November 2002 Monthly Operating Report for St. Lucie, Units 1 & 2
ML023460360
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/10/2002
From: Jernigan D
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2002-244
Download: ML023460360 (7)


Text

Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 December 10, 2002 3L L-2002-244 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the November 2002 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please,¢ntact us should there be any questions regarding this information.

Donald E. Jhnigan Vice President St. Lucie Plant DEJ/spt Attachments 4

an FPL Group company

DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit I DATE: December 2, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: November 2002

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net).. 839 MONTH -YTD CUMULATIVE
3. Number of Hours Reactor Critical 720 7439.5 184040
4. Number of Hours Generator On Line 720 7419.3 182206.3
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 615171 6279623 148956362

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie Unit I DATE: December 2, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: November 2002 Unit operated at essentially full power through the entire month of November.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Unit I DATE: December 2, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: November 2002 Number Date Type I Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence Unit I operated at essentially full power for the entire month of H November.

2 3 I Method F Forced Reason 1 - Manual S Scheduled A - Equipment Failure (Explain) 2 - Manual Scram B - Maintenance or Test 3 - Automatic Scram C - Refueling 4 - Continued D - Regulatory Restriction 5 - Load Reduction E - Operator Training & License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

DOCKET NO.: 50-389 UNIT NAME: St. Lucie Unit 2 DATE: December 2, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: November 2002

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 720 8001.4 148014.6
4. Number of Hours Generator On Line_ 720 7998.6 146256.3
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 609593 6792020 120522666

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: December 2, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: November 2002 Unit 2 operated at essentially full power through the entire month of November.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: December 2, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: November 2002 Number Date Type1 Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence Unit 2 operated at essentially full power for the entire month of November.

I 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain)

Text

Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 December 10, 2002 3L L-2002-244 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the November 2002 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please,¢ntact us should there be any questions regarding this information.

Donald E. Jhnigan Vice President St. Lucie Plant DEJ/spt Attachments 4

an FPL Group company

DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit I DATE: December 2, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: November 2002

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net).. 839 MONTH -YTD CUMULATIVE
3. Number of Hours Reactor Critical 720 7439.5 184040
4. Number of Hours Generator On Line 720 7419.3 182206.3
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 615171 6279623 148956362

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie Unit I DATE: December 2, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: November 2002 Unit operated at essentially full power through the entire month of November.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Unit I DATE: December 2, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: November 2002 Number Date Type I Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence Unit I operated at essentially full power for the entire month of H November.

2 3 I Method F Forced Reason 1 - Manual S Scheduled A - Equipment Failure (Explain) 2 - Manual Scram B - Maintenance or Test 3 - Automatic Scram C - Refueling 4 - Continued D - Regulatory Restriction 5 - Load Reduction E - Operator Training & License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

DOCKET NO.: 50-389 UNIT NAME: St. Lucie Unit 2 DATE: December 2, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: November 2002

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 720 8001.4 148014.6
4. Number of Hours Generator On Line_ 720 7998.6 146256.3
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 609593 6792020 120522666

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: December 2, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: November 2002 Unit 2 operated at essentially full power through the entire month of November.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: December 2, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: November 2002 Number Date Type1 Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence Unit 2 operated at essentially full power for the entire month of November.

I 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain)