTIONS NON-SAFETY RELATED
- 1. PURPOSE 1.1 This procedure provides guidance to the Protective Measures Coordinator and the Protective Measures Manager for performing actions in response to an emergency at Fort Calhoun Station.
- 2. REFERENCES/COMMITMENT DOCUMENTS 2.1 EPIP-EOF-6, Dose Assessment 2.2 EPIP-EOF-7, Protective Action Guidelines 2.3 EPIP-EOF-21, Potassium Iodide Issuance 2.4 EPIP-EOF-1 1, Dosimetry Records, Exposure Extensions and Habitability 2.5 EPIP-TSC-1, Activation of the Technical Support Center 2.6 FC-EPF-6, Estimated Exposure Worksheet 2.7 CR 199500262 2.8 Commitment (Other than Ongoing)
- AR 13302, IER-92-20, Closed
- AR 11809, LIC-91-189R, Closed
- AR 13301, IER-92-20, Closed
- 3. DEFINITIONS None
- 4. PREREQUISITES None R23
FORT CALHOUN STATION EPIP-RR-22 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 2 OF 11
- 5. PROCEDURE NOTE: When needed, complete dose assessments and updates to the states at least every 60 minutes. It is the goal of the Fort Calhoun Station to attempt to provide assessments and updates at 15 minute intervals. (AR 13302) 5.1 The Protective Measures Coordinator will use Attachment 6.1 as an aid to completing required actions.
5.2 The Protective Measures Manager will use Attachment 6.2 as an aid to completing required actions.
5.3 Review the procedure and appropriate checklists, and accomplish the applicable steps both upon initial activation and periodically, as required, thereafter.
5.4 Retain all documentation (logs, calculation sheets, notes, etc.) generated or used during the emergency. At the termination, deliver all documentation to the Administrative Logistics Manager in the EOF, or the TSC Administrative Logistics Coordinator in the TSC.
- 6. ATTACHMENTS 6.1 Protective Measures Coordinator Checklist 6.2 Protective Measures Manager Checklist R23
FORT CALHOUN STATION EPIP-RR-22 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 3 OF 11 Attachment 6.1 - Protective Measures Coordinator Checklist Page 1 of 4 Maintain a log of all key activities V INIT/TIME NOTE: Actions taken may be performed out of sequence based on judgement of the user.
- 1. Upon arrival:
1.1 Obtain worker packet 1.2 Put on Personnel Identification badge 1.3 Assist in activation of the TSC per EPIP-TSC-1
- 2. Interface with:
2.1 Control Room Dose Assessment Specialist to determine Status of dose assessment.
2.2 OSC Radiation Protection Coordinator:
- to determine plant radiological conditions
- to coordinate response efforts 2.3 Field Teams to brief and assign duties.
- 3. Keep the Site Director/TSC Director informed on the status of:
3.1 In-plant response 3.2 Dose Assessment 3.3 Field Team response 3.4 Plant radiological conditions R23
FORT CALHOUN STATION EPIP-RR-22 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 4 OF 11 Attachment 6.1 Page 2 of 4 (continued)
/ INIT/TIME
- 4. Assess any planned or imminent releases for potential impact to the public.
NOTE: CHP Communicator may perform this task.
4.1 Prior to starting any release notify (use the CHP or commercial phone line):
- Iowa Emergency Management Division
- 5. If a release is in progress or suspected and the release path is not immediately known: [AR 11809]
5.1 Request an that assessment team (i.e., Operations, engineering, dose assessment personnel) be assigned by the Site Director or TSC Director.
5.2 Coordinate with the team to ensure they:
- Verify that a release is actually in progress
- Determine the source and release path of any release
- Report team findings to the appropriate position R23
FORT CALHOUN STATION EPIP-RR-22 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE S OF 11 Attachment 6.1 Page 3 of 4 (continued)
/ INIT/TIME NOTE: Although it is the Command and Control Position's duty to ensure that the Emergency Notification Forms (FC-1 188) are accurate, approved and issued per the requirements of EPIP-OSC-2, your position should assist in ensuring that these requirements are met.
- 6. If Command and Control is in the TSC update the states and counties as follows:
NOTE: If dose assessment is being performed in another facility and Command and Control is in the TSC, have the PAR Worksheet and Update Report for Offsite Authorities faxed to the TSC for approval.
6.1 Dose assessment is being performed:
6.1.1 Review the current PAR Worksheet form.
6.1.2 Assign PARs per EPIP-EOF-7.
6.1.3 Review the classification level and prognosis if:
- Dose projections are below all action levels as stipulated in EPIP-EOF-7
- The current dose assessment reflects no PAR change
- There are no significant changes from previous assessments You may approve and sign the Update Report to Offsite Authorities and the PAR's Worksheet. However, you must keep the Command and Control position updated on the Status of dose assessment on a timely basis.
6.1.4 If needed, forward to Site Director for approval.
6.1.5 Ensure that the Update Report for Offsite Authorities is faxed to the states.
6.1.6 As requested, if a classification and/or a PAR change is required assist in initiating Emergency Notification Form (FC-1188).
R23
FORT CALHOUN STATION EPIP-RR-22 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 6 OF 11 Attachment 6.1 Page 4 of 4 (continued)
/ INIT/TIME 6.2 If dose assessment is not being performed:
6.2.1 As requested, assist the Command and Control Position in completing an Emergency Notification Form (FC-1 188).
6.2.2 As requested, forward the approved Emergency Notification Form to the COP Communicator for state/county updates.
- 7. Ensure the COP Communicator properly updates the Radiological Status Board. (AR 13301)
NOTE: Do not activate the Health Physics Network (HPN) until requested to do so by the NRC.
