May 2004 Monthly Operating Report for St. Lucie Units 1 and 2
ML041740658
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/14/2004
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML041740658 (3)


Text

. ..

Florida Power & Light Company, 6501 S.Ocean Drive, Jensen Beach, FL 34957 June 14, 2004 FPL L-2004-132 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the May 2004 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns for St. Lucie Units I and 2.

Please contact us should there be any questions regarding this information.

William Jefferfs Vice President St. Lucie Plant WJ/KWF Attachment

& I an FPL Group company

L-2004-1 32 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 50 -335 UNIT NAME St . Lucie I DATE Juine 14, 2004 COMPLETED BY K. R. Boller TELEPHONE (7772) 467-7465 REPORTING PERIOD: May 2004

1. Design Electrical Rating 830.00
2. Maximum Dependable Capacity (MWe-Net) 839.00

.This Month Yr-to-Date Cumulative

3. Number of Hours the Reactor was Critical 744.00 2,850.30 196,394.30
4. Number of Hours Generator On-line 744.00 2,807.40 194,517.70
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 635,576.00 2,359,667.00 159,460,614.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason I Down 2 Comments

SUMMARY

St. Lucie Unit I operated at essentially full power for the entire month of May. In accordance with Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

L-2004-1 32 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO. 50 -389 UNIT NAME St . Lucie 2 DATE Ju ne 14, 2004 COMPLETED BY K. R. Boller TELEPHONE (7772) 467-7465 REPORTING PERIOD: May 2004

1. Design Electrical Rating 830.00
2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 3,647.00 159,683.57
4. Number of Hours Generator On-line 744.00 3,647.00 157,769.47
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 630,476.00 3,093,288.00 130,140,264.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

St. Lucie Unit 2 operated at essentially full power for the entire month of May. In accordance with Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

I 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)