LIC-02-0135, Transmittal of Changes to Emergency Plan Implementing Procedure
| ML023370532 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 11/21/2002 |
| From: | Ridenoure R Omaha Public Power District |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LIC-02-0135 | |
| Download: ML023370532 (34) | |
Text
UHIlINE Omaha Public Power District 444 South 16th Street Mall Omaha NE 68102-2247 November 21, 2002 LIC-02-0135 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
Docket No. 50-285
SUBJECT:
Transmittal of Changes to Emergency Plan Implementing Procedures (EPIP)
In accordance with 10 CFR 50.54(q), 10 CFR 50, Appendix E, Section V, and 10 CFR 50.4(b)(5), please find EPIP change packages enclosed for the Document Control Desk (holder of Copy 165) and the NRC Region IV Plant Support Branch Secretary (holder of Copies 154 and 155).
The document update instructions and summary of changes are included on the Confirmation of Transmittal form (Form EP-1) attached to each controlled copy change package.
Please return the Confirmation of Transmittal forms by January 7, 2003.
The revised documents included in the enclosed package are:
EPIP Index pg 2 & 3 issued 11/07/02 EPIP-RR-17A R20 issued 11/07/02 EPIP-RR-29 R20 issued 11/07/02 EPIP Index pg 1 issued 11/12/02 EPIP-EOF-3 R18 issued 11/12/02 If you have any questions regarding the enclosed changes, please contact Mr. Carl Simmons at (402) 533 6430.
Sincerely, Enclosures c:
NRC Region IV Plant Support Branch Secretary (2 sets)
Alan Wang, NRC Project Manager (w/o enclosures)
J. G. Kramer, NRC Senior Resident Inspector (w/o enclosures)
Winston & Strawn (w/o enclosures)
Emergency Planning Department (w/o enclosures)
~ACM Employment with Equal Opportunity 4171
FORM EP-1 Rev. 6 (04/29/99)
OMAHA PUBLIC POWER DISTRICT Confirmation of Transmittal for Emergency Planning Documents/information Radiological Emergency Emergency Plan Emergency Planning Response Plan (RERP)
Implementing Procedures Forms (EPF)
(EPIP)
D Emergency Planning Department Manual D
Other Emergency Planning Document(s)/
(EPDM)
Information Transmitted to:
Name:
Document Control Desk Copy No: 165 Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 Date:
The following document(s) I information are forwarded for your manual:
REMOVE SECTION INSERT SECTION EPIP Index pg 2 & 3 issued 07/09/02 EPIP Index pg 2 & 3 issued 11/07/02 EPIP-RR-17A R19 issued 07/23/01 EPIP RR-17A R20 issued 11/07/02 EPIP-RR 29 R19 issued 03/13/01 EPIP-RR 29 R20 issued 11/07/02 EPIP Index pg 1 issued 10/29/02 EPIP Index pg 1 issued 11/12/02 EPIP-EOF-3 R17 issued 12/07/01 EPIP-EOF-3 R18 issued 11/12/02 Summary of Changes:
EPIP-RR-17A R20 adds instructions for TSC Admin Logistics Coordinator to interface with the EOF Admin Logistics Manager to determine what special needs may be needed and to ensure that it is understood who performs these tasks. EPIP-RR-29 R20 changes instructions on ordering food and arranging transportation and lodging; also ensures that the EOF Logistics Manager understands that this is his duty, with assistance as needed from the TSC Logistics Coordinator. EPIP-EOF-3 R18 was rewritten to provide an easier format to follow.
Supervisor - Emergency Planning I hereby acknowledge receipt of the above documentslinformation and have included them in my assigned manuals.
Signature:
Date:
Please sign above and return by 01/07/03 to:
Beth Nagel Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 1 6 th Street Mall Omaha. NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below.
[1 Document(s)/Information No Longer Requested/Needed E] Document(s)/Information Transferred to:
Name:
Mailing Address:
Fort Calhoun Station Emergency Plan Implementing Procedure Index EPIP Document Document Title Revision/Date EPIP-EOF-19 Recovery Actions R7 09-30-98 EPIP-EOF-21 Potassium Iodide Issuance R4 11-07-00 EPIP-EOF-23 Emergency Response Message System R5 10-12-99 EPIP-EOF-24 EOF Backup Alert Notification System Activation R3 09-09-99 EPIP-RR-11 Technical Support Center Director Actions R14 02-29-00 EPIP-RR-1 3 Reactor Safety Coordinator Actions R14 12-09-99 EPIP-RR-17 TSC Security Coordinator Actions R14 04-04-01 EPIP-RR-17A TSC Administrative Logistics Coordinator Actions R20 11-07-02 EPIP-RR-19A Operations Liaison Actions R5 10-07-99 EPIP-RR-21 Operations Support Center Director Actions R12 09-23-99 EPIP-RR-21A Maintenance Coordinator Actions R4 11-30-99 EPIP-RR-22 Protective Measures Coordinator/Manager Actions R21 07-02-01 EPIP-RR-22A Chemistry Coordinator Actions R6 12-07-01 EPIP-RR-25 EOF Dose Assessment Coordinator Actions R20 11-15-01 EPIP-RR-28 OSC Accountability and Dosimetry Technician Actions R8 09-25-01 November 7, 2002 9:10:28am Page 2 of 3
Fort Calhoun Station Page 3 of 3 Emergency Plan Implementing Procedure Index EPIP Document Document Title Revision/Date EPIP-RR-29 EOF Administrative Logistics Manager Actions R20 11-07-02 EPIP-RR-39 Control Room Medical Responder Actions RO 03-27-01 EPIP-RR-63 EOF Dose Assessment Assistant Actions R10 11-19-01 EPIP-RR-66 Communication Specialist Actions R8 08-31-99 EPIP-RR-72 Field Team Specialist Actions R13 07-09-02 EPIP-RR-87 Radiation Protection Coordinator Actions R7 08-24-00 EPIP-RR-90 EOF/TSC CHP Communication Actions RO 10-24-00 j
November 7, 2002 9:10:28am
Distribution Authorized This procedure does not contain any proprietary information, or such information has been censored. This issue may be released to the public document room. Proprietary information includes personnel names, company telephone numbers, and any information, which could impede emergency response.
WP8 Fort Calhoun Station Unit No. 1 EPIP-RR-17A EMERGENCY PLAN IMPLEMENTING PROCEDURE
Title:
TSC ADMINISTRATIVE LOGISTICS COORDINATOR ACTIONS FC-68 Number:
EC 29517 Reason for Change:
Add instructions for TSC Admin Logistics Coordinator to interface with the EOF Admin Logistics Manager to determine what special needs may be needed. To ensure that it is understood who performs these tasks.
Requestor:
Preparer:
Mark Reller Mark Reller ISSUED: 11-07-02 3:00 pm R20
FORT CALHOUN STATION EPIP-RR-17A EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 1 OF 6 TSC ADMINISTRATIVE LOGISTICS COORDINATOR ACTIONS
- 1. PURPOSE 1.1 This procedure provides guidance to the TSC Administrative Logistics Coordinator in performing actions outlined in the Emergency Plan Implementing Procedures (EPIPs).
- 2. REFERENCES/COMMITMENT DOCUMENTS 2.1 Commitment Documents
- 3. DEFINITIONS None
- 4. PREREQUISITES None
- 5. PROCEDURE 5.1 Review the procedure and checklist, Attachment 6.1 and accomplish the applicable steps both upon initial activation and periodically, as required, thereafter.
5.2 At the completion of the shift or at event termination, check the steps which are completed.
5.3 Retain all documentation (logs. calculation sheets, notes, etc) generated or used during the emergency 5.4 At event termination, collect all documentation from the TSC, OSC and CR.
5.4.1 Assemble all documentation for legal records and event analysis. Request the Emergency Planning Department to place in safe storage.
- 6. ATTACHMENTS 6.1 TSC Administrative Logistics Coordinator Checklist 6.2 Procurement or Addition of Diesel Fuel for Emergency Diesel Generators R20
FORT CALHOUN STATION EPIP-RR-17A EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 2 OF 6.1 - TSC Administrative Logistics Coordinator Checklist Page 1 of 4
- Maintain a log of all key activities *
- INIT/TIME
- 1. Upon arrival:
Sign in on the Accountability Roster Obtain worker packet Put on the Personnel Identification badge Assist in activation of TSC per EPIP-TSC-1
- 2.
Direct:
2.1 Site Director's Secretary to:
"* Maintain a log for the Site Director
"* Gather information for input to the ERMS.
