FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 June 14, 2004 L-2004-132 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the May 2004 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns for St. Lucie Units I and 2.
Please contact us should there be any questions regarding this information.
William Jefferfs Vice President St. Lucie Plant WJ/KWF Attachment
& I an FPL Group company
L-2004-1 32 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO.
50 UNIT NAME St DATE Jui COMPLETED BY K.
TELEPHONE (77 REPORTING PERIOD:
-335
. Lucie I ne 14, 2004 R. Boller
- 72) 467-7465 May 2004
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 830.00 839.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line
- 5. Reserve Shutdown Hours
- 6. Net Electrical Energy Generated (MWHrs)
.This Month 744.00 744.00 0.00 635,576.00 Yr-to-Date 2,850.30 2,807.40 0.00 2,359,667.00 Cumulative 196,394.30 194,517.70 0.00 159,460,614.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason I Down 2 Comments
SUMMARY
- St. Lucie Unit I operated at essentially full power for the entire month of May. In accordance with Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
L-2004-1 32 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO.
50 UNIT NAME St DATE Ju COMPLETED BY K.
TELEPHONE (77 REPORTING PERIOD:
-389
.Lucie 2 ne 14, 2004 R. Boller
- 72) 467-7465 May 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 830.00 839.00
- 3. Number of Hours the Reactor was Critical
- 4. Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 630,476.00 Yr-to-Date 3,647.00 3,647.00 0.00 3,093,288.00 Cumulative 159,683.57 157,769.47 0.00 130,140,264.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- St. Lucie Unit 2 operated at essentially full power for the entire month of May. In accordance with Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual TriplScram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)