l_  ?

A'.

OPERATING DATA REPORT -

DOCKET NO, 50-333 DATE Sept. 1983 ,

COMPLETED BY > J. Coolc TELEPHONE (3151342-3840 OPERATING STATUS tzPatr M '

g, Unit Name: Notes

. 22 Reporting Period: R3ng01-830831

3. Licensed Thermal Power (MWt):

2436

4. Nameplate Rating (Gross MWe): 883 821
5. Design Electrkal Rating'(Net MWe): .

6.~ Maximum Dependable Capacity (Gross MWe): R30

7. Maximum Dependable Capacity (Net MWe): 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None-

9. Power Level To Which Restricted,1f Any (Net MWe): None t .. ~ 10. Reasons For Restrictions,If Any:

i- This Month' Yr to.Date Cumulative j 11.' Hours In' Reporting Period 744 5831 -70968'. '

12. Number Of Hours Reactor Was Critical . '0 ~3390.9 49646.6-
13. Reactor Reserve Shutdown Hours 0 0 0

- 14. Hours Generator On-Line . 0 3353 48368.2 15.' Unit Reserve Shutdown Hours n n 'n

- 16. Gross Thermal Energy Generated (MWH) 0 7669944 101193802

!' 0 2598480

17. Grcss Electrical Energy Generated (MWH) . 35033260
18. Net Electrical Energy Generated (MWH) - 0 2518780 33383165
19. Unit Service Factor 0- 57.5% 68.2%

20.' Unit Availability Factcr n s7 sr 6g.97 l

. 21. Unit Capacity Factor (Using MDC Net) - 0 53.3r 61.7%

22. Unit Capacity Factor (Using DER Net) - 0 52.6% 57.3% .

123. Unit Forced Outage Rate . 0 9.1% 15.3%  ;

" ~

24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration'of Each):

I 25. If Shut Down At End Of Report Period. Estimated Date of Startupi ist week of September 1983-26... Units In Test Status (Prior to Commercul Operation): Forecast Achieved  ;

INITIAL CRITICALITY INITIAL ELECTRICITY - ,

COMMERCIAL OPERATION '

8309140003 830909

, PDR ADOCK 05000333 PDR

- R-- ((.

.>, AVERAGE DA'lLY UNIT POWER LEVEL DOCKET NO. 50-333 FitzPatrick UNIT DATE September 1983 COMPLETED BY J. Cook TELEPHONE MONTH August 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1 0 g7 0 2 0 0 18 3 0 39 0 4- 0 20 0 5

0 0 21 6 0 22 0 7 0 0 23 8 n- 24 0 9 0 25 0

'10 0 0 26 11 0~ 27 0 12 0 0 28 13 ~ 0- 29 0 14 0 30 0 IS 0 3, 0

.16 0

SUMMARY

The FitzPatrick plant continued it's fifth refueling outage through this reporting period.

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-333 -

UNITNAME FitzPatrick DATE sept =her 1983 August 1983 . COMPLETED BY T- cank REPORTMONTH

. TELEPHONE (315)342-3840 I

n.

- B -

E No.

.$ E g *YE Licensee E.t j% Cause & Corrective Date k

H 5g s 3s& Event g ,.g a3 Action to

$E $ j@g Report # mO jU Prevent Recurrence c5 ,

8 830603 s 744 c 1 N/A N/A N/A Refueling outage (cumulative hours to date 2142.6) i i 2 3 4 F: Forced Reason: Method: Exhibit C-Instructions

, S: Scheduled A Equipment Failure (Explain) I Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

C-Refueling Entry Sheets for Licensee

3-Automatic Scram. Event Report ER) File (NUREG.

