IR 05000498/2011404

From kanterella
Jump to navigation Jump to search
IR 05000498-11-404 & 05000499-11-404, on 03/11/11, South Texas Project, NRC Material Control and Accounting Program
ML110980394
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/07/2011
From: Greg Werner
NRC/RGN-IV/DRS/PSB-2
To: Halpin E
South Texas
References
IR-11-404
Download: ML110980394 (4)


Text

April 7, 2011

Mr. Edward President and Chief Executive Officer STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483

Subject:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION -

NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000498/2011404 AND 05000499/2011404

Dear Mr. Halpin:

On March 11, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed an onsite security baseline inspection at your South Texas Project Electric Generating Station, Units 1 and 2, facility. The inspection covered a key attribute of the Security Cornerstone of the NRCs Reactor Oversight Process, Material Control and Accounting of Special Nuclear Material.

The enclosed inspection report documents the inspection results, which were discussed on March 11, 2011, with Mr. D. Rencurrel, Senior Vice President, Units 1 and 2, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system, (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the

UNITED STATES NUCLEAR REGULATORY COMMISSION R EG IO N I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 STP Nuclear Operating Company

- 1 - enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Gregory E. Werner, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket Nos.: 50-498; 50-499 Licenses: NPF-76, NPF-80

Nonpublic Enclosure:

NRC Inspection Report 05000498/2011404; 05000499/2011404 w/Attachment:

Supplemental Information

cc w/o enclosure:

Kevin Richards, Senior Vice President and Assistant to CEO STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483

David W. Rencurrel Senior Vice President Units 1 and 2 STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483 STP Nuclear Operating Company

- 2 - Louis Peter, Plant General Manager STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483

Tim Powell, Vice President, Engineering STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483

A. W. Harrison, Manager, Licensing STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483

Charles T. Bowman, General Manager, Oversight STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483

Marilyn Kistler Senior Staff Specialist, Licensing STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483

cc w/enclosure:

M. C. Reddix Manager, Security STP Nuclear Operating Company P. O. Box 289 Wadsworth, Texas 77483 STP Nuclear Operating Company

- 3 - Distribution w/enclosure:

Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Senior Resident Inspector (John.Dixon@nrc.gov)

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

Resident Inspector (Binesh.Tharakan@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)

STP Administrative Assistant (Lynn.Wright@nrc.gov)

Project Engineer, DRP/A (Laura.Micewski@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Mohan.Thadani@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource OEDO RIV Coordinator (Nathan.Sanfilippo@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

Report:

SUNSI Review Completed: DCG ADAMS:

Yes G No Initials: DCG G Publicly Available G Non-Sensitive Non-Publicly Available Sensitive

Letter Only:

SUNSI Review Completed: DCG ADAMS: Yes G No Initials: DCG Publicly Available Non-Sensitive G Non-Publicly Available G Sensitive

PSB2 PSB2 C:PSB2 A:DRP/

C:PSB2

LCCarsonII DCGraves GEWerner WCWalker GEWerner

/RA/

/RA/

/RA/

/RA/

/RA/

3/28/11 3/28/11 4/7/11 4/7/11 4/7/11