Deficiencies Found in Thermo-Lag Fire Barrier InstallationML070180066 |
Person / Time |
---|
Site: |
Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant |
---|
Issue date: |
08/04/1994 |
---|
From: |
Grimes B Office of Nuclear Reactor Regulation |
---|
To: |
|
---|
References |
---|
IN-91-079, Suppl 1, NUDOCS 9408030006 |
Download: ML070180066 (7) |
|
Similar Documents at Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant |
---|
Category:NRC Information Notice
MONTHYEARInformation Notice 2020-02, Flex Diesel Generator Operational Challenges2020-09-15015 September 2020 Flex Diesel Generator Operational Challenges ML20225A0322020-09-0303 September 2020 NRC Choice Letter to NAC International with Attached Safety Inspection Report, IR 0721015/2020201, February 24-27, 2020 and July 22, 2020, Inspection of NAC International in Norcross, Georgia Information Notice 2012-09, PWROG-16043-NP-A, Revision 2, PWROG Program to Address NRC Information Notice 2012-09: Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength for Westinghouse and CE PWR Fuel Designs.2019-11-30030 November 2019 PWROG-16043-NP-A, Revision 2, PWROG Program to Address NRC Information Notice 2012-09: Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength for Westinghouse and CE PWR Fuel Designs. Information Notice 2011-20, NRC060 - NRC Information Notice 2011-20: Concrete Degradation by Alkali-Silica Reaction (Nov. 18, 2011)2019-07-24024 July 2019 NRC060 - NRC Information Notice 2011-20: Concrete Degradation by Alkali-Silica Reaction (Nov. 18, 2011) ML19196A2452019-07-15015 July 2019 Public Notice - Sequoyah Nuclear Plant, Unit 2 - Exigent Amendment to Facility Operating License Information Notice 2019-01, Inadequate Evaluation of Temporary Alterations2019-03-12012 March 2019 Inadequate Evaluation of Temporary Alterations ML16028A3082016-04-27027 April 2016 NRC Information Notice; IN 2016-05: Operating Experience Regarding Complications From a Loss of Instrumentation Air Information Notice 2015-05, Inoperability of Auxiliary and Emergency Feedwater Auto Start Circuits on Loss of Main Feedwater Pumps2015-05-12012 May 2015 Inoperability of Auxiliary and Emergency Feedwater Auto Start Circuits on Loss of Main Feedwater Pumps Information Notice 2015-05, Inoperability Of Auxiliary And Emergency Feedwater Auto Start Circuits On Loss Of Main Feedwater Pumps2015-05-12012 May 2015 Inoperability Of Auxiliary And Emergency Feedwater Auto Start Circuits On Loss Of Main Feedwater Pumps Information Notice 2013-20, OFFICIAL EXHIBIT - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143)2013-10-0303 October 2013 OFFICIAL EXHIBIT - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) Information Notice 2013-20, Official Exhibit - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143)2013-10-0303 October 2013 Official Exhibit - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) Information Notice 2013-11, OFFICIAL EXHIBIT - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013)2013-07-0303 July 2013 OFFICIAL EXHIBIT - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) Information Notice 2013-11, Official Exhibit - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013)2013-07-0303 July 2013 Official Exhibit - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Contain2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Con2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2010-12, Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notic2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2012-13, Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool2012-08-10010 August 2012 Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool Information Notice 2012-13, Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool2012-08-10010 August 2012 Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool Information Notice 2012-11, Age Related Capacitor Degradation2012-07-23023 July 2012 Age Related Capacitor Degradation ML12031A0132012-02-0606 February 2012 U.S. Nuclear Regulatory Commission Investigation Report No. 2-2010-058, Cpn International, Inc Information Notice 2011-19, Licensee Event Reports Containing Information Pertaining to Defects to Basic Components2011-09-26026 September 2011 Licensee Event Reports Containing Information Pertaining to Defects to Basic Components Information Notice 2011-15, Steel Containment Degradation and Associated License Renewal Aging Management Issues2011-08-0101 August 2011 Steel Containment Degradation and Associated License Renewal Aging Management Issues Information Notice 2011-17, Calculation Methodologies for Operability Determinations of Gas Voids in Nuclear Power Plant Piping2011-07-26026 July 2011 Calculation Methodologies for Operability Determinations of Gas Voids in Nuclear Power Plant Piping Information Notice 2011-13, Official Exhibit - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13)2011-06-29029 June 2011 Official Exhibit - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13) Information Notice 2011-13, Official Exhibit - Nys000329-00-Bd01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (Nrc in 2011-13)2011-06-29029 June 2011 Official