L-2003-060, February 2003 Monthly Operating Report for St. Lucie Units 1 & 2

From kanterella
Jump to navigation Jump to search
February 2003 Monthly Operating Report for St. Lucie Units 1 & 2
ML030770775
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/11/2003
From: Jernigan D
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2003-060
Download: ML030770775 (7)


Text

0 Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 FPL March 11, 2003 L-2003-060 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the February 2003 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units I and 2.

e co ct us should there be any questions regarding this information.

Vry t yours, Donal .Jernigan Vice President St. Lucie Plant DEJ/spt Attachments an FPL Group company

DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit I DATE: March 3, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: February 2003

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net). 839 MONTH -YTD CUMULATIVE
3. Number of Hours Reactor Critical 672 1416 186200
4. Number of Hours Generator On Line 672 1416 184366.3
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH).- 577866 1218584 150814718

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie Unit 1 DATE: March 3, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: February 2003 Unit I operated at essentially full power through the entire month of February.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

'I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Unit I DATE: March 3, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: February 2003 Number Date Type1 Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence Unit 1 operated at essentially full power for the entire month of February.

2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training &License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain)

DOCKET NO.: 50-389 UNIT NAME: St. Lucie Unit 2 DATE: March 3, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: February 2003

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net)-_ 839 MONTH -YTD CUMULATIVE
3. Number of Hours Reactor Critical 672 1416 150174.6
4. Number of Hours Generator On Line 672 1416 148416.3
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 572712 1207672 122363306

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: March 3,2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: February 2003 Unit 2 operated at essentially full power through the entire month of February.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: March 3, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: February 2003 Number Date Typel Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor 3 Prevent Recurrence Unit 2 operated at essentially full power for the entire month of February.

I 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain)