e DETAILS Meetin Partici ants USNRC J.
B. Martin, Regional Administrator D. F. Kirsch, Director, Division of Reactor Safety and Projects G.
W. Knighton, Director, Project Directorate V,
NRR F. A. Wenslawski, Chief, Emergency Preparedness and Radiological Protection Branch A. D. Johnson, Enforcement Officer E. A. Licitra, Palo Verde Project Manager, NRR S.
A. Richards, Chief, Engineering Section T. J. Polich, Senior Resident Inspector, Palo Verde Site Arizona Nuclear Power Pro 'ect ANPP E.
E.
J.
G.
L. G.
R.
M.
J.
E.
W. E.
T.
D.
Van Brunt, Executive Vice President Haynes, Vice President, Nuclear Production Papworth, Director, guality Assurance-Butler, Director, Standards and Technical Support Allen, Director, Engineering and Construction Ide, Unit 2 Plant Manager Shriver, Compliance Manager 2.
Meetin-Pur ose An enforcement conference and management meeting was held on February 29, 1988, at the NRC Region V offices in Walnut Creek, California.
The enforcement conference related to the licensee's inadvertently rendering inoperable the steam driven auxiliary feedwater (AFW) pumps in Units I and 2, as described in Licensee Event Report (LER) 50-528/87-025.
The management meeting focused on several recent events at Palo verde, an update on previously discussed issues; and a discussion of the recently issued SALP report.
A summary of each area discussed is provided below.
3.
Enforcement Conference Mr. Martin opened the discussion by stating his desire that the dialogue be both open and to the point.
Mr. Martin stated that recent events at Palo Verde indicate a need to focus on personnel performance and that any developing problems should be addressed now by the licensee, rather than acting later in response to a significant event.
Mr. Martin expressed concern that his recent visit to Palo Verde was generally unfavorable, particularly with regard to the working atmosphere in the Unit 2 control room.
He also expressed his concern that ANPP management is not devoting sufficient personal time to direct, meaningful observation of plant activities.
Mr. Van Brunt concurred that several indicators point to a
need to reaffirm management expectations with his staff and stated that his staff shared Mr. Martin's concern over recent events.
8804200505 88040i PDR ADOCK 05000528
1,
the design basis manual for the AFW system be provided to Region V for review and Mr.
Van Brunt agreed.
Nr. Butler than led a discussion on the status of the licensee's system engineer program.
A schedule for completion of milestones is contained in enclosure 2 of this report.
Mr. Martin emphasized the need to ensure that the expectations for system engineers is clearly defined.
Mr.
Nartin also observed that it would be worthwhile for management to periodically talk directly to the system engineers to ensure that they are properly directed.
Mr. Butler concurred in these comments.
Mr. Allen then described the corporate engineering involvement in onsite activities.
This lead to a discussion of the need to be technically self-sufficient.
Mr. Allen noted that ANPP intends to continue to use outside engineering resources to -accomplish part of.their workload.
Nr.
Martin agreed that a division of work was acceptable; however, he felt that the licensee's engineering person'nel needed to be technically capable of overseeing the work of contractors.
Additionally, Mr. Martin suggested that a strong utility requires excellence in three components:
operations, quality assurance, and engineering.
Nr. Hartin observed that ANPP needs to promote engineering involvement and ownership in the plant, and then hold engineering accountable for problems that should have been foreseen by the engineers.
U date on Simulator Utilization Nr. Van Brunt described the licensee's efforts to achieve their cormitment of providing 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> of simulator time to each licensed operator each year.
This action is on schedule and expected to be achieved.
Additionally, actions have been taken to receive feedback from the operations department on the type of training being received by the operators.
Status of the Maintenance Backlo Nr. Butler briefly discussed the status of licensee efforts to manage the number and type of outstanding maintenance items.
Senior management is reportedly now receiving monthly status reports.
Goals have been established for the number of various priority levels of maintenance items and a comparison of the licensee's data with the INPO industry average is favorable.
The licensee maintains that the maintenance data base is now accurate and that their focus is on reducing the total long-term backlog to the degree possible.
Status of ualit Assurance Director Develo ment Mr. Van Brunt briefly described actions b'eing taken to develop Mr. Papworth as the new Director of Quality Assurance (QA), which will include formal training from an outside contractor.
Mr. Martin expressed his concern that ANPP did not seem to have a strong commitment to ensuring that QA is a major factor in the operation of Palo Verde.
Hr. Martin questioned the degree to which QA has participated in the resolution of the events discussed during the meeting and questioned whether QA had detected early on any indications of declining performance.
Mr. Martin
l
jg s
Poc<NenP Co~Pto3 De~K NOTE TO:
FROM:
Document Control Desk, 016 l
I 7AI5
)5'
Co't tc.c.f 'tllg
/~+/~v
~hi >
/efg~v i S P/ease cc/
iF p'ov
'ogp The Attached document was not properli Control System (DCS) in accordance wif Documentation in the NRC Document Conf area of non-compliance.)
- nt
+o Qy +&as%
fj'equi ot1 Y
'7s Qc g-pS /3 Documents submitted for placement in PDR must be sent to the Document Control Desk, 016 Phillips not to the PDR Document type not approved for placement in the DCS.
(See NRC Manual Chapter-0232, Part 2)
Document not of sufficient quality to produce microfiche suitable for archival storage (See NRC Manual Chapter-0232, Part 1. ZI.B.1.a).
No Photostatic copies or carbon copies of documentation (except NRC Form D
318, the Official Concurrence Copy) is accepted for entry into DCS without a notation that the responsible program ofFice has certiFied it as the official record copy.
Before sending enclosures that are themselves identifiable stand-alone documents, the forwarding office must confirm that the document is not already on DCS.
(See NRC Manual Chapter-0232, Part 1. ZE.C.9.)
No Nrc formal publications (e.g.,
NUREGS, Regulatory Guides, ETC.) should be sent to DCS or the PDR by staff separately or as enclosures.
Correspondence to multiple addressees must be handled in accordance with NRC Appendix 0240.
Contractor material will be processed in accordance with Chapter NRC-3202, Chapter NRC-1102, and NRC Bulletin 1401-3.
Document Rejected by DCS Contractor as Duplicate of item previously entered into DC.