Exhibit - Nys000329-00-Bd01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (Nrc in 2011-13) Information Notice 2011-13, OFFICIAL EXHIBIT - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13)2011-06-29029 June 2011 OFFICIAL EXHIBIT - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13) Information Notice 2011-04, IN: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 IN: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2011-04, In: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 In: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2011-04, in: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 in: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-2010-12-30030 December 2010 New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-19 Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review2010-12-30030 December 2010 New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-19 Information Notice 2010-26, 2010/12/21-NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-262010-12-21021 December 2010 2010/12/21-NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 ML13066A1872009-12-16016 December 2009 Draft NRC Information Notice 2009-xx - Underestimate of Dam Failure Frequency Used in Probabilistic Risk Assessments ML1007804482009-11-23023 November 2009 Email from Peter Bamford, NRR to Pamela Cowan, Exelon on TMI Contamination Control Event Information Notice 2009-11, NSP000059-Revised Prefiled Testimony of Northard/Petersen/Peterson-NRC Information Notice 2009-112009-07-0707 July 2009 NSP000059-Revised Prefiled Testimony of Northard/Petersen/Peterson-NRC Information Notice 2009-11 Information Notice 2009-10, Official Exhibit - NYS000019-00-BD01- NRC Information Notice 2009-10, Transformers Failures - Recent Operating Experience (Jul. 7, 2009) (NRC in 2009-10)2009-07-0707 July 2009 Official Exhibit - NYS000019-00-BD01- NRC Information Notice 2009-10, Transformers Failures - Recent Operating Experience (Jul. 7, 2009) (NRC in 2009-10) Information Notice 2009-09, Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify2009-06-19019 June 2009 Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify Information Notice 2008-12, Reactor Trip Due to Off-Site Power Fluctuation2008-07-0707 July 2008 Reactor Trip Due to Off-Site Power Fluctuation Information Notice 2008-11, Service Water System Degradation at Brunswicksteam Electric Plant Unit 12008-06-18018 June 2008 Service Water System Degradation at Brunswicksteam Electric Plant Unit 1 Information Notice 2008-04, Counterfeit Parts Supplied to Nuclear Power Plants2008-04-0707 April 2008 Counterfeit Parts Supplied to Nuclear Power Plants Information Notice 1991-09, Counterfeiting of Crane Valves2007-09-25025 September 2007 Counterfeiting of Crane Valves Information Notice 2007-28, Potential Common Cause Vulnerabilities in Essential Service Water Systems Due to Inadequate Chemistry Controls2007-09-19019 September 2007 Potential Common Cause Vulnerabilities in Essential Service Water Systems Due to Inadequate Chemistry Controls Information Notice 2007-29, Temporary Scaffolding Affects Operability of Safety-Related Equipment2007-09-17017 September 2007 Temporary Scaffolding Affects Operability of Safety-Related Equipment Information Notice 2007-14, Loss of Offsite Power and Dual-Unit Trip at Catawba Nuclear Generating Station2007-03-30030 March 2007 Loss of Offsite Power and Dual-Unit Trip at Catawba Nuclear Generating Station Information Notice 2007-06, Potential Common Cause Vulnerabilities in Essential Service Water Systems2007-02-0909 February 2007 Potential Common Cause Vulnerabilities in Essential Service Water Systems Information Notice 2007-05, Vertical Deep Draft Pump Shaft and Coupling Failures2007-02-0909 February 2007 Vertical Deep Draft Pump Shaft and Coupling Failures Information Notice 2006-31, Inadequate Fault Interrupting Rating of Breakers2006-12-26026 December 2006 Inadequate Fault Interrupting Rating of Breakers Information Notice 2006-29, Potential Common Cause Failure of Motor-operated Valves as a Result of Stem Nut Wear2006-12-14014 December 2006 Potential Common Cause Failure of Motor-operated Valves as a Result of Stem Nut Wear Information Notice 2006-29, Potential Common Cause Failure of Motor-operated Valves As a Result of Stem Nut Wear2006-12-14014 December 2006 Potential Common Cause Failure of Motor-operated Valves As a Result of Stem Nut Wear Information Notice 2006-13, E-mail from M. Mclaughlin on NRC, Regarding NRC Information Notice 2006-13: Groundwater Contamination2006-07-13013 July 2006 E-mail from M. Mclaughlin on NRC, Regarding NRC Information Notice 2006-13: Groundwater Contamination 2020-09-03 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Mcguire]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Mcguire]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] </code>. |
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
WASHINGTON, D.C. 20555 August 4, 1994 NRC INFORMATION NOTICE 91-79, SUPPLEMENT 1: DEFICIENCIES FOUND IN THERMO-LAG
FIRE BARRIER INSTALLATION
Addressees
All holders of operating licenses or construction permits for nuclear power
reactors.
