L-2005-114, April 2005 Monthly Operating Report for St Lucie Units 1 & 2

From kanterella
Jump to navigation Jump to search
April 2005 Monthly Operating Report for St Lucie Units 1 & 2
ML051440362
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 05/16/2005
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2005-114
Download: ML051440362 (3)


Text

Florida Power & Light Company, 6501 S.Ocean Drive, Jensen Beach, FL 34957 0 May 16,2005 F=PL L-2005-114 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the April 2005 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, William ,4effersi Vice President St. Lucie Plant WJ/KWF Attachment

,`---, 2 an FPL Group company

-'9 .. k.. '

1 I

,.e L-2005-1 14 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 50 -335 UNIT NAME T: t.Eu-c e 1 DATE Uri COMPLETED BY R TELEPHONE Tr,'72J467-7465 REPORTING PERIOD: April 2005

1. Design Electrical Rating 830.00
2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 719.00 2,879.00 204,007.12
4. Number of Hours Generator On-line 719.00 2,879.00 202,108.85
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 613,660.00 2,461,536.00 165,886,778.0 UNIT SHUTDOWNS Type Method of F: Forced Duration - Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason Down 2 Comments

SUMMARY

St. Lucie Unit I operated in Mode I for the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.

I 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

..-" i - ,. ! i.11 .. , -

L-2005-1 14 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO. 50 -389 UNIT NAME STt.Lu-cie 2-DATE IT, COMPLETED BY T. .K. oler-TELEPHONE 7V'72)467-7465 REPORTING PERIOD: April 2005

1. Design Electrical Rating 830.00
2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 719.00 1,900.70 166,038.92
4. Number of Hours Generator On-line 719.00 1,845.07 164,027.94
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 606,315.00 1,491,657.00 135,320,067.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date 5: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

St. Lucie Unit 2 operated in Mode I for the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Text

Florida Power & Light Company, 6501 S.Ocean Drive, Jensen Beach, FL 34957 0 May 16,2005 F=PL L-2005-114 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the April 2005 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, William ,4effersi Vice President St. Lucie Plant WJ/KWF Attachment

,`---, 2 an FPL Group company

-'9 .. k.. '

1 I

,.e L-2005-1 14 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 50 -335 UNIT NAME T: t.Eu-c e 1 DATE Uri COMPLETED BY R TELEPHONE Tr,'72J467-7465 REPORTING PERIOD: April 2005

1. Design Electrical Rating 830.00
2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 719.00 2,879.00 204,007.12
4. Number of Hours Generator On-line 719.00 2,879.00 202,108.85
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 613,660.00 2,461,536.00 165,886,778.0 UNIT SHUTDOWNS Type Method of F: Forced Duration - Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason Down 2 Comments

SUMMARY

St. Lucie Unit I operated in Mode I for the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.

I 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

..-" i - ,. ! i.11 .. , -

L-2005-1 14 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO. 50 -389 UNIT NAME STt.Lu-cie 2-DATE IT, COMPLETED BY T. .K. oler-TELEPHONE 7V'72)467-7465 REPORTING PERIOD: April 2005

1. Design Electrical Rating 830.00
2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 719.00 1,900.70 166,038.92
4. Number of Hours Generator On-line 719.00 1,845.07 164,027.94
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 606,315.00 1,491,657.00 135,320,067.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date 5: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

St. Lucie Unit 2 operated in Mode I for the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)