D-Regulatory Restriction 4-Other (Explain) l E-Operator Training & License Examination 0161)

! F-Administrative

- 5 G Operational Error (Explain) i ll-Other (Explain) Exhibit 1 Same Source l

NEW-YORK POWER AUTHORITY

-JAMES A. FITZPATRICK NUCLEAR POWER-PLANT

.NARRA".VE

SUMMARY

OF OPERATING EXPERIENCE

-AUGUST 1983 The refueling.and maintenance outage which began June 3, 1983,

.' continued throughout.this reporting. period. The major areas of work are u . scram discharge modification, turbine generator maintenance, LLRT testing,

. TORUS modification,.and post accident sampling' system modifications.

Presently.the outage' activities'are on schedule with start up expected the first week of September.

b

'l A

POWER AUTHORITY OF THE STATE OF NEW. YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C AUGUST 1983 WORK REQUEST # CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM N O U MALFUNCTION MALFUNCTION TO PRECLUDE TIME COMPONENT # RECURRENCE HOURS 8/31/83 02 11311 TCS LEAD PULLED OUT LEAD PULLED OUT RECONNECTED LEAD 8 TE-112B FROM CONNECTOR FROM CONNECTOR 8/26/83 02 20536 JIC REMOVE / REPLACE REMOVE / REPLACE REPLACED / REPAIRED 193 SRV AC MON ACOUSTIC MONITS AC MONS VARIOUS MONS 8/13/83 02 20820 JIC OUT OF CAL XMITTER PERFORMED ISP-63-1 2 FT-110E 8/27/83 02 21561 OPS NONE; UNITS WORK OK ACOUS MON APPEARS NONE; UNITS WORK 12 VMR-71E NOT TO WORK OK 8/24/33 02 26365 JIC PIPE FITTING NOT LEAK ON HI SIDE CLEANED AND 3 FT-110E TIGHT ISO VLV FITTING REPLACED FITTING 8/28/83 02 26420 JIC FAULTY CAPACITOR SRV TEMP REC DID REPLACED CAPACITOR 12 TR-166 NOT PRINT 8/9/83 02 26925 OPS OLD AGE INACCURATE REPLACED SLIDE 20 TR-165 W1RE 8/22/83 02-3 22909 OPS BLOWN FUSE IN PS-88 NO INDICATION REPLACED FUSE, 2.5 PR-95 CALIBRATED PR-95 8/23/83 02-3 22932 OPS AGE AND REPETITIVE HP TEST CONNECTION REPLACE VENT 2 LITS-79 USE LEAKS VALVES 8/20/83 02-3 24935 JIC OLD AGE. LEAKY ISOLATION REPLACED MANIFOLD 6 FT-64B VALVE 8'/28/83 02-3 25528 JIC NEW REFERENCE TO CHANGE EXISTING CHANGE SCALES 0.5 LIS-72A-D TOP OF FUEL -

SCALES

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT

,, MAINTENANCE

SUMMARY

I&C AUGUST 1983 RESULTS OF. ACTION TAKEN REPAIR .

WORK REQUEST # CAUSE OF DATE SYSTEM H D UECTED MALFUNCTION MALFUNCTION TO PRECLUDE TIME COMPONENT # RECURRENCE HOURS 8/28/83 02-3 25529 JIC (EW REFERENCE TO CHANG 3 EXISTING CHANGE SCALES 0.5 LIS-83A&B FOP OF FUEL SCALES 8/29/83 02-3 25531 JIC (EW REFERENCE TO CHANGE EXISTING CHANGED SCALES 0.5 LIS-57A&B TOP OF FUEL SCALES 8/7 18 3 02-3 25591 JIC '4EW REFERENCE TO CHANGE EXISTING CHANGE SCALES 0.5 LIS-58A&B TOP OF FUEL SCALES 8/25/83 02-3 26357 JIC .00SE LEAD IN SW WOULDN'T CLEAR / RETIGHTENED LOOSE 16 LIS-101D JB-R256C TRIP LEAD 8/24/83 02-3 26363 JIC LOOSE SPAN ADJUST LEAK INSIDE IIGHTENED PLUG 2 LIS-72C PLUG HOUSING 8/24/83 02-3 26364 JIC DEFECTIVE SPAN LEAK INSIDE REPLACED PLUG 5 LIS-72B ADJUST PLUG HOUSING 8/15/83 02-3 18101 OPS DEFECTIVE NOT WORKING REPLACED & 3 FI-87B CALIBRATED METER 8/30/83 03 21419 OPS FAULTY P.I. PROBE NO POSITION-IND REPAIR POSITION 2 CRD-18-27 (30-40) IND 8/31/83 03 21438 OPS NOJE NO 48 POSITION RONE;ALL POS CHECK 0 ROD 02-27 INDICATED 4/ TEST BOX 8/30/83 03 21439 OPS LOOSE CONNECTOR CONNECTOR NOT PUSHED PIN SOCKETS 16 ROD 18-27 CONNECTED TICHT PARTHER TN 8I26/83 03 26321 JIC CHECK LEAK CHECK / REPAIR PERFORMED IMP-3.5 14 HCV's DETECTORS LEAK DETECTOR 9

- - w

, . . . . _ _ _ _ =

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C AUGUST 1983

  • I# A E T DATE SYSTEM HOW DETECTED M C0 PONENT # C ON ON 26853 GPS DEFECTIVE INDICATOL NO FULL IN REPLACED INDICATOR 4 8/17/83 03 46-19 INDICATION 17438 JIC TUBES SWAPPED @ REPROGRAM CHANNEL RESTORE TUBING 32 8/18/83 07 TIP CONT D PED UNDERVESSEL 2&4 FOR D2 & D4 17438 JIC MAINTENANCE ON PERFORM MAINT NEW TUB SLEEVES; 188 8/29/83 07 TIP SYS TIPSYSTEM CHANGED BAD CAP DIRTY CONNECTOR DRIFTED LOW CLEANED CONNECTOR 7 8/2/83 07 19194 OPSLPRM44-45B FAULTY TRANSMITTER D FLOW UNIT PERFORMED 8 8/12/83 07 19261 OPS AR-23D READING LOW F-ISP-63-1 ON UNIT 22969 NEW LPRM's CALIBRATE NEW CALIBRATE NEW 4 8/23/83 07 OPS LPRM's LPRM's LPRM's 24457 JIC WEAR CABLE NEEDS TAPE DAMAGED 4 8/27/83 07 IRM-C REPAIR PORTION OF CABLE 26280 DIRTY CONNECTOR REPAIR CABLE CLEANED CONNECTOR 4 8/1/83 07 JIC lpm 136-21A CONNECTOR 8/14/83 07 26345 JIC DEFECTIVE VR-3 VOLT REG OUT OF REPLACED VR-3 4 RBM-B TOLERANCE 8/15/83 07 26777 OPS DEFECTIVE CIRCUIT METER NOT READING REPLACED CIRCUIT 7 IRM-C BOARDS CORRECTLY BOARDS 8'/12/83 07 26996 .JIC USE FAULTY TEST CARD REPLACED TEST 4 FL UNIT A . CARD

POWER AUTHORITY OF THE STATE OF NEW YORK.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C AUGUST 1983 CAUSE OF RESULTS OF ACTION TAKEN REPAIR WORK REQUEST # 0 DATE SYSTEM MALFUNCTION COMPONENT # MALFUNCTION yCU S 8/2/83 07 27311 OPS DIRTY CONNECTORS CONTINUOUS DRIFT CLEANED. 4 LPRM-36-37 INDICATION 8/2/83 07 20399 OPS DIRTY CONNECTOR DRIFTING CLEANED CONNECTOR 7 I LPRM44-21B 8/15/83 13 25562 JIC OUT OF CALIBRATION PERFORM TEST RECALIBRATED 12 PI-96,PT65 TRANSMITTER

