February 2002 Monthly Operating Report for St. Lucie, Units 1 & 2
ML020770084
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/13/2002
From: Jernigan D
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2002-050
Download: ML020770084 (7)


Text

0I PL Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 March 13, 2002 L-2002-050 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the February 2002 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Donald E. Jernigan Vice President St. Lucie Plant DEJ/spt Attachments

" -,e,--- 9-4

ýIk an FPL Group company

DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit 1 DATE: Mar. 5, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: February 2002

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net). 839 MONTH -YTD CUMULATIVE
3. Number of Hours Reactor Critical 672 1416 178016.5
4. Number of Hours Generator On Line 672 1416 176203
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 577652 1216730 143893469

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie #1 DATE: Mar. 5, 2002 COMPLETED BY: J.A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH February 2002 Unit 1 operated at essentially full power through the entire month of February.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie #1 DATE: Mar. 5, 2002 COMPLETED BY: J.A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH February 2002 Number Date Type I Duration Reason 2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence Unit 1 operated at essentially full power for the entire month I _ Iof February.

2 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain) 091S87 FPL

DOCKET NO.: 50-389 UNIT NAME: St. Lucie Unit 2 DATE: Mar. 5, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: February 2002

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net). 839 MONTH -YTD CUMULATIVE
3. Number of Hours Reactor Critical 657.4 1401.4 141414.6
4. Number of Hours Generator On Line 654.6 1398.6 139656.3
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 555263 1193326 114923972

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie #2 DATE: Mar. 5, 2002 COMPLETED BY: J.A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH February 2002 Unit 2 downpowered on February 4 and was removed from service on February 5 for repair of switchyard equipment.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie #2 DATE: Mar.5, 2002 COMPLETED BY: J.A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH February 2002 Number Date Typel Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence 1 2/4/02 S 0.0 A 5 Unit 2 downpowered for repair of switchyard equipment.

2 2/5/02 S 17.4 A I Unit 2 offline for repair of switchyard equipment F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain) 091587 FPL

Text

0I PL Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 March 13, 2002 L-2002-050 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the February 2002 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Donald E. Jernigan Vice President St. Lucie Plant DEJ/spt Attachments

" -,e,--- 9-4

ýIk an FPL Group company

DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit 1 DATE: Mar. 5, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: February 2002

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net). 839 MONTH -YTD CUMULATIVE
3. Number of Hours Reactor Critical 672 1416 178016.5
4. Number of Hours Generator On Line 672 1416 176203
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 577652 1216730 143893469

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie #1 DATE: Mar. 5, 2002 COMPLETED BY: J.A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH February 2002 Unit 1 operated at essentially full power through the entire month of February.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie #1 DATE: Mar. 5, 2002 COMPLETED BY: J.A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH February 2002 Number Date Type I Duration Reason 2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence Unit 1 operated at essentially full power for the entire month I _ Iof February.

2 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain) 091S87 FPL

DOCKET NO.: 50-389 UNIT NAME: St. Lucie Unit 2 DATE: Mar. 5, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: February 2002

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net). 839 MONTH -YTD CUMULATIVE
3. Number of Hours Reactor Critical 657.4 1401.4 141414.6
4. Number of Hours Generator On Line 654.6 1398.6 139656.3
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 555263 1193326 114923972

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie #2 DATE: Mar. 5, 2002 COMPLETED BY: J.A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH February 2002 Unit 2 downpowered on February 4 and was removed from service on February 5 for repair of switchyard equipment.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie #2 DATE: Mar.5, 2002 COMPLETED BY: J.A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH February 2002 Number Date Typel Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence 1 2/4/02 S 0.0 A 5 Unit 2 downpowered for repair of switchyard equipment.

2 2/5/02 S 17.4 A I Unit 2 offline for repair of switchyard equipment F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain) 091587 FPL