L-03-184, October 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2

From kanterella
(Redirected from L-03-184)
Jump to navigation Jump to search
October 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2
ML033230397
Person / Time
Site: Beaver Valley
Issue date: 11/07/2003
From: Pearce L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-03-184
Download: ML033230397 (6)


Text

- 9FENOC rr'FMjctewOpetaftip. _aan Beaver Valley Power Station P. 0. Box 4 Shippingport, PA 15077 L-03-184 November 7, 2003 Beaver Valley Power Station Unit I - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50412, License No. NPF-73

- --______- -Monthly-Operating Repoft--- _-

U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is subumitted for. Unit I and Unit 2 for the month of October, 2003. No regulatory commitnents are contained in this submittal.

Respectfully L. W. Pearce Vice-President BVPS DTJ/cmg Enclosures cc: NRC Regional Office.

King-of-Prussia, PA; : t  ;.  : ,. . . . .

  • . ,* , *. * * . T

A I . . II . .

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE November 3, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: October 2003 Date Type Duration Reason Method of Cause I Corrective Actions No. (Y/MID) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE.

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3 - Automatic Trip I Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

OPERATING DATA REPORT

  • DOCXET NO.: 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 11/03/03 COMPLETED BY: DAVID T. ZONES TELEPHONE:  :(724) 682-4962
  • Notes: Rated thermal power at
  • la. REPORTING PERIOD: OCTOBER 2003
  • BVPS-1 was uprated from 2652 MWt*
1. DESIGN ELECTRICAL RATING (Net MWe): 835
  • to 2689 MWt on 10/20/01. Net
  • MDC was also uprated from
2. MAX. DEPENDABLE CAPACITY (Net MWe): 821 *-810 iie to 821 MWe.
  • * - - * * *t * - * * * * **H *
  • d*
  • THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 745.0 7296.0 241080.0
3. NO. OF ERS. REACTOR WAS CRITICAL: 745.0 5995.5 166587.0
4. SERVICE HOURS GENERATOR ON LINE: 745.0 5948.9 164060.9
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (MWH): 627100.0 4784999.0 123441006.0
7. GROSS ELECT. ENERGY GEN. (MWH): 663120.0 5076437.0 131746027.0
8. GROSS THERMAL ENERGY GEN. (MWH): 2001020.0 15463022.0 405734331.5
9. UNIT AVAILABILITY FACTOR (b): 100.0 81.5 69.5
10. UNIT CAPACITY FACTOR (MDC) (%): 102.5 79.9 65.0
11. UNIT FORCED OUTAGE RATE (%): 0.0 1.0 15.2

so UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE November 3, 2003 O. b. 20 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: October 2003 No. Date Type Duration Reason Method of Cause / Corrective Actions (Y/M/D) F: Forced (Hours) (1) Shutting

_ _______ S: Scheduled Down (2) Comments 1 031001 S 262.3 C 4 The Unit was shut down for its planned 1 0th refueling outage on 9/13/03. The Unit completed its refueling outage on 10/11/03.

. -. 031014 __F 27.8-. -A 3____ -While reducing output from 65%to 30% in order to repair a leaking seal vent line connection on the Heater Drain Pumps, an automatic reactor trip occurred at approximately 39% output due to low level in the UB' Steam Generator. The low-level in the 'B" Steam Generator was caused by failure of a multiplier/divider card in the 'B' feedwater flow control loop. The card was replaced, and the Unit was returned to service.

(1) Reason (2) Method A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3 - Automatic Trip I Scram D - Regulatory Restriction 4 - Continuation E - Operator Training I Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

____~~~___~~~ -- - -- - - - --- - -- - -- - - --- -- - -- --- - -- -- - - - -- - - - -_- - - - -

SUMMARY

-~- ---- -- - ---

The Unit began the report period shut down in Mode 6 during its planned 1 oth refueling outage.

Mode 5 was entered 0004 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> on 10/5/03. The Unit began to heat up entering Mode 4 at 1209 hours0.014 days <br />0.336 hours <br />0.002 weeks <br />4.600245e-4 months <br /> on 10/9/03. Mode 3 was entered at 0255 hours0.00295 days <br />0.0708 hours <br />4.21627e-4 weeks <br />9.70275e-5 months <br /> on 10/10/03. Mode 2 was entered at 0944 hours0.0109 days <br />0.262 hours <br />0.00156 weeks <br />3.59192e-4 months <br /> and the reactor was taken critical at 1041 hours0.012 days <br />0.289 hours <br />0.00172 weeks <br />3.961005e-4 months <br /> on 10/11/03. Mode 1 was entered at 1851 hours0.0214 days <br />0.514 hours <br />0.00306 weeks <br />7.043055e-4 months <br /> on 10/11/03. The Unit was synchronized to the electrical grid at 2220 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.4471e-4 months <br /> on 10/11/03 officially ending the 1 oth refueling outage. Output was then escalated to the 30% power plateau for fuel preconditioning and to obtain core power distribution data for startup testing. Following completion of a flux map, the Unit began power ascension to the 75% power plateau at 1540 hours0.0178 days <br />0.428 hours <br />0.00255 weeks <br />5.8597e-4 months <br /> on 10/12/03 for fuel preconditioning. Power ascension was suspended at approximately 31% output at 1750 hours0.0203 days <br />0.486 hours <br />0.00289 weeks <br />6.65875e-4 months <br /> on 10/12/03 in order to repair an oil leak from the WA" Heater Drain Pump upper bearing lube oil cooler. Upon completion of repairs, power ascension to 75% output was resumed at 0458 hours0.0053 days <br />0.127 hours <br />7.572751e-4 weeks <br />1.74269e-4 months <br /> on 10/13/03. Power ascension was halted at approximately 65% output at 2125 hours0.0246 days <br />0.59 hours <br />0.00351 weeks <br />8.085625e-4 months <br /> on 10/13/03 in order to repair a seal leak on the 'B" Main Feedwater Pump, and to obtain additional core power

6; UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE November 3,2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: October 2003 distribution data for startup testing. Following completion of a flux map, the Unit began to reduce output at 2140 hours0.0248 days <br />0.594 hours <br />0.00354 weeks <br />8.1427e-4 months <br /> on 10/14/03 from approximately 65% to 30% in order to repair a leaking seal vent line connection on both the "A" and "B" Heater Drain Pumps. During the power reduction, an automatic reactor trip occurred at 2356 hours0.0273 days <br />0.654 hours <br />0.0039 weeks <br />8.96458e-4 months <br /> on 10/14/03 while at approximately 39% output due to low level in the 'B" Steam Generator. The Unit was subsequently stabilized in Mode 3. The low level in the "B" Steam Generator was caused by failure of a multiplier/divider card in the 1B" feedwater flow control loop. Upon replacement of the card and evaluation of the trip, the Unit began to startup, entering Mode 2 at 2343 hours0.0271 days <br />0.651 hours <br />0.00387 weeks <br />8.915115e-4 months <br />

-on-10/15/03. -The-reactor-was -taken critical at.0028 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br /> and Mode 1 was entered.at..0120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> on 10/16/03. The Unit was synchronized to the electrical grid at 0343 hours0.00397 days <br />0.0953 hours <br />5.671296e-4 weeks <br />1.305115e-4 months <br /> on 10/16/03 and output was escalated to the 30% power plateau. Repair of the seal leak on the MB" main Feedwater Pump and repair of the leaking seal vent line connections on both the 'A" and "B" Heater Drain Pumps were verified completed, however, output could not be raised beyond 30% until chemistry conditions in the Steam Generators were within operating specifications.

Once chemistry conditions in all three Steam Generators were within specifications, power ascension to the 90% power plateau was begun at I 143 hours0.00166 days <br />0.0397 hours <br />2.364418e-4 weeks <br />5.44115e-5 months <br /> on 10/16/03. Power ascension was halted at approximately 61% output at 0148 hours0.00171 days <br />0.0411 hours <br />2.44709e-4 weeks <br />5.6314e-5 months <br /> on 10/17/03 in order to repair the pump inboard seal housing interference on the "B" Main Feedwater Pump. Following repairs to the "B" Main Feedwater Pump, power ascension to the 90% power plateau was resumed at 2218 hours0.0257 days <br />0.616 hours <br />0.00367 weeks <br />8.43949e-4 months <br /> on 10/18/03. Power ascension was halted at approximately 86% output at 1056 hours0.0122 days <br />0.293 hours <br />0.00175 weeks <br />4.01808e-4 months <br /> on 10/19/03 in order to perform calibration of nuclear instrumentation. Following this calibration, the Unit resumed power ascension at 2015 hours0.0233 days <br />0.56 hours <br />0.00333 weeks <br />7.667075e-4 months <br /> on 10/19/03. Power ascension was halted at approximately 92% output at 2226 hours0.0258 days <br />0.618 hours <br />0.00368 weeks <br />8.46993e-4 months <br /> on 10/19/03 in order to perform a heat balance and to adjust the power range nuclear instrumentation. Following this adjustment, the Unit commenced to increase output to full power at 0220 hours0.00255 days <br />0.0611 hours <br />3.637566e-4 weeks <br />8.371e-5 months <br /> on 10/20/03. A nominal value of 100% output was achieved at 0644 hours0.00745 days <br />0.179 hours <br />0.00106 weeks <br />2.45042e-4 months <br /> on 10/20/03. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

A OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BVPS UNIT #2 REPORT DATE: 11/03/03 COMPLETED BY: DAVID T. JONES 1, TELEPHONE: (724) 682-4962

. % .. . , ~~** * * * * * * * * * * * * * * * * .

la. REPORTING PERIOD: OCTOBER 2003

  • N Rated thermal power at *
  • BVPS-2 was uprated from 2652 MWt*
1. DESIGN ELECTRICAL RATING (Net MWe): 836
  • to 2689 Mwt on 10/30/01. Net *
  • MDC was also uprated from *
2. MAX. DEPENDABLE CAPACITY (Net MWe): 831
  • 820 MWe to 831 MWe.
  • THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 745.0 7296.0 139863.0
3. NO. OF HRS. REACTOR WAS CRITICAL: 469.8 6589.4 116144.5
4. SERVICE HOURS GENERATOR ON LINE: 454.9 6573.9 115400.4
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (MWH): 307418.0 5396911.0 90579314.0
7. GROSS ELECT. ENERGY GEN. (MWH): 329784.0 5684734.0 95716779.0
8. GROSS THERMAL ENERGY GEN. (MWH): 1019110.0 17328185.0 291927796.0
9. UNIT AVAILABILITY FACTOR (%): 61.1 90.1 82.5
10. UNIT CAPACITY FACTOR (MDC) (M): 49.7 89.0 78.6
11. UNIT FORCED OUTAGE RATE (%): 5.8 0.4 9.3