Purpose
The U. S. Nuclear Regulatory Commission (NRC) is issuing this information
notice (IN) supplement to alert addressees to additional problems that could
result from improperly installing Thermo-Lag 330-1 fire barriers to satisfy
NRC fire protection requirements for safe shutdown components. It is expected
that recipients will review the information for applicability to their
facilities and consider actions, as appropriate, to avoid similar problems.
However, suggestions contained in this information notice are not NRC
requirements; therefore, no specific action or written response is required.
Backqround
On December 6, 1991, NRC issued IN 91-79, "Deficiencies in the Procedures for
Installing Thermo-Lag Fire Barrier Materials." The IN discussed Thermo-Lag
fire barrier configurations that were not installed in accordance with the
installation procedures published by the vendor, Thermal Science, Incorporated
(TSI). Most of the deficiencies were found by comparing TSI installation
procedures with records of methods and procedures used by licensees during
actual installation of Thermo-Lag fire barriers. In some cases, the
installation methods that deviated from installation procedures recommended by
the vendor were found to be unacceptable when subsequent qualification fire
endurance testing resulted in fire barrier failures. In other cases, fire
endurance test or engineering analysis had not been performed to support the
deviating installation.
Description of Circumstances
On July 15, 1994, Detroit Edison Company, the licensee for Enrico Fermi Atomic
Power Plant, Unit 2, (Fermi 2) notified NRC pursuant to Part 21, "Reporting of
Defects and Noncompliance," of Title 10 of the Code of Federal Regulations (10
CFR Part 21). The Notification reported deviations and defects in Thermo-Lag
fire barrier installation at Fermi 2. While removing and replacing Thermo-Lag
fire barriers, the licensee found deficiencies such as insufficient Thermo-Lag
trowel grade material on interferences, inconsistently positioned ribbed
9408030006 q
IN 91-79, Supp. 1 August 4, 1994 faces, insufficient cable protection at the fire stops, expanded metal missing
from wall assembly, Thermo-lag panels used in place of support steel, failure
to fasten the panels to the floor as required, and insufficient
clearance around fire dampers. It appears that installation records did not
reflect the "as-built" condition of these barriers. Employees from the P. R.
Sussman Company of Toledo, Ohio, installed the Thermo-Lag fire barriers at
Fermi 2.
The findings at Fermi 2 substantiate NRC concerns stated in IN 92-46, "Thermo- Lag Fire Barrier Material Special Review Team Final Report Findings, Current
Fire Endurance Tests, and Ampacity Calculation Error," June 23, 1992. The
concerns are that records of methods and procedures used during installation
of Thermo-Lag barriers may be inaccurate, incomplete, or missing.
Discussion
On December 17, 1992, NRC issued Generic Letter (GL) 92-08, "Thermo-Lag 330-1 Fire Barriers." The GL requested licensees to confirm that qualified Thermo- Lag fire barriers had been installed with appropriate procedures and quality
controls. Most licensees responded that they had followed the procedures
recommended by the vendor, TSI. The responses also indicated that most
licensees were waiting for the results of the industry test program sponsored
by the Nuclear Energy Institute (NEI) before taking corrective actions.
By December 1993, it had become apparent to the NRC staff that the NEI test
program, alone, would not be sufficient to resolve the Thermo-Lag fire barrier
issues. Therefore, in accordance with 10 CFR 50.54(f), NRC issued requests
for additional information (RAI) to the licensees relying on Thermo-Lag to
meet Appendix R requirements. The RAI asked each licensee to submit detailed
information on such test assembly elements as material thickness, joints, bands, tie-wires, stress skin and supports. The RAI also requested each
licensee to state whether the parameters defining these elements were obtained
and verified and to describe the type and extent of the unknown parameters.
Many licensees did not supply the information requested but stated how they
would get it in the future.
