JAFP-04-0024, January 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant

From kanterella
(Redirected from JAFP-04-0024)
Jump to navigation Jump to search
January 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant
ML040560336
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/12/2004
From: Ted Sullivan
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-04-0024
Download: ML040560336 (3)


Text

Entergy Nuclear Northeast Entergy II I Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 T.A. Sullivan February 12,2004 Site Vice President - JAF JAFP-04-0024 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station O-P1-17 Washington, DC 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Januarv 2004 Monthly Onerating Report

Dear Sir:

P Enclosed is the Monthly Operating Report for the James A. FitzPatrick Nuclear Power Plant for the month of January 2004.

MOR data has been prepared and formatted using the INPO Consolidated Data Entry (CDE) submittal process.

Should you have any questions concerning this report, please direct them to Mr. Mick Baker, Thermal Performance Engineer, at (315) 349-6181.

Very truly yours, TAS:MB:dr Enclosure a2'q

cc: Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident Inspector James A. FitzPatrick Nuclear Power Plant U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Guy Vissing, Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail stop OWFN 8C2 Washington, DC 20555 Mr. R. Toole ENN BWR SRC Operations Subcommittee Chairman 605 West Homer Street Ebensburg, PA 15931 Mr. Paul Eddy Public Service Commission Office of Electricity and the Environment 3 Empire Plaza Albany, NY 12223 JENG JAFP Files RMS (JAF)

OPERATING DATA REPORT DOCKET NO. 50-333 UNIT NAME FitzPatrick I DATE February 06, 2004  ; 'i COMPLETED BY M. Baker TELEPHONE (315) 349-6181 REPORTING PERIOD: January 2004

1. Design Electrical Rating 816.00
2. Maximum Dependable Capacity (MWe-Net) 813.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 744.00 190,648.50
4. Number of Hours Generator On-line 744.00 744.00 185,315.20 S. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 626,620.00 626.620.00 138,532,384.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action S: Scheduled (Hours) Down 2 Comments

SUMMARY

Commenced planned power reduction on 01106/2004 at 07:59 hrs. to perform a sequence exchange.

Lowered power to 55.1%. While down in power cleaned the water box and performed a leak repair. Following completion of scheduled work activities the plant returned to 99.5% power on 0110712004 at 02:29 hrs..

1 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of I