L-2005-185, July 2005 Monthly Operating Report for St. Lucie Units 1 and 2

From kanterella
(Redirected from L-2005-185)
Jump to navigation Jump to search
July 2005 Monthly Operating Report for St. Lucie Units 1 and 2
ML052290284
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/11/2005
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2005-185
Download: ML052290284 (3)


Text

-

Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 0 August 11, 2005 FPL L-2005-185 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the July 2005 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, Willift Jeffb;si Vice President St. Lucie Plant WJ/KWF Attachment I r- L an FPL Group company

L-2005-1 85 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 500-335 UNIT NAME S:. Lucie 1 DATE iE Igust u0,2uu0 COMPLETED BY R7. R. ole~r TELEPHONE _7 72) 467-7465 REPORTING PERIOD: July 2005

1. Design Electrical Rating 830.00
2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,087.00 206,215.12
4. Number of Hours Generator On-line 744.00 5,087.00 204,316.85
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 630,228.00 4,334,560.00 167,759,802.0 UNIT SHUTDOWNS Type Method of F: Forced Duration l Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason I Down 2 Comments

SUMMARY

St. Lucie Unit I operated in Mode 1 the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.

I 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

L-2005-1 85 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO. 50-389 UNIT NAME St. Lucie 2 DATE August 08, 2005 COMPLETED BY K. R. Boller TELEPHONE (772) 467-7465 REPORTING PERIOD: July 2005

1. Design Electrical Rating 830.00
2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,108.70 168,246.92
4. Number of Hours Generator On-line 744.00 4,053.07 166,235.94
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 620,871.00 3,339,906.00 137,168,316.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason I Down 2 Comments

SUMMARY

St. Lucie Unit 2 operated in Mode 1 the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)