JAFP-03-0097, June 2003 Monthly Operating Report for James A.Fitzpatrick Nuclear Power Plant

From kanterella
(Redirected from JAFP-03-0097)
Jump to navigation Jump to search
June 2003 Monthly Operating Report for James A.Fitzpatrick Nuclear Power Plant
ML031990100
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/09/2003
From: Ted Sullivan
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-03-0097, SIP Test Sample upto2-6-04
Download: ML031990100 (6)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP

  • - Entergy RO. Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 T.A. Sullivan July 9, 2003 Site Vice President - JAF JAFP-03-0097 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Mail Station O-PI-17 Washington, DC 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 June 2003 Monthly Operating Report

Dear Sir:

Enclosed is the Monthly Operating Report for the James A. FitzPatrick Nuclear Power Plant for the month of June 2003.

Should you have any questions concerning this report, please direct them to Mr. Mick Baker, Thermal Performance Engineer, at (315) 349-6181.

Very truly yours, aj&4

cc: Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident Inspector James A. FitzPatrick Nuclear Power Plant U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Guy Vissing, Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail stop OWFN 8C2 Washington, DC 20555 Mr. R. Toole ENN BWR SRC Operations Subcommittee Chairman 605 West Homer Street Ebensburg, PA 15931 Mr. Paul Eddy Public Service Commission Office of Electricity and the Environment 3 Empire Plaza Albany, NY 12223 JENG JAFP Files RMS (JAF)

RMS (WPO)

ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT REPORT MONTH: JUNE 2003 Docket No.: 550-333 Unit Name: IFitzPatrick Date: I uly 1,2003 Completed By:I M. Baker Telephone: ((315) 349-61 81 OPER) kTING STATUS

1. Unit name: FitzPatrick
2. Reporting period: 06/01/2003 - 06/30/2003
3. Licensed thermal power (MWT): 2536
4. Nameplate rating (gross MWE): 883.0
5. Design electrical rating (net MWE): 816
6. Maximum dependable capacity (gross MWE): 839
7. Maximum dependable capacity (net MWE): 813
8. If changes occur in capacity ratings (Items 3-7) since last report, give reasons:
9. Power level to which restricted, if any (net MWE):
10. Reasons for restrictions, if any:

NO. DATA REQUESTED THIS YR-TO-DATE CUMULATIVE MONTH 11 Hours in reporting period: 720 4343 244,799.00 12 Number of hours reactor was critical: 720 4229.15 185,559.67 13 Reactor reserve shutdown hours: 0 0 0 14 Hours generator on-line: 720 4105.83 180,240.17 15 Unit reserve shutdown hours: 0 0 0 16 Gross thermal energy generated (MWH): 1,821,082.08 10,115,376.70 411,901,501.62 17 Gross electrical energy generated (MWH): 627,099.00 3,483,224.00 139,377,675.00 18 Net electrical energy generated (MWH): 606,649.00 3,369,524.00 134,309,319.00 19 Unit service factor: 100.00% 94.54% 73.63%

20 Unit availability factor: 100.00% 94.54% 73.63%

21 Unit capacity factor (using MDC net): 103.64% 95.43% 75.26%

22 Unit capacity factor (using DER net): 103.26% 95.08% 67.24%

23 Unit forced outage rate: 0.00% 5.46% 10.73%

24. Shutdowns scheduled over next 6 months (type, date, and duration of each): None
25. If shutdown at end of report period, estimated date of startup: N/A
26. Units in test status (prior to commercial operation): FORECAST ACHIEVED Initial Criticality:

Initial Electricity:

Commercial Operation:

ENTERGY NUCLEAR NORTHEAST JAMES A. FTZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT REPORT MONTH: JUNE 2003 Docket No.: 50-333 Unit Name: FitzPatrick Date: July 1, 2003 Completed By: M. Baker Telephone: (315) 349-6181 DAY NET AVERAGE DAILY DAY NET AVERAGE DAILY POWER LEVEL POWER LEVEL 1 846.92 17 844.92 2 846.79 18 845.04 3 846.71 19 843.50 4 846.79 20 843.38 5 846.08 21 843.96 6 845.96 22 842.75 7 845.79 23 843.42 8 845.50 24 843.71 9 846.33 25 842.83 10 844.63 26 840.92 11 843.38 27 840.92 12 843.29 28 840.83 13 844.75 29 841.13 14 797.00 30 840.04 15 845.29 16 844.50

REPORT MONTH: JUNE 2003 of Docket No.: 50-333 Unit Name: FitzPatrick Date: July 1, 2003 Completed By: M. Baker Telephone: (315) 349-6181 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF LICENSEE SYSTEM COMPONENT CAUSE and CORRECTIVE HOURS SHUTTING EVENT CODE CODE ACTION TO PREVENT DOWN THE REPORT RECURRENCE REACTOR NO.

N/A F: FORCED REASON: METHOD: EXHIBIT G: Instructions for preparation of S: SCHEDULED A. Equipment failure (explain) 1.Manual data entry sheets for Licensee Event Report B. Maintenance or Test 2. Manual Scram (LER) file (NUREG-0 161)

C. Refueling 3. Automatic Scram D. Regulatory Restriction 4. Continued E. Operator training and license examination 5. Reduced load F. Administrative 9. Other G. Operational error (explain)

H. Other (explain)

^ - " are REPORT MONTH: JUNE 2003 Docket No.: 50-333 Unit Name: FitzPatrick Date: July 1, 2003 Completed By: M. Baker Telephone: (315) 349-6181 OPERATIONAL

SUMMARY

The FitzPatrick plant operated at or near rated power for the duration of the month of June 2003 with the exception of the following:

Note: This list does not include minor derates for rod pattern adjustments. (<20% reduction in average power level for the preceding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)

  • June 14, 2003 - 0800 Commenced down power to clean the water box and perform a sequence exchange. Reduced power to 75% power on June 14, 2003 - 0835
  • June 14, 2003 - 1341 Core Thermal Power was raised to 97%.