ML20040E842

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 811117-20
ML20040E842
Person / Time
Site: Hartsville 
Issue date: 12/10/1981
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20040E833 List:
References
50-518-81-20, NUDOCS 8202050429
Download: ML20040E842 (1)


Text

. -_

APPENDIX A NOTICE OF VIOLATION, Tennessee Valley Authority Docket No. 50-518 Hartsville License No. CPPR-150 As a result of the inspection conducted on November 17-20, 1981, and in accord-ance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified.

10 CFR 50, Apoendix B, Criterion V, requires that activities affecting quality shall be prescribed by documented procedures and instructions and shall be accomplished in accordance with these procedures'and instructions.

Specification N6C-875 and its referenced specification G-9 specifies that surfaces too smooth for proper bonding shall be scarified before placing additional fill.

Contrary to the above, on November 19, 1981, during backfill operations adjacent to the ERCW pipeline in the area of the A-1 spray pond, backfill was placed on top of a smooth surface without any prior scarifying.

The backfill surface had a smoothed polished surface as a result of sealing the surface with tampers at the close of fill operations on the previous day.

This is a Severity Level V Violation (Supplement II.E).

Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of the alleged viola-tion; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Consideration may be given to extending your response time for good cause shown. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.

Date:

L 8202050429 820122 PDR ADOCK 05000518

.O PDR

.