2.2 Other Site Directors Secretary to operate the ERMS.
2.3 The COP Communicator to:
"* Perform required notifications on the COP Network
"* Maintain the Radiological Status Board [AR 13301]
2.4 The Status Board Keeper to obtain data from the ERFCS or Control Room to maintain the Status Board.
2.5 The Emergency Response Coordinator to assist other TSC positions.
2.6 Direct one Administrative Assistant to maintain the TSC Accountability Roster.
2.7 Direct the other Administrative Assistant to:
"* Perform copying duties in the TSC
"* Distribution duties in the TSC
"* Operate the fax machine I
I R20
FORT CALHOUN STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-RR-17A PAGE 3 OF 6 Page 2 of 4.1 (continued)
INIT/TIME
- 3. Secure access/egress to the TSC from the back (west) entrance using the following signs:
TSC IS ACTIVATED NO EXIT TSC IS ACTIVATED AUTHORIZED PERSONNEL ONLY WHEN TSC IS ACTIVATED DO NOT ENTER. USE EAST ENTRANCE TSC IS ACTIVATED
- 4. Establish 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> staffing:
4.1 Determine 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Staffing for:
0 0
0
/
TSC (assist the Site Director using FC-EPF10),
Control Room (use FC-EPF-10)
OSC (request that OSC Director prepare using FC-EPF-9 and fax to you) 4.2 When you have all the staffing schedules:
0 S
0 S
0 Verify that all positions are filled.....
Verify that second shift positions are filled Post shift schedules in the TSC Fax shift schedules to the CR-and OSC for posting Distribute shift schedules in the TSC 4.3 Notify personnel on the second shift to inform them of their work schedule (use other personnel to assist in this task as needed)
- 5. Periodically review the following steps and perform them as required:
5.1 Prepare copies of the following and distribute them throughout the TSC and transmit to the OSC, as required.
0 0
/
Data sheets Messages 5.2 Assist the Site and TSC Director, as needed.
R20
FORT CALHOUN STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE.1 (continued)
GL/
EPIP-RR-17A PAGE 4 OF 6 Page 3 of 4 INITITIME 5.3 Contact the EOF Administrative Logistics Manager's when:
"* Evacuation of plant personnel to the North Omaha is ordered
"* Any person is injured, contaminated and requires off-site medical response 5.4 Working with the EOF Administrative Logistics Manager coordinate logistics support, including:
Transportation Food Lodging Special equipment Supplies NOTE: Step 6 may be performed by the EOF Administrative Logistics Manager.
- 6. Determine from the Control Room Coordinator the status of the emergency diesel generators.
6.1 If one or both are operating, within 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> [AR 12110]:
NOTE: The phone number for the diesel fuel supplier can be found in the Emergency Phone Book in the "Off-Site Support Agencies" section.
Contact the diesel fuel supplier to arrange for the potential delivery of diesel fuel.
"* If Diesels are loaded arrange for continuous fuel deliveries to the site.
6.2 If diesel fuel can not be delivered to the site within 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> of the start of the diesels:
e Request that the TSC or Site Director request an emergency work order to install the hardware for diesel fuel transfer described in Attachment 6.2.
I S
S S
0 R20
FORT CALHOUN STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE.1 (continued)
(LIJ EPIP-RR-17A PAGE 5 OF 6 Page 4 of 4 INIT/TIME
- 7. As required, provide a detailed briefing to your relief covering:
Emergency conditions Actions taken (current status)
- 8. At emergency termination:
Collect documentation and logs from all onsite facilities Ensure that the TSC is placed back into a state of readiness Review this checklist and ensure that special orders or supplies that were ordered are canceled Ensure personnel on the shift roster are informed of status of emergency and whether or not to report for their shift S
S I
I R20
FORT CALHOUN STATION EPIP-RR-1 7A EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 6 OF 6.2 - Procurement or Addition of Diesel Fuel for Emergency Diesel Generators INITIALS
- 1. DIESEL FUEL TRANSFER FROM FO-1 0 TO FO-1 (Auxiliary Boiler Fuel Storage Tank to Diesel Generator Fuel Oil Storage Tank)
NOTE: At full rated power, each diesel generator consumes approximately 3 gallons per minute. FO-37 delivers approximately 6 gallons per minute. If only one diesel is in service, or if the diesels are running at less than rated load, the level in FO-1 will steadily increase when adding fuel oil to FO-1 from FO-10.
There are several possible methods to transfer diesel fuel from FO-1 0 to FO-1.
