1 &lW
'
.
,
DEC I 0199F
. Tennessee Valley' Authority
ATTN: 11r. H. G. Parris
Manager of Power
500A' Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
Subject:
PeportNos.h18/81-h)50-519/81-22,50-520/81-22,and.50-521/81-22
This refers to the routine safety inspection conducted by Mr. W. B. Swan of this
office on: November _ 2-30,-1981, of activities authorized by-NRC Construction -
Permit Nos. CPPR-150, CPPR-151, CPPR-152, and CPPR-153 for. the Hartsville
facility and to the discussion of our findings held with Mr. R. T. Hathcote,
Project flanager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations uere disclosed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)
will be placed in the NRC's Public Document Room.unless you notify this office,
by telephone, within ten days of the date of this letter and submit written-
. application to withhold 'information . contained therein within thirty days of the
date of this letter.
Such application must be consistent with the requirements
of2.790(b)(1).
Should you have'any questions concerning this letter, we will be glad to discuss
them with you.
[ Q ~g> Rr/ g
g
,
Sincerely,
y;g
s.
s
&'l
7 s.
Czy
Q
E9;~' &}j'
(-
R. C. Lewis, Director \\
Division of hsident and.
4
,/
'
Reactor Project Inspection
.-
. f
%V
Enclosures:
Inspection Report Nos. 50-518/81-22
50-519/81-22, 50-520/81-22, and
50-521/81-22
cc's see'page 2
O!do$df
PDR.
V
_
Ia
ZEol
L
--
- --- _
-_
_
- - - - _ _
--- - _ - _
_
_ _ _ _ _ _ _
.
.
DEC 10193g
Tennessee Valley Authcrity
2
cc w/ encl:
H. J. Green, Director of Nuclear Power
R. T. Hathcote, Project fianager
J. F. Cox, Supervisor, Nuclear
Licensing Section
J. E: Wills, Project Engineer
H. N. Culver, Chief
Nuclear Safety Review Staff
bec w/ encl:
NRC Resident Inspector
Document itanagement Branch
State of South Carolina
RII ,
RII
RII
RI
fNO
fi
4W
n:dt
RBncher
FCantfell
RClewis
WBSwp/81
12/ob
12/jc/81
12/jp/81
12t /81
1
_ _ . _ .
. . . . . . . . . . .
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ . _ _ _ . _ _
_ _ _ _ _
_______.j