NOTE: You or a designee may be required to assist the CHP Communicator.
- 8. Ensure that the CHP Communicator is providing radiological information to:
8.1 The states using the Conference Health Physics (CHP) network or commercial line as a backup.
8.2 The NRC using the Health Physics Network (HPN) or commercial line as a backup.
- 9. If required, coordinate the protective measures process for in-plant teams and Field Teams use:
- EPIP-EOF-1 1, Dosimetry Issuance, Extensions and Habitability
- 10. As required, provide a detailed briefing to your relief covering:
- Actions taken (current status)
R23
FORT CALHOUN STATION EPIP-RR-22 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 70F 11 Attachment 6.2 - Protective Measures Manager Checklist Page 1 of 5 Maintain a log of all key activities INIT/TIME NOTE: Actions taken may be performed out of sequence based on judgement of the user.
- 1. Upon arrival:
1.1 Sign in on Security Roster 1.2 Put on Personnel Identification badge _ I~~~
- 2. Interface with:
2.1 The EOF Dose Assessment Coordinator or the TSC Protective Measures Coordinator to determine:
- Status of dose assessment
- Status of and actions taken by Field Teams 2.2 The TSC Protective Measures Coordinator to determine:
- Onsite radiological conditions
- 3. Report your findings from Step 2 to the Emergency Director.
NOTE: The MRC Technical Liaison need not report to the EOF if MRC is being activated and may be briefed by telephone.
- 4. Brief the Site Representative and MRC Technical Liaison on the following:
- PAR's given to the states 4.1 Instruct the Site Representative to obtain his worker package.
4.2 If conditions warrant, dispatch the Site Representative to the Iowa State EOC.
R23
FORT CALHOUN STATION EPIP-RR-22 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 8 OF 11 Attachment 6.2 Page 2 of 5 (continued)
/ INIT/TIME 4.3 If the MRC is being activated, dispatch the MRC Technical Liaison.
- 5. Assess any planned or imminent releases for potential impact to the public.
NOTE: If representatives of the following agencies are in the EOF you or a designee may talk to them directly.
NOTE: CHP Communicator may perform this task.
5.1 Prior to starting any release notify (use the CHP or commercial phone line):
0 Nebraska Emergency Management Agency Nebraska Department of Health R&L 0 Iowa Emergency Management Division Iowa Department of Public Health
- 6. Upon concurrence of Emergency Director and the Dose Assessment staff initiate actions to transfer dose assessment to the EOF. l R23
FORT CALHOUN STATION EPIP-RR-22 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 9 OF 11 Attachment 6.2 Page 3 of 5 (continued)
/ INIT/TIME NOTE: Although it is the Command and Control Position's duty to ensure that the Emergency Notification Forms (FC-1 188) are accurate, approved and issued per the requirements of EPIP-OSC-2, your position should assist in ensuring that these requirements are met.
- 7. If Command and Control is in the EOF update the states and counties as follows:
NOTE: If dose assessment is being performed in another facility and Command and Control is in the EOF, have the PAR Worksheet and Update Report for Offsite Authorities faxed to the EOF for approval.
7.1 If dose assessment is being performed:
7.1.1 Review the current PAR Worksheet form.
7.1.2 Assign PARs per EPIP-EOF-7.
7.1.3 Review the classification level and prognosis if:
- Dose projections are below all action levels as stipulated in EPIP-EOF-7
- The current dose assessment reflects no PAR change
- There are no significant changes from previous assessments You may approve and sign the Update Report to Offsite Authorities and the PAR's Worksheet. However, you must keep the Command and Control position updated on the Status of dose assessment on a timely basis.
7.1.4 If needed, forward to Command and Control position for approval.
7.1.5 Ensure that the Update Report for Offsite Authorities is faxed to the states.
7.1.6 As requested, if a classification and/or a PAR change is required assist in initiating Emergency Notification Form (FC-1188).
R23
FORT CALHOUN STATION EPIP-RR-22 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 10 OF 11 Attachment 6.2 Page 4 of 5 (continued)
/ INIT/TIME 7.2 If dose assessment is not being performed:
7.2.1 As requested, assist the Command and Control Position in completing an Emergency Notification Form (FC-1188).
7.2.2 As requested, forward the approved Emergency Notification Form to the COP Communicator for state/county updates.
- 8. Ensure the COP Communicator properly updates the PAR Status Board. [AR 133011 l NOTE: Do not activate the Health Physics Network (HPN) until requested to do so by the NRC.
NOTE: You or a designee may be required to assist the CHP Communicator.
- 9. Ensure that the CHP Communicator is providing radiological information to:
9.1 The states using the Conference Health Physics (CHP) network or commercial line as a backup.
9.2 The NRC using the Health Physics Network (HPN) or commercial line as a backup. l
- 10. If required, coordinate guidance for the protective measures process use:
- EPIP-EOF-1 1, Dosimetry Issuance, Extensions and Habitability
- 11. Provide periodic updates on radiological conditions to:
0 Emergency Director EOF Staff 0 State Representatives (at the EOF)
R23
FORT CALHOUN STATION EPIP-RR-22 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 11 OF 11 Attachment 6.2 Page 5 of 5 (continued)
INIT/TIME
- 12. If the states request, call in OPPD environmental personnel.
- 13. If the plant is evacuated, coordinate the arrival of evacuees with the EOF Administrative Logistics Manager. /
13.1 If required, evaluate the evacuated site population exposure using FC-EPF-6.
- 14. As required, provide detailed briefing to your relief covering:
l
- Actions taken (current status)
R23