Letter Sequence Other |
---|
|
|
MONTHYEARML0914703542009-05-25025 May 2009 2009/05/25-Declaration of Arnold Gundersen Supporting Citizen Power'S Petition Project stage: Other ML0913906312009-06-0404 June 2009 ACRS Meeting with the U.S. Nuclear Regulatory Commission, - June 4, 2009, Slides Project stage: Request ML0915602002009-06-0808 June 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 Project stage: Meeting Press Release-09-105, NRC Issues Final Safety Evaluation Report for Beaver Valley Nuclear Power Plant License Renewal2009-06-0808 June 2009 Press Release-09-105: NRC Issues Final Safety Evaluation Report for Beaver Valley Nuclear Power Plant License Renewal Project stage: Request ML0919101342009-07-0101 July 2009 Citizen Power Ltr. Reply to June 17 Letter to Ted Robinson in Connection with Liner Degradation Problems at Beaver Valley Nuclear Station Project stage: Request ML0919007192009-07-0707 July 2009 Concerns Regarding the Containment Liner at Beaver Valley Power Station, Units 1 & 2 Project stage: Request ML0919604962009-07-15015 July 2009 Cover Letter for FENOC Report Project stage: Request ML0920405122009-07-21021 July 2009 G20090418/EDATS: OEDO-2009-0458 - Edwin M. Hackett Memo, Letter from Citizen Power and Beyond Nuclear Concerning the License Renewal for the Beaver Valley Power Station Project stage: Other ML0921806052009-07-30030 July 2009 Conference Call - Containment Liner Corrosion - July 30, 2009 Project stage: Request ML0921800382009-08-0606 August 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 Project stage: Meeting ML0921803782009-08-0606 August 2009 Transcript of NRC License Renewal Teleconference Held on July 16, 2009 Project stage: Meeting ML0921802142009-08-11011 August 2009 Docketing of NRC Telephone Conference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 Project stage: Other ML0921802062009-08-11011 August 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 Project stage: Meeting ML0921805572009-08-12012 August 2009 Conference Call - Containment Liner Corrosion - Friday, July 24, 2009 11:30 A.M Project stage: Request ML0925102262009-09-0808 September 2009 Docketing of U.S. Nuclear Regulatory Commission Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 & 2 Project stage: Meeting ML0925102542009-09-0808 September 2009 Transcript of U.S. Nuclear Regulatory Commission Teleconference Held on August 26, 2009 Project stage: Request ML0925102602009-09-0808 September 2009 Docketing of U.S. Nuclear Regulatory Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 Project stage: Meeting ML0925200672009-09-0909 September 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 Project stage: Meeting ML0925201662009-09-0909 September 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 (Enclosure) Project stage: Meeting L-09-245, Supplemental Information for the Review of License Renewal Application and Amendment No. 432009-09-14014 September 2009 Supplemental Information for the Review of License Renewal Application and Amendment No. 43 Project stage: Supplement ML0926704712009-09-22022 September 2009 G20090544/EDATS: OEDO-2009-0574 - Edwin M. Hackett Memo, Letter from Citizen Power (Theodore S. Robinson) Concerning the License Renewal for the Beaver Valley Power Station Project stage: Other ML0921807152009-10-24024 October 2009 G20090418/EDATS: OEDO-2009-0458/G20090544/EDATS: OEDO-2009-0574 - Theodore Robinson and David Hughes Ltrs. Letter from Citizen Power Concerning the License Renewal for the Beaver Valley Power Station and Liner Degradation Problems Project stage: Other ML0925700142009-10-31031 October 2009 Safety Evaluation Report Related to the License Renewal of Beaver Valley Power Station, Units 1 and 2 Project stage: Approval 2009-07-30
[Table View] |
|
---|
Category:Letter
MONTHYEARML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) ML23263A0192023-09-20020 September 2023 Operator Licensing Examination Approval ML23243A9272023-09-19019 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000334/20230022023-08-0909 August 2023 Integrated Inspection Report 05000334/2023002 and 05000412/2023002 ML23219A0592023-08-0707 August 2023 Steam Generator Inspection Reports - Spring 2023 Spring Refueling Outrage L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 ML23188A0982023-07-17017 July 2023 Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23188A0672023-07-10010 July 2023 Project Manager Assignment L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report ML23157A1072023-06-0707 June 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011 ML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report ML23124A3882023-05-16016 May 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Technical Specification 5.6.3, Core Operating Limits Reports (COLR) and TS 4.2.1 Fuel Assemblies ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000334/20230012023-05-0808 May 2023 Integrated Inspection Report 05000334/2023001 and 05000412/2023001 L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23118A3812023-04-28028 April 2023 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23107A2502023-04-18018 April 2023 Requalification Program Inspection 2024-01-25
[Table view] |
Text
October 24, 2009 Mr. Theodore Robinson, Esq. and Mr. David Hughes, Executive Director Citizen Power 2121 Murray Avenue Pittsburgh, PA 15217
Dear Mr. Robinson and Mr. Hughes:
On behalf of the U.S. Nuclear Regulatory Commission (NRC or the staff), I am responding to your letters dated July 1, 2009, (Agencywide Documents Access and Management System Accession Number ML091910134), July 7, 2009 (ML091900719), and August 27, 2009 (ML092460728), expressing your concern regarding the ability of the FirstEnergy Nuclear Operating Company (FENOC) inspection program to identify corrosion of the containment liner that originates from the outside surface of the liner.
The staff considers the degradation of the containment liner plate an important issue since the liner plate in conjunction with the concrete behind the liner provides an essentially leak tight pressure barrier during all postulated accident conditions. Following the identification of liner corrosion in April 2009 the applicant replaced the affected area containing the defect in accordance with the requirements of the code used for construction of the containment liner.
The NRC license renewal staff issued a request for additional information (ML091260025) on May 7, 2009, to verify that FENOC would incorporate the recent plant-specific operating experience related to the liner degradation into its American Society of Mechanical EngineersSection XI, Subsection IWE aging management program. Since that time, NRC staff has had several conference calls and requested additional information about FENOCs proposed corrective actions that will be implemented to address the Beaver Valley Power Station (BVPS),
Unit 1, liner plate degradation.
The staffs evaluation of FENOCs proposed corrective actions, including the visual and volumetric examination, is addressed in Safety Evaluation Report Related to the License Renewal of the Beaver Valley Power Station, Units 1 and 2, which was issued on June 8, 2009 (ML091600216). In addition, the staff has issued Supplement 1 to the BVPS, Units 1 and 2, Safety Evaluation Report (SER), dated October 6, 2009 (ML092520531), which evaluates supplemental information provided by FENOC related to their liner inspection program. Based on the staffs evaluation described in the supplement to the SER, the staff has concluded that the commitments made by the applicant for the visual and volumetric examinations of the liner plate are acceptable and provide reasonable assurance that the containment liner plate at BVPS, Units 1 and 2, will continue to remain functional during the period of extended operation.
A copy of the SER supplement (Enclosure 1) is attached for your information. The NRC staff has also prepared a response to the specific issues identified in your letters (Enclosure 2).
T. Robinson, et al. Thank you for your comments. I understand that the Division of License Renewal staff highlighted your organizations comments at the recent Advisory Committee on Reactor Safeguards (ACRS) meeting (in particular, your comment which the staff incorporated into the SER regarding utilizing random sampling only to verify a 95/95 confidence level). It is also important to note that the NRC staff will brief the ACRS on the impact of the containment liner corrosion on the current licensing basis of the plant in a future meeting. If you should have additional questions regarding the recently issued Supplement 1 to the BVPS, Units 1 and 2, license renewal SER, please contact Mr. Brian E. Holian, Director of the Division of License Renewal by telephone at 301-415-1183.