This method allows using installed equipment that will require a minimum amount of "temporary" changes to accomplish the fuel transfer:
1.1 Connect a 1 inch hose from FO-201 "Auxiliary Feedwater Pump FW-54 Fuel Oil Transfer Pump FO-37 Discharge Drain Valve" to the 3 inch fill connection on FO-1. This will require approximately 400 feet of hose. The 1 inch hose may be run inside the 3 inch fill connection and duct taped in place. All mechanical joints should be stabilized with lock wires and taped to prevent leakage. Sleeves or blocks should be used around hoses that are run through doors to prevent damage to the hose. (Hose fittings and a hand pump are available in the warehouse stored under Stock Code Number 30869-2(fuel)).
1.2 The normal Auxiliary Feedwater Pump fuel oil system lineup in OI-AFW-1 can be used, but HC-FO-37 must be placed in the "Hand" position, or it will automatically shut off when the Fuel Oil Day Tank FO-38 is full. Also, FO-196 must be closed or fuel will recirculate through FO-38 back to FO-10 if that is the path of least resistance.
FO-38 should be checked and refilled periodically; it contains an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> supply of fuel oil when full.
1.3 Continue to monitor LI-2107 and shut off the transfer pump when FO-1 level is approximately 17,500 gallons.
1.4 Upon completion of the fuel transfer evolution, drain and store hose properly to prevent possible fuel jelling in the hose.
R20
Distribution Authorized This procedure does not contain any proprietary information, or such information has been censored. This issue may be released to the public document room. Proprietary information includes personnel names, company telephone numbers, and any information, which could impede emergency response.
WP8 Fort Calhoun Station Unit No. 1 EPIP-RR-29 EMERGENCY PLAN IMPLEMENTING PROCEDURE
Title:
EOF ADMINISTRATIVE LOGISTICS MANAGER ACTIONS FC-68 Number:
Reason for Change:
Requestor:
Preparer:
EC 29518 Change instructions on ordering food and supplies and arranging transportation and lodging. To ensure that the EOF Logistics Manager understands that this is his duty, with assistance as needed from the TSC Logistics Coordinator.
Mark Relier Mark Reller ISSUED: 11-07-02 3:00 pmR R20
FORT CALHOUN STATION EPIP-RR-29 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 1 OF 7 EOF ADMINISTRATIVE LOGISTICS MANAGER ACTIONS NON-SAFETY RELATED
- 1. PURPOSE 1.1 The purpose of this procedure is to provide guidance to the EOF Administrative Logistics Manager in performing actions outlined in the Emergency Plan Implementing Procedures (EPIPs).
- 2. REFERENCES/COMMITMENT DOCUMENTS 2.1 EPIP-EOF-1, Activation of the Emergency Operations Facility 2.2 EPIP-EOF-21, Potassium Iodide Issuance 2.3 EPIP-EOF-24, EOF Backup Alert Notification System Activation 2.4 ANI Underwriter's Manual 2.5 Emergency Telephone Book
- 3.
DEFINITIONS NONE
- 4. PREREQUISITES NONE
- 5. PROCEDURE 5.1 Use the EOF Administrative Logistics Manager Checklist, Attachment 6.1, as an aid to completing required actions.
NOTE: The attached checklist is designed as a reminder of actions which are required to be performed during an emergency condition.
5.2 Review the procedure and checklist, and accomplish the applicable steps both upon initial activation and periodically, as required, thereafter.
5.3 At the completion of the shift or at event termination, initial the steps which are completed.
R20
FORT CALHOUN STATION EPIP-RR-29 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 2 OF 7 5.4 Retain all documentation (logs, calculation sheets, notes, etc.) generated or used during the emergency. At the termination, every position in the EOF will deliver documentation to you. Assemble all documentation for legal records and event analysis. Request the Emergency Planning Department to place in safe storage.
- 6. ATTACHMENTS 6.1 EOF Administrative Logistics Manager Checklist 6.2 Westinghouse Electric Emergency Information Sheet 6.3 INPO Event Notification R20
FORT CALHOUN STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE.1 - EOF Administrative Logistics Manager Checklist EPIP-RR-29 PAGE 3 OF 7 Page 1 of 3
- Maintain a log of all key activities * *
- 1. Obtain and put on your Personnel Identification Badge.
- 2. Contact Security at Energy Plaza to ensure security for the EOF and/or MRC have been dispatched and that 24-hour coverage is established.
(See Emergency Telephone Book)
Maintain security at the EOF either personally, or via a designee, until such time as formal security is in place.
