MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-042, Periodic Update of Population Data within 10 and 50 Miles of the Plant2023-03-27027 March 2023 Periodic Update of Population Data within 10 and 50 Miles of the Plant L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-039, Cycle 27 Core Operating Limits Report2023-03-0707 March 2023 Cycle 27 Core Operating Limits Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2023-038, 2022 Annual Operating Report2023-02-28028 February 2023 2022 Annual Operating Report L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan L-2023-019, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20222023-02-15015 February 2023 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2022 L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-08
[Table view] Category:License-Monthly Operating Report
MONTHYEARL-2006-009, December 2005 Monthly Operating Report for St. Lucie Units 1 & 22006-01-13013 January 2006 December 2005 Monthly Operating Report for St. Lucie Units 1 & 2 L-2005-248, November 2005 Monthly Operating Report for St. Lucie, Units 1 and 22005-12-0808 December 2005 November 2005 Monthly Operating Report for St. Lucie, Units 1 and 2 L-2005-236, October 2005 Monthly Operating Report for St. Lucie, Units 1 & 22005-11-0909 November 2005 October 2005 Monthly Operating Report for St. Lucie, Units 1 & 2 L-2005-221, September 2005 Monthly Operating Report for St Lucie Units 1 and 22005-10-14014 October 2005 September 2005 Monthly Operating Report for St Lucie Units 1 and 2 L-2005-199, August 2005 Monthly Operating Report for St. Lucie 12005-09-13013 September 2005 August 2005 Monthly Operating Report for St. Lucie 1 L-2005-185, July 2005 Monthly Operating Report for St. Lucie Units 1 and 22005-08-11011 August 2005 July 2005 Monthly Operating Report for St. Lucie Units 1 and 2 L-2005-151, June 2005 Monthly Operating Report for St Lucie Units 1 & 22005-07-11011 July 2005 June 2005 Monthly Operating Report for St Lucie Units 1 & 2 L-2005-138, May 2005 Monthly Operating Report for St Lucie Units 1 & 22005-06-15015 June 2005 May 2005 Monthly Operating Report for St Lucie Units 1 & 2 L-2005-114, April 2005 Monthly Operating Report for St Lucie Units 1 & 22005-05-16016 May 2005 April 2005 Monthly Operating Report for St Lucie Units 1 & 2 L-2005-091, March 2005 Monthly Operating Report for St Lucie Units 1 and 22005-04-15015 April 2005 March 2005 Monthly Operating Report for St Lucie Units 1 and 2 L-2005-063, February 2005 Monthly Operating Report for St Lucie Units 1 and 22005-03-15015 March 2005 February 2005 Monthly Operating Report for St Lucie Units 1 and 2 L-2005-036, January 2005 Monthly Operating Report for St. Lucie Units 1 and 22005-02-0808 February 2005 January 2005 Monthly Operating Report for St. Lucie Units 1 and 2 L-2005-010, December 2004 Monthly Operating Report for St Lucie Units 1 and 22005-01-17017 January 2005 December 2004 Monthly Operating Report for St Lucie Units 1 and 2 L-2004-264, October 2004 Monthly Operating Report for St Lucie Units 1 and 22004-11-12012 November 2004 October 2004 Monthly Operating Report for St Lucie Units 1 and 2 L-2004-225, September 2004 Monthly Operating Report for St Lucie Units 1 and 22004-10-11011 October 2004 September 2004 Monthly Operating Report for St Lucie Units 1 and 2 L-2004-207, August 2004 Monthly Operating Report for St Lucie Units 1 and 22004-09-13013 September 2004 August 2004 Monthly Operating Report for St Lucie Units 1 and 2 L-2004-182, July 2004 Monthly Operating Report for St. Lucie Units 1 and 22004-08-10010 August 2004 July 2004 Monthly Operating Report for St. Lucie Units 1 and 2 L-2004-159, June 2004 Monthly Operating Report for St. Lucie Units 1 and 22004-07-14014 July 2004 June 2004 Monthly Operating Report for St. Lucie Units 1 and 2 ML0417406582004-06-14014 June 2004 May 2004 Monthly Operating Report for St. Lucie Units 1 and 2 L-2004-113, April 2004 Monthly Operating Report for St. Lucie Units 1 & 22004-05-14014 May 2004 April 2004 Monthly Operating Report for St. Lucie Units 1 & 2 L-2004-087, March 2004 Monthly Operating Report for St. Lucie Units 1 and 22004-04-13013 April 2004 March 2004 Monthly Operating Report for St. Lucie Units 1 and 2 L-2004-060, February 2004 Monthly Operating Report for St. Lucie, Units 1 and 22004-03-12012 March 2004 February 2004 Monthly Operating Report for St. Lucie, Units 1 and 2 L-2004-042, January 2004 Monthly Operating Report for St. Lucie, Units 1 and 22004-02-10010 February 2004 January 2004 Monthly Operating Report for St. Lucie, Units 1 and 2 L-2004-005, December 2003 Monthly Operating Report for St. Lucie, Units 1 and 22004-01-15015 January 2004 December 2003 Monthly Operating Report for St. Lucie, Units 1 and 2 L-2003-303, November 2003 Monthly Operating Report for St. Lucie, Units 1 and 22003-12-11011 December 2003 November 2003 Monthly Operating Report for St. Lucie, Units 1 and 2 L-2003-282, October 2003 Monthly Operating Report for St. Lucie, Units 1 and 22003-11-13013 November 2003 October 2003 Monthly Operating Report for St. Lucie, Units 1 and 2 L-2003-268, September 2003 Monthly Operating Report for St. Lucie, Units 1 & 22003-10-15015 October 2003 September 2003 Monthly Operating Report for St. Lucie, Units 1 & 2 L-2003-228, August 2003 Monthly Operating Report for St. Lucie Units 1 & 22003-09-10010 September 2003 August 2003 Monthly Operating Report for St. Lucie Units 1 & 2 L-2003-210, July 2003 Monthly Operating Report for St. Lucie Units 1 & 22003-08-13013 August 2003 July 2003 Monthly Operating Report for St. Lucie Units 1 & 2 L-2003-177, June 2003 Monthly Operating Report for St. Lucie Units 1 and 22003-07-15015 July 2003 June 2003 Monthly Operating Report for St. Lucie Units 1 and 2 L-2003-150, May 2003 Monthly Operating Report for St. Lucie Units 1 and 22003-06-13013 June 2003 May 2003 Monthly Operating Report for St. Lucie Units 1 and 2 L-2003-119, April 2003 Monthly Operating Report for St. Lucie, Units 1 & 22003-05-14014 May 2003 April 2003 Monthly Operating Report for St. Lucie, Units 1 & 2 L-2003-090, March 2003 Monthly Operating Report for St. Lucie Units 1 & 22003-04-14014 April 2003 March 2003 Monthly Operating Report for St. Lucie Units 1 & 2 L-2003-060, February 2003 Monthly Operating Report for St. Lucie Units 1 & 22003-03-11011 March 2003 February 2003 Monthly Operating Report for St. Lucie Units 1 & 2 L-2003-025, January 2003 Monthly Operating Report for St. Lucie Units 1 & 22003-02-11011 February 2003 January 2003 Monthly Operating Report for St. Lucie Units 1 & 2 L-2003-004, December 2002 Monthly Operating Report for St. Lucie Units 1 & 22003-01-13013 January 2003 December 2002 Monthly Operating Report for St. Lucie Units 1 & 2 L-2002-244, November 2002 Monthly Operating Report for St. Lucie, Units 1 & 22002-12-10010 December 2002 November 2002 Monthly Operating Report for St. Lucie, Units 1 & 2 L-2002-227, October 2002 Monthly Operating Report for St. Lucie Units 1 & 22002-11-15015 November 2002 October 2002 Monthly