(

l8/28/83 14 26366 JIC LEAKY DRAIN VALVE DRAIN VALVE LEAKS REPLACED DRAIN 1 l PS-47B BY VALVE 8/27/83 16 22939 OPS VERY SLOW LEAK RECHARGE FILL PENETR W/30 5 X-104C&D ELECTRICAL PENETR PSI N2 8/5/83 17 26533 OPS HIGH VOLTAGE SUPPLY UNABLE TO RESET REPAIRED 60 RM-50B UNSTABLE DOWNSCALE LITE 8/16/83 17 26803 OPS HI-HI ALARM SPURIOUS RX BLDG ADJUSTED TO PROPEB 20 RIS-456A ADJUSTED TO LOW ISOLATION ALM LEVEL 8/17/83 17 26808 OPS ZERO A3JUST DRIFT METER READING NOT ADJUSTED ZERO 2 RM-50A +/- 10%

8/2/83 17 27322 OPS INSTRUMENT DRIFT RECORDER & METER ADJ RECORDER & 6 RIS-459 DON'T AGREE PERFORM IMP 17.5 8/2/83 17 27330 OPS NOT GENERATING A HI ALARM PERFORMED IMP,-17.1 20 RM-50A _ HTCH ATARM 8/30/83 18 26559

~

RES PREVIOUS CABLE LOST HOOK UP CABLE TO PLACE END CONN ON 2 ARM CABLE Any CABLE /IMSTLL

~

POWER AUTHORITY OF THE STATE OF NEW' YORK

- JAMES ' A. . FITZPATRICK ' NUCLEAR POWER : PLANT-

, MAINTENANCE

SUMMARY

I&C AUGUST 1983-WORK REQUEST # CAUSE OF . RESULTS OF ACTION TAKEN REPAIR

-DATE SYSTEM '

D COMPONENT # MALFUNCTION . MALFUNCTION CU S- a 8/30/83 20 26269 'JIC NONE; FUNCTIONAL PERFORM FUNCTIONAL NONE- 8 LT-120/121 TEST CHECK ~

8/14/83 20 26286 JIC PEN ASSEMBLY RED ~& BLACK PEN REPAIRED 4 FR-52B BROKEN BINDING 8/14/83 20 26630 OPS OUT OF CALIBRATION INTEGATOR READING CALIBRATED AND 4 FOX-530 CONTINUOUSLY PFRFORM ISP-15 8/11/83 23 26775 OPS CALIBRATION CALIBRATE GAUGE? CALIBRATED GAUGES .24 '

, PI-302-310 NEEDED 8/9/83 23 26927 OPS DEFECTIVE TERMINAL ALARMS SPURIOUSLY TIGHTENED TERMINA', 32.

TE-114A SWITCH SCREWS 8/8/83 23 26987 JIC VALVE REPAIRED BY STROKE VALVES STROKED VALVES & 10 A0V-42&S3 MAINT. ADJ VAL STEM 8/16/83 27 18240 OPS OLD AGE INDICATOR STICKING REPLACED REGULATOR 14 APR-2 8/30/83 34 21551 OPS PROBE BROKEN HIGH VIBRATION REPLACED PROBE 4 DD-102A -

ALARM 8/29/83 37 21414 OPS TE-110 BROKE NONE/WR CANCELLED- NONE/WR CANCELLED 0 TE-110 8/30/83 40 21410 JIC FAULTY LEVEL IND REPLACE LEVEL IND REPLACE LEVEL IND 1 OLTR-LI-B '

i 8/19/83 68 24458 SIC OLD AGE INTERMITTENT TR-102 REPLACED SWITCH 2 SWITCH

POWER AUTHORITY OF' THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C AUGUST 1983 WORK REQUEST # CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM N TO PRECLUDZ TIME COMPONENT # MALFUNCTION MALFUNCTION RECURRENCE HOURS 8/19/83 68 24942 JIC DEFECTIVE PARTS CARTRAGE NOT REPLACED DEFECTIVE 50 TR-103 MOVING WELL PARTS 3/3/83 71 16257 OPS VIBRATION OVER METER READING PERFORMED IMP-G12 8 LPCI"A" TIME HIGH 8/3/83 71 17844 OPS VIBRATION OVER AMMETER GIVING CALIBRATED PER 6 INV-38 TIME FALSE READING IMP-G12 8/10/83 71 24777 JIC REQUIRED PERIODIC TEST RELAYS ON TESTED & SERVICED 165 <