/
I
/
/
/
/
/
- 4. Lock the Northwest Hallway Door to prevent personnel from entering.
Personnel should use the Southwest hallway.
- 5. Place magnetic signs on the outside of the East doors to the EOF and manually lock the East doors. (Signs are located on door of the Copy Machine Room.)
- 6. Retrieve Interactive Notification System (INS) Reports from your e-mail.
Determine status of positions at the EOF to ensure it is staffed according to EPIP-EOF-1.
- 7. Commence activation of the EOF using EPIP-EOF-1.
- 8. Working with the TSC Admin Logistics Coordinator determine needs, order and arrange for delivery of support items including:
S S
S S
S Transportation Food Lodging Special Equipment Supplies
- 9. When formal security arrives at the EOF, they should be issued Security Guard - EOF - West Entrance Booklet #58. This booklet is located at the Administrative Logistics Manager's Workstation. Oversee the security operations at the EOF.
/
/
R20 3.
Lý INIT/TIME
FORT CALHOUN STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE.1 - EOF Administrative Logistics Manager Checklist NOTE: At declaration of Site Area Emergency, monitor the Alert Notification System Controller to identify any siren that failed.
- 10. Prepare the Alert Notification System Controller to monitor siren system activation using EPIP-EOF-24.
10.1 If activated and any siren fails to sound, then notify the sheriff of the affected county as to which siren did not sound, so that notification of the public in that area can be made using other methods.
10.2 If requested by the states or counties, activate the sirens per EPIP-EOF-24.
10.3 Notify the Emergency Director, EOF Information Specialist, Iowa Emergency Management EOF Liaison and Nebraska Assistant to Governor Authorize Representative (GAR) of any siren activations or malfunctions.
- 11. Determine 24-hour staffing for all EOF positions (use EPF-1 1, as necessary).
- 12. When all shift rotation schedules have been submitted, direct the preparation of an EOF shift schedule and roster for posting and distribution. (Use EPF-1 1, as necessary).
- 13. Contact scheduled personnel to inform them of the shift schedules, using other personnel to assist. as necessary
- 14. At Site Area Emergency and General Emergency, make notifications SAE to the following support groups 14.1 American Nuclear Insurers (see Emergency Phonebook) 14.2 Fill out Attachment 6.2, Westinghouse Electric Emergency Information Sheet; 14.2.1 Have Emergency Director determine the level of Westinghouse Electric response desired; EPIP-RR-29 PAGE 4 OF 7 Page 2 of 3 I
I I
I GE R20
(,,)
INIT/TIME
FORT CALHOUN STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE.1 - EOF Administrative Logistics Manager Checklist EPIP-RR-29 PAGE 5 OF 7 Page 3 of 3 14.2.2 Relay the information on Attachment 6.2 by calling the Westinghouse Electric Emergency Response Center.
14.3 Nuclear Regulatory Commission Region IV 14.4 Nuclear Electric Insurance Limited (NEIL) (see Emergency phone book) 14.5 Federal Emergency Management Agency 14.6 Institute of Nuclear Power Operations (using Attachment 6.3, INPO Event Notification) 14.7 Metropolitan Utilities District 14.8 Notify Union Pacific that a radiological emergency has occurred at the Fort Calhoun Station which may require stopping all railway traffic through the 10-mile EPZ (see the Emergency Telephone Book).
/
14.9 OPPD Insurance and Claims Department (See the Emergency Telephone Book).
- 15. Provide a detailed briefing to your shift relief of any actions taken and the current emergency status.
- 16. Assist in development and arranging Emergency Director staff briefings.
Briefings should be held at maximum of 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> intervals. Attendees should include state and federal officials along with appropriate OPPD Emergency Response Organization members.
- 17. As needed, contact OPPD support groups/individuals for assistance (see Emergency Phone Book).
- 18. Notify the Radiation Health Center at University Hospital NHS (see Emergency Phone Book) of any OPPD employees that were administered potassium iodide (KI) per EPIP-EOF-21. Inform them that the individual(s) will be asked to report to the Radiation Health Center for follow-up examinations.
I
/
I I
I R20 W
INITFFIME
FORT CALHOUN STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-RR-29 PAGE 6 OF 7.2 - Westinghouse Electric Emergency Information Sheet
- 1. Date:
Time:
- 2. Name and title:
- 3. Omaha Public Power District, Fort Calhoun Nuclear Station, Fort Calhoun, Nebraska
- 4. Call Back Numbers (2):
or
- 5. This call is for a: (circle one)
REAL EMERGENCY or DRILL
- 6. What is the EMERGENCY CLASSIFICATION? (circle one)
Site Area Emergency General Emergency
- 7. What is the desired Westinghouse Electric Response, as specified by the Emergency Director (circle one):
7.1 STANDBY No Westinghouse Electric action authorized other than to standby for, furtherinformation as it becomes available.
7.2 ALERT Westinghouse Electric is to inform its Emergency Response Organization (ERO), but no further action beyond the notification is authorized.
7.3 CENTER Westinghouse Electric is to inform its ERO and assemble their ACTIVATION Emergency Response Team at the Westinghouse Electric Emergency Response Center (ERC). Further action would be specified by OPPD.
7.4 FULL Westinghouse Electric to activate its ERC and bring other available
RESPONSE
system resources up to full alert. Further action would normally be specified by the utility, but Westinghouse Electric would be authorized to take prudent, independent action where timely utility approval could not be obtained.
- 8.
Describe event briefly, with dates and times:
R20 Alert
FORT CALHOUN STATION EPIP-RR-29 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 7 OF 7.3 - INPO Event Notification
- 1. Notification status (check one):
- a.
Actual Event
[ ]
- b.
Drill or Exercise
[ I
- 2. Omaha Public Power District, Fort Calhoun Station, Unit 1, Fort Calhoun, Nebraska
- 3. Caller's Name:
Phone No.:
Calling From:
Control Room (Simulator) _
-Other
- 4. Utility's Sr Mgr in Charge of Emergency:
Phone No.:
Located in:
Control Room (Simulator)
- 5. Event Classification (check one):
I Date Declared Time Declared
[Plant Time Zone 6.
- a.
Unusual Event
[ ]
- b.
Alert
[ ]
- c.
Site Area Emergency
[ ]
- d.
General Emergency
[ ]
- e.
Terminated
[ ]
Reason for Event Declaration:
- 7.
INPO Assistance Requested?
(yes/no)
Type
[ ] Facilitating technical information flow to the nuclear industry by maintaining NUCLEAR NETWORK
[ ] Locating replacement equipment and industry personnel with special technical expertise
[ Providing technical information and industry experience with similar plant systems and components Dispatching an INPO Liaison to the affected plant/utility to facilitate utility interface with INPO and its industry resources
[ Other:
When Needed:
Where Needed:
Utility Contact Requesting Assistance:
Utility Contact Phone Number:
R20
Fort Calhoun Station Page 1 of 3 Emergency Plan Implementing Procedure Index EPIP Document Document Title Revision/Date EPIP-OSC-1 Emergency Classification R35 05-02-02 EPIP-OSC-2 Command and Control Position Actions/Notifications R40 02-04-02 EPIP-OSC-9 Emergency Team Briefings R7 12-09-99 EPIP-OSC-15 Communicator Actions R22 10-24-00 EPIP-OSC-21 Activation of the Operations Support Center R12 10-29-02 EPIP-TSC-1 Activation of the Technical Support Center R23 10-29-02 EPIP-TSC-2 Catastrophic Flooding Preparations R2 02-06-96 (RO 03-22-95) DELETED (05-09-95)
REINSTATED EPIP-TSC-8 Core Damage Assessment R14 01-19-01 EPIP-EOF-1 Activation of the Emergency Operations Facility R13 10-29-02 EPIP-EOF-3 Offsite Monitoring R18 11-12-02 EPIP-EOF-6 Dose Assessment R32 01-23-02 EPIP-EOF-7 Protective Action Guidelines R13 10-31-00b EPIP-EOF-10 Warehouse Personnel Decontamination Station RIO 01-13-00a Operation EPIP-EOF-11 Dosimetry Records, Exposure Extensions and R18 09-18-97b Habitability November 12, 2002 8:37:25am
Distribution Authorized This procedure does not contain any proprietary information, or such information has been censored. This issue may be released to the public document room. Proprietary information includes personnel names, company telephone numbers, and any information, which could impede emergency response.
WP8 Fort Calhoun Station Unit No. 1 EPIP-EOF-3 EMERGENCY PLAN IMPLEMENTING PROCEDURE
Title:
OFFSITE MONITORING FC-68 Number:
Reason for Change:
Requestor:
Preparer:
EC 28896 Rewrite to update and provide easier format to follow.
Mark Reller Mark Reller ISSUED: 11-12-02 3:00 pm R18
FORT CALHOUN STATION EPIP-EOF-3 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 1 OF 10 OFFSITE MONITORING NON-SAFETY RELATED
- 1. PURPOSE 1.1 This procedure provides guidance to field teams on performing offsite radiological monitoring.
- 2. REFERENCES/COMMITMENT DOCUMENTS 2.1 Ongoing Commitments 9 AR 30448 2.2 RP-418, Operation of the Eberline ESP-2 Digital Meter 2.3 RP-420, Operation of Ludlum and Eberline Count Ratemeters Using External Pancake GM Probes 2.4 RP-439, Operation of the Dose Rate Meter 2.5 RP-434, Operation of the Radeco Model H-810 Air Totalizer 2.6 RP-203, Air Sample Collection and Analysis 2.7 FC-EPF-2, Offsite Monitoring Log 2.8 FC-EPF-8, Sample Worksheet
- 3. DEFINITIONS None
- 4. PREREQUISITES None
- 5. PROCEDURE 5.1 The TSC Field Team Technician will use Attachment 6.1 when preparing for departure.
5.2 The TSC Field Team Technician will use Attachment 6.2 when performing a plume search.
R18
FORT CALHOUN STATION EPIP-EOF-3 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 2 OF 10 5.3 The TSC Field Team Technician will use Attachment 6.3 for performing surveys.
5.4 The TSC Field Team Technician will use Attachment 6.4 for counting samples.
5.5 The TSC Field Team Technician will use Attachment 6.5 for follow-up actions.
- 6. ATTACHMENTS 6.1 Preparing for Departure 6.2 Plume Search 6.3 Performing Surveys 6.4 Counting Samples 6.5 Follow-up Actions R18
FORT CALHOUN STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE.1 - Preparing for Departure EPIP-EOF-3 PAGE 3 OF 10 W)
INITIALS
- 1. Upon for:
arrival at the TSC report to the TSC Protective Measures coordinator R18 1.1 A briefing of current conditions:
Emergency Classification Level Initiating conditions Prognosis 1.2 A briefing on weather data:
Wind Speed o
Wind direction e
Stability class Affected sectors 1.3 Dose Assessments (if being performed)
"* PARs
"* Action taken by states 1.4 Special precautions or strategy to be used in field.
1.5 Field team assignments
- 2. Proceed to the Security Building Emergency Gear locker and obtain:
Vehicle keys Survey and monitoring instruments Potassium Iodide tablets (3 bottles)
Self reading dosimeters
- 3. Verify radio operability:
NOTE: Push the talk button to talk, release the button to listen.
Turn on radio Select desired sub-fleet number (normally SF4)
Contact EOF (TSC as backup) for a radio check
FORT CALHOUN STATION EPIP-EOF-3 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 4 OF 10.1 - Preparing for Departure
(_§ INITIALS
- 4. Record the following information on the FC-EPF-2 form:
Field Team color (red or blue)
Serial numbers of survey instruments Calibration due dates of survey instruments Names of Field Team members Initial readings of Field Team members dosimetry
- 5. Prior to departure receive instructions from the EOF Field Team Specialist on:
Current plant conditions Projected plume pathway Targeted sample location Preferred route to sample location Personal protective actions required (use ALARA principals) 6, When directed proceed to the sample location using the Monitor Book Map for directions.
R18
FORT CALHOUN STATION EPIP-EOF-3 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 5 OF 10.2 - Plume Search NOTE: Ensure dose rate instrument is kept in the on position on the lowest possible scale.
NOTE: Always follow ALARA principles when performing your duties.
- 1. Plume search when enroute to the projected plume pathway:
1.1 Periodically monitor background.
1.2 Report and record any increase in background to the EOF Field Team Specialist include:
"* Maximum dose rate location
"* Any other conditions of note 1.3 Follow the instructions of the Field Team Specialist.
- 2. Plume search when in the plume or the projected plume pathway:
2.1 Continually monitor background 2.2 Report and record any increase in background to the EOF Field Team Specialist include:
"* Maximum dose rate
"* Lowest dose rate
"* Location
"* Changes in meteorological conditions
"* Any other conditions of note
- 3. Consult with the EOF Field Team Specialist to determine the location in which to perform surveys.
