Letter Sequence Other |
---|
|
|
MONTHYEARML0914703542009-05-25025 May 2009 2009/05/25-Declaration of Arnold Gundersen Supporting Citizen Power'S Petition Project stage: Other ML0913906312009-06-0404 June 2009 ACRS Meeting with the U.S. Nuclear Regulatory Commission, - June 4, 2009, Slides Project stage: Request ML0915602002009-06-0808 June 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 Project stage: Meeting Press Release-09-105, NRC Issues Final Safety Evaluation Report for Beaver Valley Nuclear Power Plant License Renewal2009-06-0808 June 2009 Press Release-09-105: NRC Issues Final Safety Evaluation Report for Beaver Valley Nuclear Power Plant License Renewal Project stage: Request ML0919101342009-07-0101 July 2009 Citizen Power Ltr. Reply to June 17 Letter to Ted Robinson in Connection with Liner Degradation Problems at Beaver Valley Nuclear Station Project stage: Request ML0919007192009-07-0707 July 2009 Concerns Regarding the Containment Liner at Beaver Valley Power Station, Units 1 & 2 Project stage: Request ML0919604962009-07-15015 July 2009 Cover Letter for FENOC Report Project stage: Request ML0920405122009-07-21021 July 2009 G20090418/EDATS: OEDO-2009-0458 - Edwin M. Hackett Memo, Letter from Citizen Power and Beyond Nuclear Concerning the License Renewal for the Beaver Valley Power Station Project stage: Other ML0921806052009-07-30030 July 2009 Conference Call - Containment Liner Corrosion - July 30, 2009 Project stage: Request ML0921800382009-08-0606 August 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 Project stage: Meeting ML0921803782009-08-0606 August 2009 Transcript of NRC License Renewal Teleconference Held on July 16, 2009 Project stage: Meeting ML0921802142009-08-11011 August 2009 Docketing of NRC Telephone Conference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 Project stage: Other ML0921802062009-08-11011 August 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 Project stage: Meeting ML0921805572009-08-12012 August 2009 Conference Call - Containment Liner Corrosion - Friday, July 24, 2009 11:30 A.M Project stage: Request ML0925102262009-09-0808 September 2009 Docketing of U.S. Nuclear Regulatory Commission Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 & 2 Project stage: Meeting ML0925102542009-09-0808 September 2009 Transcript of U.S. Nuclear Regulatory Commission Teleconference Held on August 26, 2009 Project stage: Request ML0925102602009-09-0808 September 2009 Docketing of U.S. Nuclear Regulatory Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 Project stage: Meeting ML0925200672009-09-0909 September 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 Project stage: Meeting ML0925201662009-09-0909 September 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 (Enclosure) Project stage: Meeting L-09-245, Supplemental Information for the Review of License Renewal Application and Amendment No. 432009-09-14014 September 2009 Supplemental Information for the Review of License Renewal Application and Amendment No. 43 Project stage: Supplement ML0926704712009-09-22022 September 2009 G20090544/EDATS: OEDO-2009-0574 - Edwin M. Hackett Memo, Letter from Citizen Power (Theodore S. Robinson) Concerning the License Renewal for the Beaver Valley Power Station Project stage: Other ML0921807152009-10-24024 October 2009 G20090418/EDATS: OEDO-2009-0458/G20090544/EDATS: OEDO-2009-0574 - Theodore Robinson and David Hughes Ltrs. Letter from Citizen Power Concerning the License Renewal for the Beaver Valley Power Station and Liner Degradation Problems Project stage: Other ML0925700142009-10-31031 October 2009 Safety Evaluation Report Related to the License Renewal of Beaver Valley Power Station, Units 1 and 2 Project stage: Approval 2009-07-30
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000334/20240112024-10-17017 October 2024 License Renewal Phase IV Inspection Report 05000334/2024011 ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report ML24260A1912024-09-16016 September 2024 Operator Licensing Examination Approval IR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000334/20240022024-08-0505 August 2024 Integrated Inspection Report 05000334/2024002 and 05000412/2024002 ML24208A0462024-07-26026 July 2024 NRC Office of Investigations Case No. 1-2023-005 L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 05000334/LER-2024-004, Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control2024-07-17017 July 2024 Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models ML24193A2912024-07-16016 July 2024 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule IR 05000334/20245012024-07-0808 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000334/2024501 and 05000412/2024501 05000334/LER-2024-003, Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping2024-07-0202 July 2024 Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report IR 05000334/20244012024-06-26026 June 2024 Material Control and Accounting Program Inspection Report 05000334/2024401 and 05000412/2024401 (Cover Letter Only) L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations 05000334/LER-2024-002, Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation2024-06-11011 June 2024 Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation 05000334/LER-2024-001, Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification2024-06-0606 June 2024 Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification ML24135A2282024-05-29029 May 2024 Review of the Spring 2023 Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F Star Reports ML24135A1702024-05-29029 May 2024 – Steam Generator Tube Inspection - Review of the Spring 2023 Tube Inspection Reports L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24141A1052024-05-20020 May 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000334/20240102024-05-15015 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000334/2024010 and 05000412/2024010 L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair IR 05000334/20240012024-05-0808 May 2024 Integrated Inspection Report 05000334/2024001 and 05000412/2024001 L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 ML24101A2752024-04-10010 April 2024 Response to Request for Additional Information Regarding Spring 2023 180-Day Steam Generator Tube Inspection Report L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24044A0662024-03-0404 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0083 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee 05000412/LER-2023-003-01, Missile Barrier Door Left Open Resulting in a Loss of Safety Function2024-02-20020 February 2024 Missile Barrier Door Left Open Resulting in a Loss of Safety Function IR 05000334/20230042024-02-12012 February 2024 Integrated Inspection Report 05000334/2023004 and 05000412/2023004 ML24025A0922024-01-25025 January 2024 Requalification Program Inspection 2024-09-17
[Table view] |
Text
October 24, 2009 Mr. Theodore Robinson, Esq. and Mr. David Hughes, Executive Director Citizen Power 2121 Murray Avenue Pittsburgh, PA 15217
Dear Mr. Robinson and Mr. Hughes:
On behalf of the U.S. Nuclear Regulatory Commission (NRC or the staff), I am responding to your letters dated July 1, 2009, (Agencywide Documents Access and Management System Accession Number ML091910134), July 7, 2009 (ML091900719), and August 27, 2009 (ML092460728), expressing your concern regarding the ability of the FirstEnergy Nuclear Operating Company (FENOC) inspection program to identify corrosion of the containment liner that originates from the outside surface of the liner.
The staff considers the degradation of the containment liner plate an important issue since the liner plate in conjunction with the concrete behind the liner provides an essentially leak tight pressure barrier during all postulated accident conditions. Following the identification of liner corrosion in April 2009 the applicant replaced the affected area containing the defect in accordance with the requirements of the code used for construction of the containment liner.
The NRC license renewal staff issued a request for additional information (ML091260025) on May 7, 2009, to verify that FENOC would incorporate the recent plant-specific operating experience related to the liner degradation into its American Society of Mechanical EngineersSection XI, Subsection IWE aging management program. Since that time, NRC staff has had several conference calls and requested additional information about FENOCs proposed corrective actions that will be implemented to address the Beaver Valley Power Station (BVPS),
Unit 1, liner plate degradation.
The staffs evaluation of FENOCs proposed corrective actions, including the visual and volumetric examination, is addressed in Safety Evaluation Report Related to the License Renewal of the Beaver Valley Power Station, Units 1 and 2, which was issued on June 8, 2009 (ML091600216). In addition, the staff has issued Supplement 1 to the BVPS, Units 1 and 2, Safety Evaluation Report (SER), dated October 6, 2009 (ML092520531), which evaluates supplemental information provided by FENOC related to their liner inspection program. Based on the staffs evaluation described in the supplement to the SER, the staff has concluded that the commitments made by the applicant for the visual and volumetric examinations of the liner plate are acceptable and provide reasonable assurance that the containment liner plate at BVPS, Units 1 and 2, will continue to remain functional during the period of extended operation.
A copy of the SER supplement (Enclosure 1) is attached for your information. The NRC staff has also prepared a response to the specific issues identified in your letters (Enclosure 2).