RELAYS TESTINGS 10500 BUS GAUGES

.8/12/83 71 26342 JIC FUNCTIONAL TEST TEST TESTED RELAYS 6 RELAYS 8/31/83 76 21402 OPS HEAT LINES 1 & 2 MINOR MOD ON 10 MPX #3 FAILURE CONTROL BOX 8/15/83 76 26789 OPS DEFECTIVE RELAY ALARM BELL DIDN'T CHANGED RELAYS 10 FPP ACTIVATE 8/13/83 76 26794 OPS DEFECTIVE MODULE ALARM FOR RX REPLACED 2H-30 6 MUX #3 BLDG MODULE 8/15/83 76 26827 OPS DEFECT 3.vE DIGITAL FAILED ALARMS REPLACED DIGITAL 13 MUX #3 TRANSMITTER TRANSMITTER 8/17/83 76 26843 JIC LOOSE CONNECTOR LINE #2 FAILED TIGHTENED WIRES 20 MPX-1 ,

8/12/83 93 20530 .JIC TEST AND TEST AND EDG-A-D TEST & CAL OF 462 CALIBRATION .

CALIBRATION INSTRUMENT

9 POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT -

MAINTENANCE

SUMMARY

I&C-AUGUST 1983 DATE SYSTEM

  1. T# HOW DETECTED .

A

- O C ENT # L ON I 8/15/83 93 24411 OPS OLD AGE DOESN'T WORK- REPAIRED 3 TI-5A DISCONNECTED 8/3/83 93 26636 OPS OUT OF ADJUSTMENT LEVEL INDICATOR ADJUSTED LEVEL 2 LI-101DR OFF 7 INCHES INDICATOR 7/30/83 94 27327 JIC. . SCREW HEAD SCREW REPLACED SCREW 4 PS-1 ROUNDED I

9 O

e 4

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NOCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURREN^E

'8/30 27 21429 OPS Misadjusted position Readjusted Cams 2 ADV-116 Indication Cams 8/31 03 21446 OPS Unlatched Inner Filter Replaced CRD 73 CRD 30-23 ,

8/26 02 22967 Hydro Worn packing Repacked 10 MOV-54B 8/26 02 24967 Hydro Worn packing Repacked 20 MOV-538 8/31 02 22987 Hydro Seat Leakage' Replaced valve - added "langes f 18 RWR 755B ,

9/1 27 25727 Visual Inadvertently damaged Replaced bent all thread 3 Conduit Stpport 8/31 27 22958 OPS Improper installation Installed correct fuses 6 P.A.S.

8/27 71 27018 OPS Leaking cells Replaced both batteries 970 SB 1 & 2 e

e

^

POWER AUTHORITY OF 'THE STATE OF-NEW YORK JAMES A. FITZPATRI K NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM M ST HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE

,8/28 93 ~22791 N/A No malfunction Electrical Preventive Maint. 180 EDG C 8/15 93 27792 N/A No malfunct-ion Electrical Preventive Maint. 188 EDG A '

8/29 05 21398 N/A No malfunction Verified tightness if electrical 6 09-15, 16 & 17 connectors 8/29 71 20605 N/A No' malfunction Investigated cause of previous 6 INV 3-B failure 8/29 24 27318 OPS Defective Relay Replaced relay

  • 2 Air Lock Door .

