UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, DC 20555-0001 July 31, 2006 NRC INFORMATION NOTICE 2006-17: RECENT OPERATING EXPERIENCE OF

SERVICE WATER SYSTEMS DUE TO

EXTERNAL CONDITIONS

ADDRESSEES

All holders of operating licenses for nuclear power reactors, except those who have

permanently ceased operations and have certified that fuel has been permanently removed

from the reactor vessel.

PURPOSE

The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice (IN) to inform

addressees of operating experience within the past few years affecting the operability of the

service water system at several nuclear power plants. The NRC expects that recipients will

review the information for applicability to their facilities and consider actions, as appropriate, to

avoid similar problems. However, suggestions contained in this IN are not NRC requirements;

therefore, no specific action or written response is required.

DESCRIPTION OF CIRCUMSTANCES

During 2004 through 2005, 15 events occurred related to blockages in service water systems.

These events were primarily self-revealing. The various blocking agents included silt, sand, small rocks, grass or weeds, frazil ice, and small aquatic fauna, such as fish. All these events

were of low safety significance but illustrate the susceptibility of the safety-significant service

water system. For instance, in September 2005, NRC inspectors identified a condition at Fort

Calhoun that allowed small rocks to regularly enter the raw water system, contribute to tripping

of a pump and strainer motors, and interfere with traveling screen operation (NRC Inspection

Report 50-285/2005-11, Agencywide Documents Access and Management System (ADAMS)

Accession No. ML052920543). In June 2005, NRC inspectors found a portion of a service

water accumulator outlet line at Salem to be nearly full of silt (NRC Inspection

Report 50-272/2005-03, ADAMS Accession No. ML052090344).

Salem - Hope Creek Nuclear Power Plants

On December 2, 2004, crude oil was found leaking from a ship (Athos I) on the Delaware River

upstream of the Salem and Hope Creek Generating Stations. To mitigate the potential for oil

intrusion into the cooling water systems, the licensee placed booms around the intake

structures at both stations. The booms are effective at controlling oil that is at or near the

surface; however, the effectiveness of the booms was lessened because the spilled oil was

"heavy" crude and was suspended at varying depths in the river. On December 3, 2004, the

licensee commenced shutdown of both Salem units due to the conditions on the river. There

were no issues associated with the shutdowns. Hope Creek was already shut down for a

refueling outage. The licensee restarted both Salem units after review of heat exchanger

performance and monitoring of the oil spill.

Cooper Nuclear Station

On November 20, 2004, the service water system was clogged with sediment, resulting in an

unexpected pressure drop in both loops of service water, high differential pressure alarms on

both strainers, and isolation of the nonessential service water loads. Both trains exceeded the

differential pressure operability limit of 15 psid. Backwash automatically initiated and

successfully cleaned the Loop A strainer, but the analogous action for Loop B did not succeed

in cleaning the strainer. Operators opened the strainer bypass valve to restore service water

flow and subsequently cleaned both strainers.

On October 20, 2005, while preparing for online maintenance of the service water system, operators started a fourth service water pump and received high differential pressure alarms on

both Loops A and B. The automatic backwash did not sufficiently decrease the differential

pressure, and operators bypassed the strainer. Following these actions, the service water

system header pressures returned to normal. During the event, operators declared both loops

of service water inoperable. Both loops exceeded the strainer differential pressure structural

integrity limit of 15 psid. The high differential pressure across the strainers was the result of

debris (small rocks and sediment) introduced by the start of the fourth pump. With both loops

of service water inoperable, operators declared both emergency diesel generators inoperable.

In 2005, the NRC Region IV office organized a special inspection based on the repetitive nature

of this type of event (NRC Inspection Report 50-298/2005-15, ADAMS Accession

No. ML061160027).

Watts Bar Nuclear Plant

On November 22, 2004, while performing a manual valve exercising procedure, the licensee

identified that a centrifugal charging pump backup cooling line from the essential raw cooling

water system was completely blocked with silt. Approximately 2.5 gallons of muddy paste

passed through the 1-inch drain valve before the valve became blocked. The line had to be

cleared mechanically. This line is significant in that this is the only high head pump with a

backup source of cooling water (NRC Inspection Report 50-390, 391/2004-05, ADAMS

Accession No. ML050280344).

DISCUSSION

Cooper Nuclear Station

In both events, for a few minutes service water flow was lost to the nonessential header and

greatly reduced to the essential headers. In each case, the successful Loop A automatic

backwash precluded the need for a manual scram, which would have been required if the loss of turbine equipment cooling water had been prolonged. In each event, the Loop B filtering

function was overwhelmed by the inrush of sediment. The Loop B automatic backwash function

failed due to the lack of downstream pressure, which provides the motive force for the

backwashing operation. The licensee believes that the contributing external factor was the low

level of the Missouri River, the source of the service water system. Both of these events

occurred during autumn, following the navigation season. A weir wall is installed in the river in

front of the intake structure. The low river level caused an increased portion of the water that

flows into the intake structure to go around (rather than over) the weir wall and jet into the

service water bay. This circuitous flow entrained more sand due to the high flow and deposited

it in the intake structure near the service water pump intakes in the low-flow areas.