Operating Report for St. Lucie Units 1 & 2 L-2002-206, September 2002 Monthly Operating Report for St. Lucie Units 1 & 22002-10-14014 October 2002 September 2002 Monthly Operating Report for St. Lucie Units 1 & 2 L-2002-184, August 2002 Monthly Operating Report for St Lucie Units 1 and 22002-09-11011 September 2002 August 2002 Monthly Operating Report for St Lucie Units 1 and 2 L-2002-164, July 2002 Monthly Operating Report for St. Lucie Units 1 & 22002-08-13013 August 2002 July 2002 Monthly Operating Report for St. Lucie Units 1 & 2 L-2002-133, June 2002 Monthly Operating Report for St. Lucie, Units 1 & 22002-07-11011 July 2002 June 2002 Monthly Operating Report for St. Lucie, Units 1 & 2 L-2002-098, April 2002 Monthly Operating Report for St. Lucie Units 1 & 22002-05-14014 May 2002 April 2002 Monthly Operating Report for St. Lucie Units 1 & 2 L-2002-066, March 2002 Monthly Operating Report for St. Lucie Units 1 and 22002-04-12012 April 2002 March 2002 Monthly Operating Report for St. Lucie Units 1 and 2 L-2002-050, February 2002 Monthly Operating Report for St. Lucie, Units 1 & 22002-03-13013 March 2002 February 2002 Monthly Operating Report for St. Lucie, Units 1 & 2 L-2002-034, January 2002 Monthly Operating Report for St. Lucie, Units 1 & 22002-02-13013 February 2002 January 2002 Monthly Operating Report for St. Lucie, Units 1 & 2 L-2002-010, December 2001 Monthly Operating Report for St. Lucie Units 1 and 22002-01-14014 January 2002 December 2001 Monthly Operating Report for St. Lucie Units 1 and 2 2006-01-13
[Table view] |
Text
Florida Power &Light Company, 6501 S.Ocean Drive, Jensen Beach. FL 34957 0I FPL September 10, 2003 L-2003-228 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly ODeratinc Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the August 2003 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
Please contact us should there be any questions regarding this information.
Vice President St. Lucie Plant WJ/spt Attachments
-7, A
an FPL Group company
DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit I DATE: September 4,2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORTING PERIOD: August 2003
- 1. Design Electrical Rating (Mwe-Net) 830
- 2. Maximum Dependable Capacity (Mwe-Net)_ 839 MONTH -YTD- CUMULATIVE
- 3. Number of Hours Reactor Critical 744 5831 190615
- 4. Number of Hours Generator On Line_ _ 744 5831 188781.3
-5. Unit Reserve Shutdown Hours_ 0.0 0.0 0.0
- 6. Net Electrical Energy (MWH) 638134 5003822 154599956
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie Unit i DATE: September4,2003 COMPLETED BY: W. D.Mead, Jr.
TELEPHONE: (772) 467-7293 REPORT MONTH: August 2003 Unit I operated at essentially full power through the entire month of August.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
'p 0
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Unit I DATE: September 4,2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORT MONTH: August 2003 Number Date Typel Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence
__._X__ ~_[__tIopeatedatssenialy pwerorheetir month of Augus I 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 Manual B - Maintenance or Test 2 - Manual Scram C- Refueling 3 - Automatic Scram D0 Regulatoiy Restriction 4- Continued E - Operator Training & License Examination 5. Load Reduction F - Administrative 9. Other (Explain)
G - Operational Error (Explain)
H - Other (Explain)
DOCKET NO.: 50-389 UNIT NAME: St Lucie Unit 2 DATE: September 4,2003 COMPLETED BY: W. D.Mead, Jr.
