JAFP-85-0343, Monthly Operating Rept for Mar 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1985
ML20115C886
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/31/1985
From: Jackie Cook, Glovier H
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
JAFP-85-0343, JAFP-85-343, NUDOCS 8504180603
Download: ML20115C886 (12)


Text

- .__ _ _ _ _ - _ _ _ _ _

OPERATING DATA REPORT DOCKET NO. 50-333 J DATE April 1985 COMPLETED BY J. Cook TELEPHONE (315)342-J840 l OPERAT!NC STATUS

1. Unit Names t-- - A_ re..s..,v,k i Notes
2. Reporting Periods - musni atntti  :
3. Licensed Thermal Power (Mt): SAu  :  :
4. Nameplate Rating (Cross We): mat  :

S. Design Electrical Rating (Net MWe): art  :

4.. Maximum Dependable Capacity (Gross MWebs_atn

7. Maximum Dependable Capacity (Not MWe): ain
8. If Changes Occur in Capacity Ratings (Items 3 Through 7) Since Last Report.Give Reasons:

ME

9. Power Level To Which Restricted. If Any (Net MWe): unvr
10. Reasons For Restrictions. If Any This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period n1 Stan minst
12. Number of Hours Reactor Was critical n inaa a anvis a
13. Reactor Reserve Shutdown Hours n n n
14. Nours Generator On-Line n -

inas a tanti t i 15.~ Unit Reserve shutdown Hours a n n '

16. Cross Thermal Er. orgy Generated (NWH) n stamass i suaAsma
17. Cross Electrical Energy Generated (MWH) n assasa Att us tn
18. Net Electrical Energy Generated (NWW) n mAus t A t umn
19. Unit Service Factor a en a an A
20. Unit Availability Factor n en a se.a
21. Unit Capacity Factor (Using MDC Net) n Am t st_,
22. Unit Capacity Factor (Using DER Net) n Av , te 9
23. Unit Forced Outage Rate n n it.s
24. Shutdowns Scheduled Over Next 6 Honths (Type. Date and Duration of Each):
25. If Shut Down At End of Report Period. Estimated Date of Startups v7 a tems 26 Units In Test Status (Prior to Commercial Operation): Forecast Achieved j INIT!AL CRIT!CALITY I INITIAL ELECTRICITY COW ERCIAL OPERATION i

3 4

y' ,

  • *, AVERACE DAILY UNIT POWER LEVEL D0CEET No. 50 333 ..

UNIT FITZPATRICK DATE April 1985 ^

COMPLETED BY J.' Cook TELEPHONE (315)342 3840 i

MONTM MARCH 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Met) (NWo Not) 1 17 2 18 3 19 4 20 5 21  ;

6 22

. . i 7 23 8 24 9 25

^

10 26 ,

11 27 12 28 13 29 14 30 15 31 16  !

5tfMMARY: The Titaratrick plant remained shutdown for refueling for this entire reportinA Period. l i

UNIT SEUTDOMCS ANL FOWER REDUCTIOgiS DOCKET NO. 50-333

  • UNIT MADE Fitzpatrick '

DATE APRIL 1985 REPORT N0ttTR C0ffLk.TED BY J. c a TELETHOWE 313 342-Je40 h

E :n LICENSEE Si ha -CAUSE-& CORRECTIVE NO. DATE E3 h$ 8 'SU" EVENT $$ $$" ACTION TO N g$ h { REPORT f U . PREVENT RECURRENCE 3 850214 S 744 C 3 85-006 TB N/A Shutdown for refueling (cumulative hrs. 1063.2) l x

! 1 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A-Equipment Failure (E.cplain) 1-Manual. for Peparation of Data B-Maintenance of Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File NUREG D-Regulatory Restrict *on 4-Other(Explain) 0161 E-Operator Training & License Fummination F-Administrative G-Operational Error (Eplain)

H-Other(Explain) l w , , , - , , - , -- - m-- .w w- , - , - - - , -v,- r -, , , , . , - - - -

n -- - , - --- - ,

~ ~

f.

