Text

FENOC Beaver Valley Power Station P.O. Box4 Shippingport, PA 15077 FirstEnergyNuclear OperatingCompany Raymond A. Lieb 724-682-7773 Director,Site Operations Fax: 724-643-8069 September 14, 2009 L-09-245 10 CFR 54 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Supplemental Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC Nos. MD6593 and MD6594), and License Renewal Application Amendment No. 43 Reference 1 provided the FirstEnergy Nuclear Operating Company (FENOC) License Renewal Application (LRA) for the Beaver Valley Power Station (BVPS). Reference 2 provided Amendment No. 39 to Reference 1. Reference 3 provided Amendment No. 40 to Reference 1. This letter provides clarification and correction to information provided in References 2 and 3.

The Enclosure provides Amendment 43 to the BVPS LRA.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Clifford I. Custer, Fleet License Renewal Project Manager, at 724-682-7139.

I declare under penalty of perjury that the foregoing is true and correct. Executed on September _/IH, 2009.

Sincerely, Raymond A. Lieb

-A 0'9

Beaver Valley Power Station, Unit Nos. 1 and 2 L-09-245 Page 2

References:

1. FENOC Letter L-07-113, "License Renewal Application," August_27, 2007.
2. FENOC Letter L-09-205, "Supplemental Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC Nos.

MD6593 and MD6594), and License Renewal Application Amendment No. 39,"

July 28, 2009.

3. FENOC Letter L-09-242, "Supplemental Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC Nos.

MD6593 and MD6594), and License Renewal Application Amendment No. 40,"

September 2, 2009.

Enclosures:

Amendment No. 43 to the BVPS License Renewal Application cc: Mr. K. L. Howard, NRC DLR Project Manager Mr. S. J. Collins, NRC Region I Administrator cc: w/o Attachment or Enclosure Mr. B. E. Holian, NRC DLR Director Mr. D. L. Werkheiser, NRC Senior Resident Inspector Ms. N. S. Morgan, NRC DORL Project Manager Mr. D. J. Allard, PA BRP/DEP Director Mr. L. E. Ryan, PA BRP/DEP

ENCLOSURE Beaver Valley Power Station (BVPS), Unit Nos. 1 and 2 Letter L-09-245 Amendment No. 43 to the BVPS License Renewal Application Page 1 of 5 License Renewal Application Sections Affected Table A.4-1 Table A.5-1 The Enclosure identifies the correction by Affected License Renewal Application (LRA)

Section, LRA Page No., and Affected Paragraph and Sentence. The count for the affected paragraph, sentence, bullet, etc. starts at the beginning of the affected Section or at the top of the affected page, as appropriate. Below each section the reason for the change is identified, and the sentence affected is printed in italics with deleted text fined-ou and added text underlined.

Enclosure L-09-245 Page 2 of 5 Affected Paragraph Affected LRA Section LRA Page No. and Sentence Table A.4-1 Page A.4-9 Item No. 33.

LRA Table A.471, "Unit 1 License Renewal Commitments," is amended to clarify and correct Item No. 33, regarding examinations of the containment liner, as follows:

Item Commitment Implementation Source Related Section LRA No./

Number Schedule Cmet Comments 33 Supplemental volumetric Examinations FENOC None examinations will be performed on the will commence Letter Unit 1 containment liner. A minimum on-line, prior to L-09-205, of 8 (ene foot-*..... non-randomly the beginning of FENOC selected sample locations will be the Unit 1 Letter examined, focusing on areasmost Refueling L-09-242 likely to experience degradation based Outage in 2010.

on past operating experience (as Examinations and described in FENOC Letter L-09-242). will be FENOC If degradation is identified, it will be completed by Letter addressed through the corrective December 31, L-09-245 Iaction program. 2010

Enclosure L-09-245 Page 3 of 5 Affected Paragraph Affected LRA Section LRA Page No. and Sentence Table A.4-1 Page A.4-9 Item No. 34 LRA Table A.4-1, "Unit 1 License Renewal Commitments," is amended for Item No. 34, regarding examinations of the containment liner, as follows:

Related LRA Item Commitment Implementation Source Section No./

Number Schedule Comments 34 A summary of results for each phase January 29, FENOC None of volumetric testing (describedin 2016 Letter Unit I Commitments No. 32 and L-09-242 No. 33 in LRA Amendment No. 39,)

will be documented in a letter to the NRC. FENOC Letter L-09-245

Enclosure L-09-245 Page 4 of 5 Affected Paragraph Affected LRA Section LRA Page No. and Sentence Table A.5-1 Page A.5-10 Item No. 34 LRA Table A.5-1, "Unit 2 License Renewal Commitments," is amended to clarify and correct Item No. 34, regarding examinations of the containment liner, as follows:

Related LRA No.

Item Implementation Sectio Number Commitment Schedule Source Section No./

Comments 34 Supplemental volumetric May 27, 2027 FENOC None examinations will be performed on the Letter Unit 2 containment liner. A minimum L-09-205, of 8 (one*"e ..squa...non-randomly FENOC selected sample locations will be Letter examined, focusing on areas most L-09-242 likely to experience degradationbased on past operating experience (as and described in FENOC Letter L-09-242). FENOC If degradation is identified, it will be Letter addressed through the corrective L-09-245 action program.

Enclosure L-09-245 Page 5 of 5 Affected Paragraph Affected LRA Section LRA Page No. and Sentence Table A.5-1 Page A.5-10 Item No. 35 LRA Table A.5-1, "Unit 2 License Renewal Commitments," is amended for Item No. 35, regarding examinations of the containment liner, as follows:

Item Implementation Related LRA Number Commitment Schedule Source CmetNo./

Section Comments 35 A summary of results for each phase May 27, 2027 FENOC None of volumetric testing (describedin Letter Unit 2 Commitments No. 33 and L-09-242 No. 34 in LRA Amendment No. 39) will be documented in a letter to the NRC. FENOC Letter L-09-245