Sincerely,
/RA/
Eric J. Leeds, Director Office of Nuclear Reactor Regulation
Enclosures:
- 1. Supplement 1 to the Beaver Valley Power Station, Units 1 and 2, Safety Evaluation Report
- 2. Response to the Questions in Citizen Powers August 27, 2009 Letter cc: Mr. Mike Banko Listserv
ML092230728 (Package) ML092040512 (G20090418 Incoming)
ML092670471 (G20090544 Incoming) ML092180715 (Response)
ML092570014 (Enclosure 1) ML092930500 (Enclosure 2)
- concurred via e-mail OFFICE PM:RPB2:DLR LA:DLR BC:RPB2:DLR BC:DRS:RI NAME KHoward SFigueroa DWrona RConte*
DATE 10/19/09 10/19/09 10/19/09 10/14/09 OFFICE OGC D:NRR:DLR D:NRR NAME LSubin BHolian(SLee for) ELeeds DATE 10/19/09 10/19/09 10/24/09
Letter to Theodore Robinson, et al. from Eric J. Leeds dated October 24, 2009 DISTRIBUTION: G20090544/EDATS: OEDO-2009-0574 G20090418/EDATS: OEDO-2009-0458 HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsAcrsACNW_MailCTR Resource RidsEdoMailCenter Resource RidsNrrMailCenter Resource RidsNrrOd Resource RIdsNrrAdes Resource RidsNrrAdro Resource RidsNroOd Resource RidsResOd Resource RidsRgn1MailCenter Resource
KHoward NMorgan MModes, RI PCataldo, RI DWerkheiser, RI
REFERENCES
- 1. Oak Ridge National Laboratory Report, ORNL/TM-2005/520, Final Report Inspection of Aged/Degraded Containments Program.
- 2. Electric Power Research Institute (EPRI) Report TR-107514, Age Related Degradation Inspection Method and Determination.
Beaver Valley Power Station Units 1 and 2 cc:
Mr. Joseph J. Hagan Manager, Fleet Licensing President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 Mail Stop A-GO-19 76 South Main Street 76 South Main Street Akron, OH 44308 Akron, OH 44308 Director, Fleet Regulatory Affairs Mr. James H. Lash FirstEnergy Nuclear Operating Company Senior Vice President of Operations Mail Stop A-GO-2 and Chief Operating Officer 76 South Main Street FirstEnergy Nuclear Operating Company Akron, OH 44308 Mail Stop A-GO-14 76 South Main Street Manager, Site Regulatory Compliance Akron, OH 44308 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mr. Danny L. Pace Mail Stop A-BV-A Senior Vice President, Fleet Engineering P.O. Box 4, Route 168 FirstEnergy Nuclear Operating Company Shippingport, PA 15077 Mail Stop A-GO-14 76 South Main Street Regional Administrator, Region I Akron, OH 44308 U.S. Nuclear Regulatory Commission 475 Allendale Road Ms. Jeannie M. Rinckel King of Prussia, PA 19406 Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Resident Inspector Mail Stop A-GO-14 U.S. Nuclear Regulatory Commission 76 South Main Street P.O. Box 298 Akron, OH 44308 Shippingport, PA 15077 Mr. Paul A. Harden Mr. Cliff Custer Vice President, Nuclear Support FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-GO-14 P.O. Box 4, Route 168 76 South Main Street Shippingport, PA 15077 Akron, OH 44308 Mr. Steve Dort Mr. David W. Jenkins, Attorney FirstEnergy Nuclear Operating Company FirstEnergy Corporation Beaver Valley Power Station Mail Stop A-GO-15 P.O. Box 4, Route 168 76 South Main Street Shippingport, PA 15077 Akron, OH 44308
Beaver Valley Power Station Units 1 and 2 cc:
Mr. Mike Banko FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077