T. Robinson, et al. Thank you for your comments. I understand that the Division of License Renewal staff highlighted your organizations comments at the recent Advisory Committee on Reactor Safeguards (ACRS) meeting (in particular, your comment which the staff incorporated into the SER regarding utilizing random sampling only to verify a 95/95 confidence level). It is also important to note that the NRC staff will brief the ACRS on the impact of the containment liner corrosion on the current licensing basis of the plant in a future meeting. If you should have additional questions regarding the recently issued Supplement 1 to the BVPS, Units 1 and 2, license renewal SER, please contact Mr. Brian E. Holian, Director of the Division of License Renewal by telephone at 301-415-1183.
Sincerely,
/RA/
Eric J. Leeds, Director Office of Nuclear Reactor Regulation
Enclosures:
- 1. Supplement 1 to the Beaver Valley Power Station, Units 1 and 2, Safety Evaluation Report
- 2. Response to the Questions in Citizen Powers August 27, 2009 Letter cc: Mr. Mike Banko Listserv
ML092230728 (Package) ML092040512 (G20090418 Incoming)
ML092670471 (G20090544 Incoming) ML092180715 (Response)
ML092570014 (Enclosure 1) ML092930500 (Enclosure 2)
- concurred via e-mail OFFICE PM:RPB2:DLR LA:DLR BC:RPB2:DLR BC:DRS:RI NAME KHoward SFigueroa DWrona RConte*
DATE 10/19/09 10/19/09 10/19/09 10/14/09 OFFICE OGC D:NRR:DLR D:NRR NAME LSubin BHolian(SLee for) ELeeds DATE 10/19/09 10/19/09 10/24/09
Letter to Theodore Robinson, et al. from Eric J. Leeds dated October 24, 2009 DISTRIBUTION: G20090544/EDATS: OEDO-2009-0574 G20090418/EDATS: OEDO-2009-0458 HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsAcrsACNW_MailCTR Resource RidsEdoMailCenter Resource RidsNrrMailCenter Resource RidsNrrOd Resource RIdsNrrAdes Resource RidsNrrAdro Resource RidsNroOd Resource RidsResOd Resource RidsRgn1MailCenter Resource
KHoward NMorgan MModes, RI PCataldo, RI DWerkheiser, RI
REFERENCES
- 1. Oak Ridge National Laboratory Report, ORNL/TM-2005/520, Final Report Inspection of Aged/Degraded Containments Program.
- 2. Electric Power Research Institute (EPRI) Report TR-107514, Age Related Degradation Inspection Method and Determination.
Beaver Valley Power Station Units 1 and 2 cc:
Mr. Joseph J. Hagan Manager, Fleet Licensing President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 Mail Stop A-GO-19 76 South Main Street 76 South Main Street Akron, OH 44308 Akron, OH 44308 Director, Fleet Regulatory Affairs Mr. James H. Lash FirstEnergy Nuclear Operating Company Senior Vice President of Operations Mail Stop A-GO-2 and Chief Operating Officer 76 South Main Street FirstEnergy Nuclear Operating Company Akron, OH 44308 Mail Stop A-GO-14 76 South Main Street Manager, Site Regulatory Compliance Akron, OH 44308 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mr. Danny L. Pace Mail Stop A-BV-A Senior Vice President, Fleet Engineering P.O. Box 4, Route 168 FirstEnergy Nuclear Operating Company Shippingport, PA 15077 Mail Stop A-GO-14 76 South Main Street Regional Administrator, Region I Akron, OH 44308 U.S. Nuclear Regulatory Commission 475 Allendale Road Ms. Jeannie M. Rinckel King of Prussia, PA 19406 Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Resident Inspector Mail Stop A-GO-14 U.S. Nuclear Regulatory Commission 76 South Main Street P.O. Box 298 Akron, OH 44308 Shippingport, PA 15077 Mr. Paul A. Harden Mr. Cliff Custer Vice President, Nuclear Support FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-GO-14 P.O. Box 4, Route 168 76 South Main Street Shippingport, PA 15077 Akron, OH 44308 Mr. Steve Dort Mr. David W. Jenkins, Attorney FirstEnergy Nuclear Operating Company FirstEnergy Corporation Beaver Valley Power Station Mail Stop A-GO-15 P.O. Box 4, Route 168 76 South Main Street Shippingport, PA 15077 Akron, OH 44308
Beaver Valley Power Station Units 1 and 2 cc:
Mr. Mike Banko FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077