L-2003-150, May 2003 Monthly Operating Report for St. Lucie Units 1 and 2

From kanterella
Jump to navigation Jump to search
May 2003 Monthly Operating Report for St. Lucie Units 1 and 2
ML031690023
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/13/2003
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2003-150
Download: ML031690023 (7)


Text

Florida Power & Light Company, 6501 S.Ocean Drive, Jensen Beach, FL 34957 0

FPL June 13, 2003 L-2003-150 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly OperatinQ Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the May 2003 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units I and 2.

Please contact us should there be any questions regarding this information.

Vice President St. Lucie Plant WJ/spt Attachments an FPL Group company

-'- q

DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit I DATE: June 3,2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: May 2003

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net)- 839 MONTH -YTD- CUMULAlVE
3. Number of Hours Reactor Critical_ 744 3623 188407
4. Number of Hours Generator On Line__ 744 3623 186573.3
5. Unit Reserve Shutdown Hours_ __ 0.0 0.0 0.0
6. Net Electrical Energy (MWH) _ _- 638071 3113357 152709491

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie Unit 1 DATE: June 3, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: May 2003 Unit 1 operated at essentially full power through the entire month of May.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Unit 1 DATE: June 3, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: May 2003 Number Date Typel Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence

. Unit 1 operated at essentially full power for the entire month of May.

2 3 F Forced Reason Method S Scheduled A -Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 -Automatic Scram D - Regulatory Restiction 4 -Continued E -Operator Training &License Examination 5 -Load Reduction F - Administrative 9 -Other (Explain)

G -Operational Error (Explain)

H Other (Explain)

DOCKET NO.: 50-389 UNIT NAME: St Lucie Unit 2 DATE: June 3,2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: May 2003

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net)- 839 MONTH -YTD- CUMUJLATIVE
3. Number of Hours Reactor Critical_ 0.0 2568.9 151327.5
4. Number of Hours Generator On Line_ _ 0.0 2538.85 149539.15
5. Unit Reserve Shutdown Hours_ __ 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 0.0 2114297 123273010

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: June 3, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: May 2003 Unit 2 remained offline for the entire month of May for refueling and maintenance.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucle Unit 2 DATE: June 3,2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: May 2003 Number Date Typel Duration Reason2 Method of Cause &Corrective l (HouM) Shutting Down Action to Reactor3 Prevent Recurrence S 4/21/03 5 744 C I Unit 2 offline for refueling and maintenance.

1 2 3 F Forced Reason Method S Scheduled A- Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restction 4 - Continued E - Operator Training & License Examination 5- Load Reduction F - Administrative 9- Other (Explain)

G -Operational Error (Explain)

H -Other (Explain)

Text

Florida Power & Light Company, 6501 S.Ocean Drive, Jensen Beach, FL 34957 0

FPL June 13, 2003 L-2003-150 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly OperatinQ Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the May 2003 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units I and 2.

Please contact us should there be any questions regarding this information.

Vice President St. Lucie Plant WJ/spt Attachments an FPL Group company

-'- q

DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit I DATE: June 3,2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: May 2003

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net)- 839 MONTH -YTD- CUMULAlVE
3. Number of Hours Reactor Critical_ 744 3623 188407
4. Number of Hours Generator On Line__ 744 3623 186573.3
5. Unit Reserve Shutdown Hours_ __ 0.0 0.0 0.0
6. Net Electrical Energy (MWH) _ _- 638071 3113357 152709491

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie Unit 1 DATE: June 3, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: May 2003 Unit 1 operated at essentially full power through the entire month of May.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Unit 1 DATE: June 3, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: May 2003 Number Date Typel Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence

. Unit 1 operated at essentially full power for the entire month of May.

2 3 F Forced Reason Method S Scheduled A -Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 -Automatic Scram D - Regulatory Restiction 4 -Continued E -Operator Training &License Examination 5 -Load Reduction F - Administrative 9 -Other (Explain)

G -Operational Error (Explain)

H Other (Explain)

DOCKET NO.: 50-389 UNIT NAME: St Lucie Unit 2 DATE: June 3,2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: May 2003

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net)- 839 MONTH -YTD- CUMUJLATIVE
3. Number of Hours Reactor Critical_ 0.0 2568.9 151327.5
4. Number of Hours Generator On Line_ _ 0.0 2538.85 149539.15
5. Unit Reserve Shutdown Hours_ __ 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 0.0 2114297 123273010

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: June 3, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: May 2003 Unit 2 remained offline for the entire month of May for refueling and maintenance.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucle Unit 2 DATE: June 3,2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: May 2003 Number Date Typel Duration Reason2 Method of Cause &Corrective l (HouM) Shutting Down Action to Reactor3 Prevent Recurrence S 4/21/03 5 744 C I Unit 2 offline for refueling and maintenance.

1 2 3 F Forced Reason Method S Scheduled A- Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restction 4 - Continued E - Operator Training & License Examination 5- Load Reduction F - Administrative 9- Other (Explain)

G -Operational Error (Explain)

H -Other (Explain)