TELEPHONE: (772) 467-7293 REPORTING PERIOD: August 2003
- 1. Design Electrical Rating (Mwe-Net) 830
- 2. Maximurn Dependable Capacity (Mwe-Net)_ 839 MONTH -YTD- CUMULATIVE
- 3. Number of Hours Reactor Critical__ 744 4489.2 153247.8
- 4. Number of Hours Generator On Lne_____ 744 4384.45 151384.75
- 5. Unit Reserve Shutdown Hours_ __ 0.0 0.0 0.0
- 6. Net Electrical Energy (MWH) 632199 3609232 124767945
t *I
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St Lucie Unit 2 DATE: September 4,2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORT MONTH: August 2003 Unit 2 operated at essentially full power through the entire month of August.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: September 4, 2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORT MONTH: August 2003
[
II Number l_______
Date Typel II Duration (Hours)
Reason 2 Method of Shutting Down Reactor3 Cause & Corrective Action to Prevent Recurrence l - = Unit 2 operated at essentially fun power for the entire month of August.
1 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B . Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4- Continued E - Operator Training &License Examination 5- Load Reduction F . Administrative 9 - Other (Explain)
G - Operational Error (Explain)
H -Other (Explain)
Text
Florida Power &Light Company, 6501 S.Ocean Drive, Jensen Beach. FL 34957 0I FPL September 10, 2003 L-2003-228 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly ODeratinc Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the August 2003 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
Please contact us should there be any questions regarding this information.
Vice President St. Lucie Plant WJ/spt Attachments
-7, A
an FPL Group company
DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit I DATE: September 4,2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORTING PERIOD: August 2003
- 1. Design Electrical Rating (Mwe-Net) 830
- 2. Maximum Dependable Capacity (Mwe-Net)_ 839 MONTH -YTD- CUMULATIVE
- 3. Number of Hours Reactor Critical 744 5831 190615
- 4. Number of Hours Generator On Line_ _ 744 5831 188781.3
-5. Unit Reserve Shutdown Hours_ 0.0 0.0 0.0
- 6. Net Electrical Energy (MWH) 638134 5003822 154599956
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie Unit i DATE: September4,2003 COMPLETED BY: W. D.Mead, Jr.
TELEPHONE: (772) 467-7293 REPORT MONTH: August 2003 Unit I operated at essentially full power through the entire month of August.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
'p 0
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Unit I DATE: September 4,2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORT MONTH: August 2003 Number Date Typel Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence
__._X__ ~_[__tIopeatedatssenialy pwerorheetir month of Augus I 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 Manual B - Maintenance or Test 2 - Manual Scram C- Refueling 3 - Automatic Scram D0 Regulatoiy Restriction 4- Continued E - Operator Training & License Examination 5. Load Reduction F - Administrative 9. Other (Explain)
G - Operational Error (Explain)
H - Other (Explain)
DOCKET NO.: 50-389 UNIT NAME: St Lucie Unit 2 DATE: September 4,2003 COMPLETED BY: W. D.Mead, Jr.
TELEPHONE: (772) 467-7293 REPORTING PERIOD: August 2003
- 1. Design Electrical Rating (Mwe-Net) 830
- 2. Maximurn Dependable Capacity (Mwe-Net)_ 839 MONTH -YTD- CUMULATIVE
- 3. Number of Hours Reactor Critical__ 744 4489.2 153247.8
- 4. Number of Hours Generator On Lne_____ 744 4384.45 151384.75
- 5. Unit Reserve Shutdown Hours_ __ 0.0 0.0 0.0
- 6. Net Electrical Energy (MWH) 632199 3609232 124767945
t *I
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St Lucie Unit 2 DATE: September 4,2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORT MONTH: August 2003 Unit 2 operated at essentially full power through the entire month of August.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: September 4, 2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORT MONTH: August 2003
[
II Number l_______
Date Typel II Duration (Hours)
Reason 2 Method of Shutting Down Reactor3 Cause & Corrective Action to Prevent Recurrence l - = Unit 2 operated at essentially fun power for the entire month of August.
1 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B . Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4- Continued E - Operator Training &License Examination 5- Load Reduction F . Administrative 9 - Other (Explain)
G - Operational Error (Explain)
H -Other (Explain)