8/30 02 14992 Visual Thermocouple damaged Installed new thermocouple 12 TE 1133 during Mod. F1-80-20 8/29 29 22962 Hydro Bridy-Bonnet Leak Seal Welded 16 ADV-86C 8/30 03 21430 OPS Bad position Replaced probe 4 30-23 indicating probe 8/30 02 25027 Visual Discharge flange loose Torqued flange 4 SRV-3 k

POWER AUTHORITY OF THE STATE OF NEW YORK .

JAMES A. FITZPATRidK NOCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

REPAtR WORK REQUEST # TIME DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE NT # HOURS N/A No malfunction Sealed secondary containment. 4

,8/30 16 25260 penetration Reinstalled lead, ground cleared 11 8/30 10 21441 OPS Lead lifted due to.

ADV-68A grounded position cleared on previus WRED indicator Blown diaphragm Rebuilt valve 3

. 8/25 10 26861 OPS SOV-101D 8/31 10 22968 Hydro Normal Maintenance Tightened bonnet lock nut 1 MOV-32 Worn packinc Repacked 17 8/26 23 24435 Hydro MOV-15 ,

21039 Normal Maintenanbe Tightened bonnet 18 8/23 10 Visual MOV-18 .

20165 Worn internals Replaced pin, disc holder and 45 8/25 10 OPS RHR-42C hanger 26815 OPS Seat leak Lapped disc and seat 30 8/24 03 HCU 10-23 Worn packing Repacked 6 8/24 29 22976 Hydro MST-120 jd.} ).;E.i d j k i tyff *T{ [ ((.5-j -} d;{ N / . y k *. .

h. k, .j;.

.{ [. ((,I[l'

  • 5 Y.5 '(

[

. . . . ._i

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRidK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

REPAIR DATE SYSTEM WORK REQUEST # HOW DETECTED CAUSE OF MALFUNCTION f '

ACTION TAKEN TO PRECLUDE RECURRENCE TIME HOURS

.8/24 13 22931 OPS Position indicating Reinstalled switches 6 A0V-34 switches removed for

& 35 maintenance 8/23 12 8543 Hydro Pdcking leak Electrically back-seated 1 MOV-15 -

8/28 02 26419 OPS Damaged during Replaced acoustic monitor cable 2 SRV "H" maintenance 8/28 02 26368 OPS Damaged during Replaced acoustic monitor cables 4 SRV L & H maintenance 8/26 27 24968 OPS . Loose actuator Torqued' bolts 3 A0V-101A mounting bolts 8/3 03 17677 OPS Bad position Replaced probe 6 CRD 34-15 indicating probe 8/10 03 19885 OPS Bsd position Replaced probe 4 CRD 46-15 indicating probe 8/10 03 19886 OPS Bad position Replaced probe 6 CRD 46-35 indicating probe 8/10 03 19887 OPS Bad position Replaced probe 5

. CRD 50-31 indicating probe

POWER AUTHORITY OF THE' STATE OF NEW YORK

~ JAMES A. FITZPATRidK NOCLEAR POWER PLANT SAFETY RELATED ELECTRICAL & MECHANICAL MAINTENANCE-

SUMMARY

DATE SYSTEM

" HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECtmRENCE

,8/10 03 ~27352 OPS Bad position Replaced probe 5 CRD 42-23 in'dicating probe 8/10 03 19933 OPS Bad position Replaced probe- 9 CRD 18-27 indicating probe 8/23 02 22977 Hydro Packing _ leak Electrically back-seated 2 MOV-538 &

548 8/18 46 26780 OPS Lack of lubrication Performed preventive maintenance 28 MOV-101B on Limitorque, lubricated stem 8/23 02 20732 N/A No failure. Re-assembled reactor vessel 794 V-1 ,

8/23 02 22989 Hydro No failure Adjusted packing 1 A0V-39 8/21 03 20109 N/A No' failure Installed check valves per 38 SOV Mod. F1-82-18 8/25 00 20154 N/A No failure Performed minor mod 312 M1-83-010 M1-83-010