~

,xg.

i NARRATIVE SilMMARY OF OPERATING EXPERIENCE March 1985 7 r

i The FitzPatrick plant remained shutdown for this entire reporting period ,

. to support refueling operations. Estimated date of startup is May 6,  !

l 1985. t I

i I

s k

I i

k l

~, _ - . - _ _ _

NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT f .

MAINTENANCE

SUMMARY

MARCH 1985 I

ACTION TAKEN REPAIR EORK REOCEST NO. HOW CAUSE OF RESULTS OF TO PRECLLTE TIME DATE STSTEM C0"PONENT No. DETECTED MALFUNCTION MALFUNCTION RECURRENCE UOURS 850235 02 038657 I&C N/A INSPECT / PLACE PINS PUT #1 NEAR INSTR, 2 DPT-116 RDIOVED #2 & 3 850316 03 035644 OPS BROKEN INDICATOR DOESN'T LIGHT FOR REPLACED INDICATOR 2 CRD-22-11 CONTROL ROD 22-11 850315 03 023221 ISC DEFECTIVE CAUCE PRESSURE INDICAT0li REPLACED GAUCE 4 PI-131 FOR HCU 14-43 STICKS 850316 05 023135 I&C BAD TRANSFORMER DRAW SPARE AND REPLACED TRANSFORMER / 80 RPS. EPA SP CALIBRATE PER CALIBRATED PER ISP-ISP-94 850316 05 023193 I&C TRANSTORMER USED REPLACE PO'iER REPLACED TRANSFORMER 4 RPS-EPA FOR 05/23135 SUPPLY TRANSFORMEE 850325 13 038654 I&C N/A INSPECT /RE? LACE PUT #3 NEAR INSTR, .5 DPT-83/84 SNUBBER FINS REMOVED #1 & 2 850325 13 038655 I&C TAPE IN VACL'UM INSIDE OF VACL'L'MED D/P CELLS 12 DFT-67/84 FITTINGS T G SMITTERS 850329 16-1 038757 I&C DRIFT OUT OF PROCEDURAL ALIGNMENT OF QUARTZ 18 DPIT-102 - -

TOLERANCE SENSOR

7 NEW YORK POWEP AITTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLAffr l MAINTENANCE SL M Y l MARCH 1985 l

i ACTION TAKEN REPAIR WORK REOUEST NO. HOW CAUSE OF RESULTS OF TO PRECLLTE TIME DATE SYSTEM CO'iPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 1

850328 16-1 038763 I&C WEAR VERNIER LOCK TICHTEhD STLT THAT 6 DPIT-101 LOOSE HOLDS LOCK 850323 17 033722 OPS B RAD MONITOR A & B MONITORS ADJUSTED RECORDER 32.5 RR-433 OUT OF ADJUSTMT NOT IN AGREEMENT ZERO & SPAN l 850325 23 038656 I&C N/A INSPECT SNUBBERS PUT #3 NEAR INSTR .5 l DPT-76/77 PINS REMOVED #2 & 1 850323 76 035587 OPS FUSE PULLED ON ALARM CIRCUIT CLEARED MARK-UP/ 6 MPK-3 ZH-30 GROUND FAULT REINSTALLED FUSE 850301 93 023212 I&C METER.OUT OF TROUBLESHOOT AND REPLACED 93-RPM-C 8 RPM-C TOLERANCE REPAIR AND CALIBRATED

-, y 7 .

%) +7 - T ,  : 4: 2." .

W

~

Mi .NEW W)RK POWER AUm0RITY ,

! JAMES A. FITZPATRICK NU1 EAR IGER FIANT {

'i~- SAFETY RE[ATED ELECIRICAL & IEWANICAL MAIN 1HW4CE SIM1ARY e - -

  • MARCH 1985' V'

+ .c -

xriAIR ;

WORK REQUEST # . -

TDE DATE SYSIDi CmPGWT HOW DEECIE CAUSE OF MALEUNCTION ACTION TAK m 10 PRECLUDE RECURR W CE HOURS 3/19/85. 10 .35422 . IIRT Seat -leak Lapped wedge and seats ~59

% MOV-26B 3/29/85 02 %. .23575 N/A. No Malfuiction Decontaninate feedwater nozzles 40 V-1 g

'3/30/85 10. ;23877 -ISI loose and clissing' Replaced hardware and torqued 1.5 H10-115 hardware '

PFSK 2167 ~

3/27/85 24 33701- Visual Misuse Replaced hinge screws .1-ALD-1A ,

3/15/85 93' 35429 Visual Iraking threaded Cleaned threads & sealed 2 B-EDG fittings.