At the time of the October 2005 event, the licensee had not completed its actions to modify the

setpoint for automatic backwash of the strainer, alter the strainer intermittent backwash

frequency, modify the strainer differential pressure alarm setpoint, and implement weir-wall and

traveling-screen modifications.

NRC inspectors noted that the licensee had not performed certain actions committed to in its

response to NRC Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, specifically to periodically monitor silt levels and to periodically

examine the intake structure basin for silt, debris, and deterioration (including corrosion), using

divers or by dewatering the intake structure bay. At the time of the event, the licensee had not

examined the intake structure bay to assess its condition.

Watts Bar Nuclear Plant

The licensee generated 13 problem evaluation reports from early 2002 through late 2005 for

blockages identified in raw cooling water lines. The licensee identified silt accumulation in

portions of systems providing raw cooling water for both essential and nonessential purposes

and for high pressure water for fire protection. These accumulations were identified in both

stagnant and active cooling water lines, typically in system low points and in piping with low

water velocity. In 1999 and 2002, clam accumulations resulted from missed biocide treatments.

The licensee implemented periodic ultrasonic testing and flushing to identify and minimize

blockages due to silt and clam accumulations. The initial frequency of ultrasonic testing was

every 6 months, later shortened to every 3 months. However, the licensee determined that this

program did not cover all susceptible lines and components.

The centrifugal charging pump backup cooling line was not included in the ultrasonic testing

monitoring program. In 2000, a maintenance rule panel review left the flushing frequency for

this line at 18 months, not recognizing the consequences of silt accumulation. This conclusion

was consistent with the general site perception that silt accumulation was not a significant

problem. The blockage was found by means of an 18-month manual valve test. Most other

lines were being flushed or tested every 3 months. This issue resulted in a White finding in the

NRCs Significance Determination Process.

Raw water systems draw from a section of the Tennessee River downstream of the Watts Bar

dam. The suspended solids count in the river water increases after periods of heavy rains

upstream. The suspended solids are transported into the affected systems where they settle at

points with low fluid velocities. The licensees corrective actions for the violation included increasing the frequency of ultrasonic

testing, developing higher velocity flush procedures, and modifying systems to improve flushing.

Lessons learned included the following observations:

  • Silt accumulation in smaller diameter lines may not flush as readily as in larger diameter

lines.

  • Silt accumulates in stagnant lines off the main headers.
  • Lines with a vertical drop off the main headers are more susceptible to silt accumulation

than lines with horizontal legs off the main headers.

RELEVANT GENERIC COMMUNICATIONS

NRC Generic Letter 89-13, Service Water System Problems Affecting Safety-Related

Equipment

NRC GL 89-13 lists the following five recommendations for licensees:

  • Significantly reduce the incidence of flow blockage problems resulting from biofouling.
  • Conduct a test program to verify the heat transfer capability of all safety-related heat

exchangers cooled by service water, including initial and periodic retesting.

  • Ensure by a routine inspection and maintenance program for open-cycle service water

system piping and components that corrosion, erosion, protective coating failure, silting, and biofouling cannot degrade the performance of the safety-related systems supplied

by service water.

  • Confirm that the service water system will perform its intended function in accordance

with the licensing basis for the plant.

  • Confirm that maintenance practices, operating and emergency procedures, and training

that involves the service water system are adequate for ensuring that safety-related

equipment cooled by the service water system will function as intended and that

operators of this equipment will perform effectively.

NRC Information Notice 2004-07: Plugging of Safety Injection Pump Lubrication Oil Coolers

with Lakeweed

NRC IN 2004-07 also discusses operating experience related to service water system

susceptibilities due to external events.

CONCLUSION

The above events involve instances in which sediment and debris has blocked flow in one or

more service water lines. A number of the events described above involved the failure to take

adequate and timely corrective actions that could have prevented the event from occurring.

Often there were multiple previous occurrences that could have alerted licensees to take more

aggressive or broader corrective actions.

CONTACT

This information notice requires no specific action or written response. Please direct any

questions about this matter to the technical contacts listed below.

/RA/

Ho K. Nieh, Acting Director

Division of Policy and Rulemaking

Office of Nuclear Reactor Regulation

Technical Contacts: John D. Hanna, NRC/RIV Jonathan Bartley, NRC/RII

402-426-9611 423-365-5487 E-mail: jdh1@nrc.gov E-mail: jhb1@nrc.gov

C. Vernon Hodge, NRR/DIRS

301-415-1861 E-mail: cvh@nrc.gov

Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections.

ML061510292 OFFICE IOEB:DIRS TECH EDITOR RIV:DRP:RPB-E/FCS ADRO:DORL:LPL4 NAME CVHodge HChang (by e-mail) JDHanna (by e-mail) BJBenney

DATE 7/11/2006 06/14/2006 5/18/2006 7/12/2006 OFFICE RII:DRP:RPB6:WBRO ADRO:DORL:LPL2-2 ADRO:DORL:LPL1-2 TL:IOEB:DIRS

NAME JHBartley (by email) DVPickett SNBailey ICJung

DATE 6/29/2006 7/18/2006 7/ 19 /2006 7/20/2006 OFFICE PGCB:DPR LA:PGCB:DPR BC:PGCB:DPR D:DPR(A)

NAME DBeaulieu CHawes via e-mail CJackson HNieh (JLubinski)

DATE 07/28/2006 07 /28 /2006 08/01/2006 08/01/2006