. 4 9

-a U

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NOCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM M RMST# HOW DETECTED

-, CA.USE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE E m,

,8/18 02 ~25055 N/A No malfunction Removed and replaced for 84 SOV-71, preventive maintenance A-L 8/19 46- 26823 OPS Lack of lubrication Performed preventive maint. on 20 MOV-101A . Limitorque, lubricated stem 8/8 03 19981 OPS Bad positilon Replaced probe 4 CRD 42-39 indication probe 8/8 03 19884 OPS Bad positioa Replaced probe 4 CRD 38-19 indication probe 8/10 03 19879 OPS Bad position Replaced probe 6 CRD 26-19 iqdicatidn probe 8/5 03 19877 OPS Bad position Replaced probe 4 CRD 18-19 indication probe 8/8 03 18322 OPS Ba'd position Replaced probe 3 CRD 30-11 indication probe 8/10 03 27357 OPS Bad position Replaced probe 5 CRD 26-27 indicati~on probe i

8/3 03 18204 OPS Bad position Replaced probe 4 CRD-30-27 indication probe

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRI K NOCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM HOW DETECTED CMJSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE

,8/4 03 ~18203 OPS Ba,d position Replaced probe 4 CRD 02-27 indication probe 8/4 03 17969 OPS Bad position Replaced probe 3 CRD 42-07 in'dication probe 8/8 03 1767.8 OPS Bad position Replaced probe '

3 CRD 18-23 indication probe 8/13 03 21724 OPS Le'aking accumulator Replaced accumulator 16 HCU 42-07 piston seals 8/11 23 24470 OPS Seat leakage Replaced valves 20 HPI 27C

& 28C ,

8/13 34 25793 LLRT Seat leakage Ground seat, replaced disc 300 FWS 288 8/13 34 25792 LLRT Seat leakage Ground seat, replaced disc 300 FWS 28A 8/14 16 26782 OPS Valve co.nnected Re-piped valve 2 SOV-102A incorrectly 8/13 16 26785 OPS Valve connected Re-piped valve 2 SOV-101B incorrectly

_ . a

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRI K NOCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM N HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE E g COf0'ONENT # '

HOURS

~

[ .8/13 16 26787 OPS Limit switches not Adjusted limit switches 1 A0V-102B adjusted

(

26788 Limit switches not Adjusted limit switches 2 8/13 16 OPS ad* justed A0V-101A .

22792 Shorted water box Replaced heater 8 8/15 93 OPS "A" EDG immersion heater

^

8/12 46 13412 OPS " Loose Tightened 1/4 y Ext. 10C ,

t .

8/9  ! 93 ,

15$43 .. , N/A No malfunction Preventive maintenance 427

. , Y EDG A & C . '

J sj / L 4 l

- -e F < t 100

[  ! Packing leaks Rebuilt 111 valves

7/20 0 3. , 26297~ OPS 1 4

y Various , ,. on 111 valves HCU's -

,' N.1 R i

7/21 03 26299 OPS Pa'cking leaks on Replaced 111 valvec 21 P

Various 111 valve's t ,

,HCU's 8/5 10 1 25785 LLRT Seat leak Replaced wedge 407

, .- NOV-18 . ground seats

POWER AUkl+bkiTY'OF THE STATE OF'Ns# YORK JAMES A. FITZPATRl6K.. id) CLEAR POWER PLANT SAFETY RELATED ELECTRICAL 8 ' MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM NU HOW DETECTED

" COMPONENT # CAUSE

- OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE HOURS

,8/6 08 22861 N/A No malfuretion Installed for in-vessel work- 24 Cavity Plugs -

i 8/8 27- 26974 OPS Improperly adjusted Adjusted limit switches 5 ADV-115 limit switches 8/8- 27 26973 OPS Improper.ly adjusted Adjusted limit swit hes 5 ADV-111 limit switches 8/8 29 22990 Routine Valves removed from Replaced valves 120 MST-753 A Observatior system by mistake

&B *.