.a 3/15/85 93 35430 Visual Isaking packing, Replaced valve, replaced gasket 3 D-EDG flange and threads and sealed threads a t

3/22/85 93 35432 Visual Iraking threaded -Tightened ^

2

  • D-EDG fittings ,

t 3/8/85 71 22665 Visual Age and heat Replaced resistor R-5 2 BC-1B 3/12/85 71 .22666 Ops Out of adjustment Adjusted resistor R-2 and R-5 3-BC-1A -

3/13/85 76 33652 Ops Ebgine speed too low Adjusted governor 3 P-1 3/2/85 93 35431 -ISI Gasket leak Replaced gasket 1.5 1"-OF-ISI-37A -

e

.: ;V  ?

7 NEN YORK IMER AU'IHORITY JAMES A' FITZPATRICK NUCEAR F0WER PIMI ,.

SAFELY RELATED ELECIRICAL~ & MECHANICAL MAINIDIANCE SGNARY .

- L'E wrAIR' .

WORK REQUEST f TIME

-DATE SYSTDI- CmPmENT 'HOW DETECIED CAUSE OF MAIRJNCTION : ACTION TAKEN TO PRECLUDE RECURRENCE H0lRS

'3/7/85 93 :27125 Ops- Relief valve ~ seat leak " Replaced. relief valve'. ' 4 l-RV-102C

3/9/85 93 27128 Ops- Various air leaks Repaired leaks .35

-EDG A.& C.

3/9/85 93 27129 Ops Packing leaks Repacked 3.5 EDG 23C & 34A 3/20/85 27 35509- LIRT Seat leak Replaced disc and spring 12

' CAD 68 3/25/85 '13 35408 LIRT Seat leak Replaced wedge, lapped, repaired 387 MOV-15 bonnet steam cut, repacked 3/19/85 12 28633 OPS Worn packing Repacked-44.

RWCU 63.

-3/11/85 10 23876 ISI loose or binding Adjusted and torqued 2 4 H-10-246 hardware-PFSK-2402-3/8/85 71 35602 OPS Float voltage adjust Replaced cceponents - rewired 60 BC-1A resistor failed and caused: fire Preventive maintenance 142 3/8/85 71 22664 N/A- No malfunction-MCC-254 3/7/85 03 22875 N/A No malfunction Preventive maintenance 260 HCU 117-&

118 Valves.

3/8/85 00 >36184 .N/A - No malfunction Installed Limitorque "T'.. drains for. :20 Misc. Limi , environnental qualification torque

g; .

.7

-r <

.: ,</

M!W Y0RK PWER AUm0RITY

' JAMES A.' FITZPATRIN: NUCLEAR POWER FIANT -

SAFEIY REIATED EWCTRICAL:& MEDIANICAL MAINIENANCE SGMARY V7 ff uriAIR~ '

WORK REQUEST f . .

TDE ^

DATE . SYSTEM cmp 0NENT HOW DEIECTED CAUSE OF MAIRNCTIN - ACTIN TAKEN 10 PRmmE RECURRENCE HOURS 3/16/85 16 35557 Im Imaking 0-rings. . Replaced 0-rings- 241 16X2A 3/15/85 27 '35538- IIRT Seat leak Replaced seat, spring, 0-ring; 12

.and linkage SOV-121B 3/15/85 27- 35537- Im Seat leak 3 Replaced seat, spring, 0-ring'and .12 :

SOV-122A linkage

^

3/13/85 .34 35469' OPS Positico indication . Adjusted position indication 2' out of adjustment NRV-111A

~3/16/85 71 ~22836- S.T. Design. Replaced battery- 7601 BAT-3B.

