Florida Power &Light Company, 6501 S.Ocean Drive, Jensen Beach. FL 34957 0I FPL September 10, 2003 L-2003-228 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly ODeratinc Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the August 2003 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Vice President St. Lucie Plant WJ/spt Attachments

-7, A

an FPL Group company

DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit I DATE: September 4,2003 COMPLETED BY: W. D. Mead, Jr.

TELEPHONE: (772) 467-7293 REPORTING PERIOD: August 2003

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net)_ 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 744 5831 190615
4. Number of Hours Generator On Line_ _ 744 5831 188781.3

-5. Unit Reserve Shutdown Hours_ 0.0 0.0 0.0

6. Net Electrical Energy (MWH) 638134 5003822 154599956

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie Unit i DATE: September4,2003 COMPLETED BY: W. D.Mead, Jr.

TELEPHONE: (772) 467-7293 REPORT MONTH: August 2003 Unit I operated at essentially full power through the entire month of August.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

'p 0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Unit I DATE: September 4,2003 COMPLETED BY: W. D. Mead, Jr.

TELEPHONE: (772) 467-7293 REPORT MONTH: August 2003 Number Date Typel Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence

__._X__ ~_[__tIopeatedatssenialy pwerorheetir month of Augus I 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 Manual B - Maintenance or Test 2 - Manual Scram C- Refueling 3 - Automatic Scram D0 Regulatoiy Restriction 4- Continued E - Operator Training & License Examination 5. Load Reduction F - Administrative 9. Other (Explain)

G - Operational Error (Explain)

H - Other (Explain)

DOCKET NO.: 50-389 UNIT NAME: St Lucie Unit 2 DATE: September 4,2003 COMPLETED BY: W. D.Mead, Jr.

TELEPHONE: (772) 467-7293 REPORTING PERIOD: August 2003

1. Design Electrical Rating (Mwe-Net) 830
2. Maximurn Dependable Capacity (Mwe-Net)_ 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical__ 744 4489.2 153247.8
4. Number of Hours Generator On Lne_____ 744 4384.45 151384.75
5. Unit Reserve Shutdown Hours_ __ 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 632199 3609232 124767945

t *I

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St Lucie Unit 2 DATE: September 4,2003 COMPLETED BY: W. D. Mead, Jr.

TELEPHONE: (772) 467-7293 REPORT MONTH: August 2003 Unit 2 operated at essentially full power through the entire month of August.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: September 4, 2003 COMPLETED BY: W. D. Mead, Jr.

TELEPHONE: (772) 467-7293 REPORT MONTH: August 2003

[

II Number l_______

Date Typel II Duration (Hours)

Reason 2 Method of Shutting Down Reactor3 Cause & Corrective Action to Prevent Recurrence l - = Unit 2 operated at essentially fun power for the entire month of August.

1 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B . Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4- Continued E - Operator Training &License Examination 5- Load Reduction F . Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H -Other (Explain)

Text

Florida Power &Light Company, 6501 S.Ocean Drive, Jensen Beach. FL 34957 0I FPL September 10, 2003 L-2003-228 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly ODeratinc Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the August 2003 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Vice President St. Lucie Plant WJ/spt Attachments

-7, A

an FPL Group company

DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit I DATE: September 4,2003 COMPLETED BY: W. D. Mead, Jr.

TELEPHONE: (772) 467-7293 REPORTING PERIOD: August 2003

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net)_ 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 744 5831 190615
4. Number of Hours Generator On Line_ _ 744 5831 188781.3

-5. Unit Reserve Shutdown Hours_ 0.0 0.0 0.0

6. Net Electrical Energy (MWH) 638134 5003822 154599956

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie Unit i DATE: September4,2003 COMPLETED BY: W. D.Mead, Jr.

TELEPHONE: (772) 467-7293 REPORT MONTH: August 2003 Unit I operated at essentially full power through the entire month of August.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

'p 0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Unit I DATE: September 4,2003 COMPLETED BY: W. D. Mead, Jr.

TELEPHONE: (772) 467-7293 REPORT MONTH: August 2003 Number Date Typel Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence

__._X__ ~_[__tIopeatedatssenialy pwerorheetir month of Augus I 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 Manual B - Maintenance or Test 2 - Manual Scram C- Refueling 3 - Automatic Scram D0 Regulatoiy Restriction 4- Continued E - Operator Training & License Examination 5. Load Reduction F - Administrative 9. Other (Explain)

G - Operational Error (Explain)

H - Other (Explain)

DOCKET NO.: 50-389 UNIT NAME: St Lucie Unit 2 DATE: September 4,2003 COMPLETED BY: W. D.Mead, Jr.

TELEPHONE: (772) 467-7293 REPORTING PERIOD: August 2003

1. Design Electrical Rating (Mwe-Net) 830
2. Maximurn Dependable Capacity (Mwe-Net)_ 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical__ 744 4489.2 153247.8
4. Number of Hours Generator On Lne_____ 744 4384.45 151384.75
5. Unit Reserve Shutdown Hours_ __ 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 632199 3609232 124767945

t *I

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St Lucie Unit 2 DATE: September 4,2003 COMPLETED BY: W. D. Mead, Jr.

TELEPHONE: (772) 467-7293 REPORT MONTH: August 2003 Unit 2 operated at essentially full power through the entire month of August.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: September 4, 2003 COMPLETED BY: W. D. Mead, Jr.

TELEPHONE: (772) 467-7293 REPORT MONTH: August 2003

[

II Number l_______

Date Typel II Duration (Hours)

Reason 2 Method of Shutting Down Reactor3 Cause & Corrective Action to Prevent Recurrence l - = Unit 2 operated at essentially fun power for the entire month of August.

1 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B . Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4- Continued E - Operator Training &License Examination 5- Load Reduction F . Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H -Other (Explain)