R18
FORT CALHOUN STATION EPIP-EOF-3 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 6 OF 10.3 - Performing Surveys
(,/
INITIALS
- 1. General instructions:
1.1 Ensure that EOF Field Team Specialist is aware of your location.
1.2 Always use ALARA principles.
1.3 When stopped use roof mounted yellow light.
1.4 Always park in a safe and secure location.
1.5 Exercise care when handling sample to prevent cross-contamination.
1.6 Be aware of the need for protective clothing.
1.7 If radio communication is lost for any reason contact Field Team Specialist by commercial telephone.
1.8 Dosimetry should be read at each sample location as a minimum, record results on FC-EPF-2.
- 2. Beta/Gamma Surveys NOTE: Determine beta and gamma radiation levels using the ion chamber instrument. The ESP-2 with HP270 probe may be used as a backup.
NOTE: In a noble gas field, an ion chamber instrument can become internally contaminated and provide erroneous readings.
2.1 In an open area, avoiding trees and other obstructions:
2.1.1 Monitor for beta and gamma radiation at ground level.
2.1.2 Monitor for beta and gamma radiation at waist level.
2.1.3 Record readings on FC-EPF-2.
R18
FORT CALHOUN STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE.3 - Performing Surveys
- 3. Air Sampling [AR 30448]
3.1 Load the air sampler with both a particulate filter and a charcoal cartridge.
3.1.1 Note the direction of the air flow on the cartridge using the arrow for guidance.
3.1.2 Note the collection side of the particulate filter with an ink mark.
3.1.3 Ensure the gaskets are in place and the particulate filter is properly positioned to prevent air to bypass the filter.
NOTE: Perform air sampling in an open area away from trees, buildings and other obstructions.
NOTE: Do not place air sampler on the ground or in any other place where it may vacuum surface contamination.
3.2 If power is to be supplied from the vehicle inverter:
3.2.1 Put the power supply switch in "generator" or "inverter" position.
3.2.2 Turn on the inverter switch (located on the inverter).
3.3 If power is to be supplied from an outside power source:
3.3.1 Ensure power supply switch is on outside power.
3.3.2 Plug van into the power source.
3.4 Plug Sampler in and operate in accordance with
"* RP-434
"* Perform air sampling as per RP-203 3.5 Bag the particulate and iodine samples separately and fill out and attach the supplied label.
EPIP-EOF-3 PAGE 7 OF 10
(_)
INITIALS R18
FORT CALHOUN STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE.3 - Performing Surveys
- 4.
Smear Collection:
4.1 Obtain and clearly number the desired amount of smears:
4.1.1 Smear surfaces as desired using a standard 100 cm 2 (approximate) smear area.
4.1.2 Bag the smears and fill out and attach the supplied label.
EPIP-EOF-3 PAGE 8 OF 10 W)
INITIALS R18
FORT CALHOUN STATION EPIP-EOF-3 EMERGENCY PLAN IMPLEMENTING PROCEDURE PAGE 9 OF 10.4 - Counting Samples
- 1. Sample Counting 1.1 Upon completion of sample collection:
NOTE: If instrument backgrounds remain high after leaving the plume area try decontaminating the probes.
1.1.1 Move to a low background area (<300 cpm) to count samples.
1.1.2 Re-establish a background for all instruments.
1.2 Count and calculate samples, using FC-EPF-8 for guidance:
NOTE: Use care not to cross contaminate samples.
1.2.1 Count the charcoal cartridge for gross iodine activity.
1.2.2 Count the paper filters for gross particulate activity.
1.2.3 Count smears for activity in DPM/100 cm 2.
1.2.4 Log iodine and particulate air sample results and the highest smear results on FC-EPF-2.
1.2.5 Return all samples to their original labeled bags.
1.2.6 Seal bags and place in designated storage bin.
1.3 Report results to the EOF Field Team Specialist or TSC Protective Measures Coordinator.
R18
FORT CALHOUN STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE.5 - Follow-up Actions EPIP-EOF-3 PAGE 10 OF 10
(./)
INITIALS
- 1. If directed to return to site or the EOF:
1.1 Obtain appropriate direction to the selected site.
1.2 Assume that you and the vehicle are contaminated.
1.3 Secure vehicle by:
"* Turning off the power
"* Turn off the power inverter
"* If possible plug vehicle tank heater into AC power supply 1.4 Ensure vehicle and all personnel are monitored for contamination and deconned as necessary.
1.5 Prepare a list of supplies that are needed to return the vehicle to ready state.
1.6 Deliver all samples, forms and logs to the Field Team Specialist at the EOF or the OSC RP Coordinator at the site.
R18