3/6/85 27 33465 OPS Inproper. assenbly Manufactured and installed 189.

VB-2 shim 2/28/85 27 35541 Im Seat leak Cleaned body, replaced dis'c and~

6 SOV-120B spring 2/28/85 27 35540 IIRT Seat leak- Cleaned body, replaced disc and- :6.

SOV-122B spring

'2/28/85 27 35539 IIRT Seat' leak. Cleaned body, replaced disc and 6 spring

~

SOV-120A 2/28/85.27 35582 Im . Seat leak. Cleaned body, replaced disc and.

6 SOV-119A spring

.-. ,. .~. _ . _ _ . . . _. . _ .

7.. ,

. NEW YORK POWER AUIHORITY '

-JAMES A. FITZPATR1CK NUCWAR IGER PIMT -

SAFETY REUGED EBCIRICAL & NEGANICAL MAINTENANCE SW9fARY .

mrAIR '

WORK REQUEST f. TIME DATE SYSIEM COG MENT HOW DETECIED CAUSE OF MAIRJNCTION- ACTION TAKEN TO PRECLUDE RECURRENCE HOURS c

'2/25/85 71 22662 N/A' No malfunction Hooked up test discharge' 4' SB-1 equipment-

, '3/5/85 '72 '35600 OPS'- .Wom belts Replaced belts 6 AHU-80B-i 2/26/85 76' 35504 S.T. Iow specific gravity Replaced battery 60 '

PI-i 3/11/85 93 27122 .N/A No malfunction Preventive maintenance .1504 EDG-C ,

.) -.

i 3/11/85.93 27121 N/A No malfunction Preventive maintenance 651' EDG-A j 3/8/85 03 34589 OPS Inose acorn nuts Torqued acorn nuts 4' 1

HCU-117 &

f 118 Valves 4 i

i .

L 3/9/85 03 23201 OPS Worn packing Replaced and rebuilt 44 valves 115 l HCU 111 Valves j 3/9/85 10 23874' ISI Inproper installation ' Bent cotter pin 1 f- 10-15A-US-103 i

f

, 3/2/85 13 35420 - LIRT Seat leak' Impped piston and seat repacked 44 j RCI j

~

3/5/85 13 35419 IIRT Seat leak ,Iapped seat 6' RCI-08

ggga _

JAMES A. FITZPATRIm NUCLEAR POWER PIRE - .

SAFEIY REIATED ELECIRICAL- & MEGA!TICAL MAINTEtMNCE StWARY . *: '

taTAIR-WRK REQUEST f _ TDE DATE SYSTDi CWPWENT HOR DETECTED CAUSE OF MAIRRETION . ACTION TAKEN 10 PRECLUDE RECURRENCE HOURS 3/6/85 13 35411 11RT Seat leak- Iapped seat, disc and backseat '46-RCI 04 3/8/85 13 35481' 11RT Seat leak - Impped seats and wedge 48 RCI 03 2/24/85 23 28689 OPS Ioose connection Tightened and checked all other- '12 MOV-15 tenninations 3/9/85 23 23873 ISI loose bolt Re-torqued 1 23-25-NS-82 2/26/85 24 35580 OPS Bent linkage Straightened linkage 3-EOD-1

t!

s- ,

~ James A. Fit. Patrick

'. - Nucleti Power Plant PO. Bow 41 Lycoming. New York 13093 315 342.3840 Harold A.Glovier

  1. > NewYorkPower tsf Authority April 9, 1985 JAFP 85-0343 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555

~

' ATTENTION: DOCUMENT CONTROL DESK

REFERENCE:

DOCKET NO. 50-333

Dear Sir:

Enclosed please find the J. A. FitzPatrick Operating Status Report for the month of March, 1985. Refueling information remains the same as previously submitted.

If there are any questions concerning this report, please contact John Cook at (315) 342-3840, Ext. 439.

ROLD A. GLOVIER HAG C:mac cc: Internal Distribution Enclosures 3

. x_