8/8 29 22990 Routine Valves removed from Replaced valves 120 MST-754 A Observatior system by mistake

& 8, MST-756 A & B, MST-757 A .

&8 8/9 93 20708 OPS 8 lown fuse, bad Replaced fuse and contactors 4 WH-3A contactors 8/12 03 25987 OPS Worn valve internals Rebuilt valve 18 HCU 30-15 on 107 valve I

11 "I' M H I H

' I H r, l -.

l

..q lr I IIH ' "" 7 HI 't..

III"'W E P F' I I

POWER. AUTHORITY OF THE STATE OF NEW YORK JAMES 'A. FITZPATRidK NOCLEAR POWER PLANT SAFETY RELATED ELECTRl3L a MECHANICAL MAINTENANCE

SUMMARY

DATE. SYSTEM M RE N # HOW DETECTED CAUSE OF MALFUNCTION COMPONENT #

  • ACTION -TAKEN TO PRECLUDE RECURRENCE T E HOURS 8/10 16 26778 N/A Normal maintenance Installed hatch cover 10

-Torus Hatch 8/13 03 26339 OPS Leaking 1.11 valves Replaced valves 3 HCU 42-43 -

& 30-35 _.

8/4 02 20709 N/A Normal use Replaced "0" rings 50 Rx Head ,

8/4 02 20713 LLRT Packing leak Repacked 3 RWR 255 .

8/4 08 20714 N/A No. malfunction Installed gates 4 Fuel Pool Gates 7/14 03 25005 N/A No malfune. tion Rebuilt scram pilot valves 200 Various . 117 & 118 for preventive HCU's maintenance 7/22 03 14235 Audio Chattering scram Replaced pilot head sub- 8 HCU 18-39 pilot valves 117 & 118 assemblies 7/22 03 18646 Audio Chattering scram Replaced pilot head sub- 7 HCU 06-23 pilot valves 117 & 118 assemblies Y ;. ,ki^ ' f f.' :1 L , ;-L

~

] : G f. M.' l. ;L ~

. ' . + :& '=.D.T!:

V;6.U T" ~-1 f n G.F.( % @ .,&.:(:f.ll J.~M. iW l ~:. :' :' ~ ..-' ' if.<,s ~~f~. %i p

JAMES A. FITZPATRidK NOCLEAR POWER PLANT 9

SAFETY GELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM RMW HOW DETECTED REPAIR COMPONENT # CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME HOURS

,7/18 03 ~24338 OPS Air leak on scram Rebuilt scram pilot valve HCU 18-35 pilot valve.117 1

7/18 03 24342 OPS Air leak on scram Rebuilt scram pilot valve HCU 30-19 p i'lo t valve 117 1

7/18 03 24344 OPS Air leak.on scram Rebuilt scram pilot valve HCU Y)-39 pilot val ~ve 117 1

7/18 03 24352 OPS Packing leak on Replaced valve HCU 34-23 111 valve 1

7/21 03 25853 OPS Packing leak on Replaced valve 3

HCU 10-47 111 valve, 7/21 03 26601 OPS Packing leak'on Replaced valve 3 HCU 38-31 111 valve e

e

'd Jamse A. FitzPatrick '\

Nuclast Power Ptsnt RO. Box 41

\7 Lycoming, New%rk 13093  %'\'-

315 342.3840

  1. > NewYorkPbwer 1# Authority September 9, 1983 JAFP 83-0934 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washinghton, D.C. 20555 Attention: Document Control Desk

Reference:

Docket No. 50-333

Dear Sir:

The Operating Status Report for the month of August, 1983 is enclosed. The refueling information remains the same as previosly submitted.

If there are any questions concerning this report

contact John Cook at (315) 342-3840, Ext. 439.

Very truly yours, M

hlCORBINA.McNEILL,Jr.

f*

RJC:JPC:rv Enclosures cc: Internal Distribution