In responding to the RAI, Detroit Edison Company advised NRC that it would not
wait for the results of the NEI test program and would resolve Thermo-Lag
issues at Fermi 2 by either removing or reclassifying Thermo-Lag fire
barriers. During these modifications the licensee found installation
deficiencies described above and reported them to NRC.
As noted in GL 86-10, Supplement 1, "Fire Endurance Test Acceptance Criteria
for Fire Barrier Systems Used to Separate Redundant Safe Shutdown Trains
Within the Same Fire Area," dated March 25, 1994, test specimens intended for
fire endurance qualification testing of fire barriers should represent the
construction of these barriers in material and workmanship. The findings at
Fermi 2 illustrate that examination of installation records may not be
sufficient to determine how the original Thermo-Lag fire barriers were
installed.
IN 91-79, Supp. I
August 4, 1994 Related Generic Communications
Endurance Test," August 6, 1991.
" IN 92-46, "Thermo-Lag Fire Barrier Material Special Review Team Final
Report Findings, Current Fire Endurance Tests, and Ampacity Calculation
Errors," June 23, 1992.
" Bulletin (BL) 92-01, "Failure of Thermo-Lag 330 Fire Barrier System to
Maintain Cabling in Wide Cable Trays and Small Conduits Free from Fire
Damage," June 24, 1992
- BL 92-01, Supplement 1, "Failure of Thermo-Lag 330 Fire Barrier System
to Perform its Specified Fire Endurance Function," August 28, 1992.
- GL 86-10, Supplement 1, "Fire Endurance Test Acceptance Criteria for
Fire Barrier Systems Used to Separate Redundant Safe Shutdown Trains
Within the Same Fire Area," March 25, 1994.
This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact
the technical contact listed below or the appropriate Office of Nuclear
Reactor Regulation (NRR) project manager.
Brian K. Grimes, Director
Division of Operating Reactor Support
Office of Nuclear Reactor Regulation
Technical contact: Daniele H. Oudinot, NRR
(301) 504-3731 Attachment:
List of Recently Issued NRC Information Notices
'I4
Att..hment
IN 91-79, Supp. I
August 4, 1994 Page I of I
LIST OF RECENTLY ISSUED
NRC INFORMATION NOTICES
Information Date of
Notice No. Subject Issuance Issued to
94-54 Failures of General 08/01/94 All holders of OLs or CPs
Electric Magne-Blast for nuclear power reactors.
Circuit Breakers to
Latch Closed
91-45, Possible Malfunction of 07/29/94, All holders of OLs or CPs
Supp. 1 Westinghouse ARD, BFD, for nuclear power reactors.
and NBFD Relays, and
A200 DC and DPC 250
Magnetic Contactors
94-42, Cracking in the Lower 07/19/94 All holders of OLs or CPs
Supp. 1 Region of the Core Shroud for boiling water reactors
in Boiling-Water Reactors (BWRs).
94-53 Hydrogen Gas Burn Inside 07/18/94 All holders of OLs or CPs
Pressurizer During Welding for nuclear power reactors.
94-52 Inadvertent Containment 07/15/94 All holders of OLs or CPs
Spray and Reactor Vessel for nuclear power reactors.
Draindown at Millstone
Unit I
94-51 Inappropriate Greasing 07/15/94 All holders of OLs or CPs
of Double Shielded Motor for nuclear power reactors.
Bearings
94-50 Failure of General 07/14/94 All holders of OLs or CPs
Electric Contactors for nuclear power reactors.
to Pull in at the
Required Voltage
94-49 Failure of Torque 07/06/94 All holders of OLs or CPs
Switch Roll Pins for nuclear power reactors.
94-48 Snubber Lubricant 06/30/94 All holders of OLs or CPs
Degradation in High- for nuclear power reactors.
Temperature Environments
OL = Operating License
CP = Construction Permit
IN 91-79, Supp. 1 August 4, 1994 Related Generic Communications
" IN 91-47, "Failure of Thermo-Lag Fire Barrier Material to Pass Fire
Endurance Test," August 6, 1991.
Report Findings, Current Fire Endurance Tests, and Ampacity Calculation
Errors," June 23, 1992.
Bulletin (BL) 92-01, "Failure of Thermo-Lag 330 Fire Barrier System to
Maintain Cabling in Wide Cable Trays and Small Conduits Free from Fire
Damage," June 24, 1992 BL 92-01, Supplement 1, "Failure of Thermo-Lag 330 Fire Barrier System
to Perform its Specified Fire Endurance Function," August 28, 1992.
GL 92-08, "Thermo-Lag 330-1 Fire Barriers," December 17, 1992.
- GL 86-10, Supplement 1, "Fire Endurance Test Acceptance Criteria for
Fire Barrier Systems Used to Separate Redundant Safe Shutdown Trains
Within the Same Fire Area," March 25, 1994.
This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact
the technical contact listed below or the appropriate Office of Nuclear
Reactor Regulation (NRR) project manager.
orig /s/'d by BKGrimes
Brian K. Grimes, Director
Division of Operating Reactor Support
Office of Nuclear Reactor Regulation
Technical contact: Daniele H. Oudinot, NRR
(301) 504-3731 Attachment:
List of Recently Issued NRC Information Notices
OFFICE *SPLB/NRR *C:SPLB/NRR *D:DSSA/NRR *OGCB/NRR
NAME DHOudinot CEMcCracken MJVirgilio RJKiessel
DATE 07/29/94 07/29/94 07/29/94 07/29A44/`
OFFICE *Tech Ed *D:OI *C:OGCB/NRR . R R
NAME JMain JM JAFitzgerald ELDoolittle * 'Nes
DATE 07/27/94 08/01/94 08/01/94 08/Z /94 Document Name: 91-79SP1.IN
IN 94-xx
July xx, 1994 Related Generic Communications
Endurance Test," August 6, 1991.
" IN 92-46, "Thermo-Lag Fire Barrier Material Special Review Team Final
Report Findings, Current Fire Endurance Tests, and Ampacity Calculation
Errors," June 23, 1992.
- Bulletin (BL) 92-01, "Failure of Thermo-Lag 330 Fire Barrier System to
Maintain Cabling in Wide Cable Trays and Small Conduits Free from Fire
Damage," June 24, 1992
- BL 92-01, Supplement 1, "Failure of Thermo-Lag 330 Fire Barrier System
to Perform its Specified Fire Endurance Function," August 28, 1992.
- GL 86-10, Supplement 1, "Fire Endurance Test Acceptance Criteria for
Fire Barrier Systems Used to Separate Redundant Safe Shutdown Trains
Within the Same Fire Area," March 25, 1994.
This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact
the technical contact listed below or the appropriate Office of Nuclear
Reactor Regulation (NRR) project manager.
Brian K. Grimes, Director
Division of Operating Reactor Support
Office of Nuclear Reactor Regulation
Technical contact: Daniele H. Oudinot, NRR
(301) 504-3731 Attachment:
List of Recently Issued NRC Information Notices
- see previous concurrence ________-_______
OFFICE
NAME
DATE
{ SPLB/NRR 7!
Hr*dlot
07/ .'/94 J;/
CE-Cr
07/)f/94 n
D:DSSA/NRR
MJVirgiliol'
07/.h/94 OGCB/NRR
RJKi esseli J/i
0_7_
_ _9_4
_r_*_
OFFICE *Tech Ed fD:OI C:;8GýB/NRR D:DORS/NRR
NAME JMain JM JAFitzgerald EioD'e.Itttle BKGrimes
DATE 07/27/94 07/ /94 07/f /94 07/ /94 Document Name: G:\RJK\NRCINS\NRCIN.474
IN 94-xx
July xx, 1994 Related Generic Communications
" IN 91-47, "Failure of Thermo-Lag Fire Barrier Material to Pass Fire
Endurance Test," August 6, 1991.
Report Findings, Current Fire Endurance Tests, and Ampacity Calculation
Errors," June 23, 1992.
- Bulletin (BL) 92-01, "Failure of Thermo-Lag 330 Fire Barrier System to
Maintain Cabling in Wide Cable Trays and Small Conduits Free from Fire
Damage," June 24, 1992
- BL 92-01, Supplement 1, "Failure of Thermo-Lag 330 Fire Barrier System
to Perform its Specified Fire Endurance Function," August 28, 1992.
- GL 86-10, Supplement 1, "Fire Endurance Test Acceptance Criteria for
Fire Barrier Systems Used to Separate Redundant Safe Shutdown Trains
Within the Same Fire Area," March 25, 1994.
This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact
the technical contact listed below or the appropriate Office of Nuclear
Reactor Regulation (NRR) project manager.
Brian K. Grimes, Director
Division of Operating Reactor Support
Office of Nuclear Reactor Regulation
Technical contact: Daniele H. Oudinot, NRR
(301) 504-3731 Attachment:
List of Recently Issued NRC Information Notices
nrevious concurrence
see nrvious concurrence..
OFFICE SPLB/NRR C:SPLB/NRR D:DSSA/NRR OGCB/NRR
NAME DHOudinot CEMcCracken MJVirgilio RJKiessel / J
DATE 07/ /94 07/ /9,4-i, 07/ /94 071& 94 OFFICE *Tech Ed D:OI /) C:OGCB/NRR D:DORS/NRR
NAME JMain Ja ,:-JAFA'zgerald ELDool ittle BKGrimes
DATE 07/27/94 / 0 1/!/94 ) 07/ /94 07/ /94 uocument Name: U~:\K.JK\HrKLGiN-)\NKUiN.Q4/4
/L1 /
|
---|
|
list | - Information Notice 1991-01, Supplier of Misrepresented Resistors (4 January 1991, Topic: Fitness for Duty, Overspeed)
- Information Notice 1991-02, Brachytherapy Source Management (7 January 1991, Topic: Fitness for Duty, Brachytherapy, Overspeed)
- Information Notice 1991-03, Management of Wastes Contaminated with Radioactive Materials (Red Bag Waste & Ordinary Trash) (7 January 1991, Topic: Fitness for Duty, Brachytherapy)
- Information Notice 1991-04, Reactor Scram Following Control Rod Withdrawal Associated with Low Power Turbine Testing (28 January 1991, Topic: Fitness for Duty)
- Information Notice 1991-05, Intergranular Stress Corrosion Cracking in Pressurized Water Reactor Safety Injection Accumulator Nozzles (30 January 1991, Topic: Fitness for Duty, Hydrostatic, Intergranular Stress Corrosion Cracking, Liquid penetrant)
- Information Notice 1991-06, Lock-up of Emergency Diesel Generator and Load Sequencer Control Circuits Preventing Restart of Tripped Emergency Diesel Generator (31 January 1991, Topic: Fitness for Duty, Brachytherapy, Overspeed)
- Information Notice 1991-07, Maintenance Deficiency Associated with General Electric Horizontal Custom 8000 Induction Motors (4 February 1991, Topic: Fitness for Duty, Brachytherapy)
- Information Notice 1991-08, Medical Examinations for Licensed Operators (5 February 1991, Topic: Brachytherapy)
- Information Notice 1991-09, Counterfeiting of Crane Valves (25 September 2007)
- Information Notice 1991-10, Summary of Semiannual Program Performance Reports on Fithess-For-Duty (FFD) in the Nuclear Industry (12 February 1991)
- Information Notice 1991-12, Potential Loss of Net Positive Suction Head (NPSH) of Standby Liquid Control System Pumps (15 February 1991)
- Information Notice 1991-13, Inadequate Testing of Emergency Diesel Generators (Edgs) (4 March 1991)
- Information Notice 1991-13, Inadequate Testing of Emergency Diesel Generators (EDGs) (4 March 1991)
- Information Notice 1991-14, Recent Safety-Related Incidents at Large Irradiators (5 March 1991, Topic: Fitness for Duty, Coatings, Incorporated by reference, Brachytherapy, Uranium Hexafluoride, Overexposure)
- Information Notice 1991-15, Incorrect Configuration of Breaker Operating Springs in General Electric AK-Series Metal-Clad Circuit Breakers (6 March 1991)
- Information Notice 1991-16, Unmonitored Release Pathways from Slightly Contaminated Recycle and Recirculation Water Systems at a Fuel Facility (6 March 1991, Topic: Fitness for Duty, Brachytherapy)
- Information Notice 1991-17, Fire Safety of Temporary Installation or Services (11 March 1991)
- Information Notice 1991-18, High-Energy Piping Failures Caused by Wall Thinning (18 December 1991, Topic: Feedwater Heater)
- Information Notice 1991-19, Steam Generator Feedwater Distribution Piping Damage (12 March 1991)
- Information Notice 1991-20, Electrical Wire Insulation Degradation Caused Failure in a Safety-Related Motor Control Center (19 March 1991)
- Information Notice 1991-21, Inadequate Quality Assurance Program of Vendor Supplying Safety-Related Equipment (19 March 1991)
- Information Notice 1991-22, Four Plant Outage Events Involving Loss of AC Power or Coolant Spills (19 March 1991)
- Information Notice 1991-23, Accidental Radiation Overexposures to Personnel Due to Industrial Radiography Accessory Equipment Malfunctions (26 March 1991, Topic: Fitness for Duty, Brachytherapy, Overexposure)
- Information Notice 1991-24, Recent Operating Experience Involving Reactor Operation Without a Licensed Reactor Operator or Senior Reactor Operator Present in the Control Room (26 March 1991)
- Information Notice 1991-25, Commercial-Grade Structural Framing Components Supplied As Nuclear Safety-Related Equipment (1 April 1991)
- Information Notice 1991-25, Commercial-Grade Structural Framing Components Supplied as Nuclear Safety-Related Equipment (1 April 1991)
- Information Notice 1991-26, Potential Nonconservative Errors in the Working Format Hansen-Roach Cross-Section Set Provided with Keno and Scale Codes (2 April 1991, Topic: Fitness for Duty, Brachytherapy)
- Information Notice 1991-27, Incorrect Rotation of Positive Displacement Pump (10 April 1991)
- Information Notice 1991-28, Cracking in Feedwater System Piping (15 April 1991)
- Information Notice 1991-29, Deficiencies Identifie During Electrical Distribution System Functional Inspections (15 April 1991)
- Information Notice 1991-30, Inadequate Calibration of Thermoluminescent Dosimeters Utilized to Monitor Extremity Dose at Uranium Processing and Fabrication Facilities (23 April 1991, Topic: Brachytherapy, Uranium Hexafluoride, Depleted uranium)
- Information Notice 1991-31, Nonconforming Magnaflux Magnetic Particle (14AM) Prepared Bath (9 May 1991)
- Information Notice 1991-32, Possible Flaws in Certain Piping Systems Fabricated by Associated Piping and Engineering (15 May 1991, Topic: Hot Short, Intergranular Stress Corrosion Cracking, Liquid penetrant)
- Information Notice 1991-33, Reactor Safety Information for States During Exercises and Emergencies (31 May 1991)
- Information Notice 1991-34, Potential Problems in Identifying Causes of Emergency Diesel Generator Malfunctions (3 June 1991)
- Information Notice 1991-35, Labeling Requirements for Transporting Multi-Hazard Radioactive Materials (7 June 1991)
- Information Notice 1991-36, Nuclear Plant Staff Working Hours (10 June 1991)
- Information Notice 1991-37, Compressed Gas Cylinder Missile Hazards (10 June 1991)
- Information Notice 1991-38, Thermal Stratification in Feedwater System Piping (13 June 1991, Topic: Unanalyzed Condition)
- Information Notice 1991-39, Compliance with 10 CFR Part 21, Reporting of Defects and Noncompliance. (17 June 1991)
- Information Notice 1991-40, Contamination of Nonradioactive System and Resulting Possibility for Unmonitored, Uncontrolled Release to the Environment (19 June 1991)
- Information Notice 1991-41, Potential Problems with the Use of Freeze Seals (27 June 1991)
- Information Notice 1991-42, Plant Outage Events Involving Poor Coordination Between Operations and Maintenance Personnel During Valve Testing and Manipulations (27 June 1991)
- Information Notice 1991-43, Recent Incidents Involving Rapid Increases in Primary-To-Secondary Leak Rate (5 July 1991, Topic: Grab sample)
- Information Notice 1991-45, Possible Malfunction of Westinghouse Ard, Bfd, & Nbfd Relays, & A200 DC & DPC 250 Magnetic Contactors (5 July 1991, Topic: Commercial Grade)
- Information Notice 1991-46, Degradation of Emergency Diesel Generator Fuel Oil Delivery Systems (18 July 1991)
- Information Notice 1991-47, Failure of Thermo-Lag Fire Barrier Material to Pass Fire Endurance Test (6 August 1991, Topic: Safe Shutdown, Fire Barrier)
- Information Notice 1991-48, False Certificates of Conformance Provided by Westinghouse Electric Supply Company for Refurbished Commercial-Grade Circuit Breakers (9 August 1991, Topic: Fire Barrier)
- Information Notice 1991-49, Enforcement of Safety Requirements for Radiographers (15 August 1991, Topic: High Radiation Area, Fire Barrier, Overexposure)
- Information Notice 1991-50, a Review of Water Hammer Events After 1985 (20 August 1991, Topic: Fire Barrier, Water hammer)
... further results |
---|