NRC Integrated Inspection Report 05000483/2018003 and Independent Spent Fuel Storage Installation Inspection Report 07201045/2018001
ML18295A010
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 10/19/2018
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-B
To: Diya F
Ameren Missouri
Taylor N
References
IR 2018001, IR 2018003
Download: ML18295A010 (31)


Text

ber 19, 2018

SUBJECT:

CALLAWAY PLANT - NRC INTEGRATED INSPECTION REPORT 05000483/2018003 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION REPORT 07201045/2018001

Dear Mr. Diya:

On September 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Callaway Plant. On October 3, 2018, the NRC inspectors discussed the results of this inspection with Mr. T. Herrmann, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

Inspectors documented a licensee-identified violation, which was determined to be of very low safety significance. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the Callaway Plant. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Nicholas H. Taylor, Chief Project Branch B Division of Reactor Projects Docket Nos. 50-483, 72-1045 License No. NPF-30

Enclosures:

Inspection Report 05000483/2018003 and 07201045/2018001 w/Attachments 1: Documents Reviewed 2: Request for Information Quarterly Baseline Inspection

Inspection Report

Docket Numbers: 05000483 and 07201045 License Number: NPF-30 Report Numbers: 05000483/2018003 and 07201045/2018001 Enterprise Identifiers: I-2018-003-006 and I-2018-001-0135 Licensee: Union Electric Company Facility: Callaway Plant and Independent Spent Fuel Storage Installation Location: 8315 County Road 459 Steedman, Missouri 65077 Inspection Dates: July 1, 2018 to September 30, 2018 Inspectors: D. Bradley, Senior Resident Inspector S. Janicki, Resident Inspector S. Alferink, PhD, Reactor Inspector J. Drake, Senior Reactor Inspector L. Brookhart, Senior ISFSI Inspector, FCDB P. Elkmann, Senior Emergency Preparedness Inspector N. Hernandez, Operations Engineer C. Newport, Senior Resident Inspector E. Simpson, CHP, Health Physicist, FCDB C. Stott, Reactor Inspector Approved By: N. Taylor Chief, Project Branch B Division of Reactor Projects Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at the Callaway Plant in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC-identified and self-revealed findings, violations, and additional items are summarized in the tables below. A licensee-identified non-cited violation is documented in the Inspection Results at the end of this report.

List of Findings and Violations None.

Additional Tracking Items Type Issue number Title Inspection Status Procedure URI 05000483/2018003-01 Failure to perform 10 CFR 50.59 71111.17T Open evaluation for compensatory measures associated with stagnant, inactive loop Type Issue number Title Inspection Status Procedure LER 05000483/2018-002-00 Inadequate Emergency Operating 71153 Closed Procedure Guidance for Asymmetric Natural Circulation Cooldown on May 7, 2018

PLANT STATUS

Callaway Plant began the inspection period at full power and remained at this power level through the end of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01Adverse Weather Protection External Flooding

The inspectors evaluated readiness to cope with external flooding on July 16, 2018.

71111.04Equipment Alignment Partial Walkdown

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Remote shutdown panel on July 12, 2018
(2) Component cooling water emergency makeup valves on August 7, 2018
(3) Fire water storage tanks on August 24, 2018
(4) Emergency exhaust system train B on August 25, 2018

Complete Walkdown (1 Sample)

The inspectors evaluated system configurations during a complete walkdown of the component cooling water system train A on September 10, 2018.

71111.05AQFire Protection Annual/Quarterly Quarterly Inspection

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Load center and motor generator room, fire area A-27, on July 20, 2018
(2) Component cooling water train A, fire area A-16N, on September 5, 2018
(3) Component cooling water train B and remote shutdown panel, fire areas A-16S, A-28, and A-33, on September 19, 2018
(4) Spent fuel pool cooling train A, fire area FB-1, on September 20, 2018

Annual Inspection (1 Sample)

The inspectors evaluated fire brigade performance on July 23 and August 20, 2018.

71111.06Flood Protection Measures Cables

The inspectors evaluated cable submergence protection in safety-related manhole MH01B on August 16, 2018.

71111.11Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification

The inspectors observed and evaluated licensed operator continuing training in the simulator on

===July 27, 2018.

Operator Performance (1 Sample)===

The inspectors observed and evaluated control room staff in the following evolutions:

(1) Crew turnover on September 7, 2018
(2) Pressurizer backup heaters capacity test and post maintenance test on September 21, 2018

Operator Exams (1 Sample)

The inspectors reviewed and evaluated requalification examination results on August 22, 2018.

71111.12Maintenance Effectiveness Routine Maintenance Effectiveness

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Emergency diesel generator including temperature switches on July 11, 2018
(2) Component cooling water including gas voiding on September 21, 2018

71111.13Maintenance Risk Assessments and Emergent Work Control

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Elevated risk actions due to emergent work on the solid state protection system input relay K334 on July 9, 2018
(2) Elevated risk actions due to planned residual heat removal train A pump and valve inservice testing on July 20, 2018
(3) Elevated risk actions due to planned containment isolation signal train B relay testing on August 16, 2018
(4) Elevated risk actions due to planned control room filtration train A surveillance testing on August 28, 2018
(5) Elevated risk actions due to planned switchyard breaker replacements on September 14, 2018

71111.15Operability Determinations and Functionality Assessments

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Component cooling water piping penetration degradation on August 15, 2018
(2) Engineered safety features actuation system surveillance results on August 16, 2018
(3) Emergency diesel generator fuel oil filtration on August 24, 2018

71111.17TEvaluations of Changes, Tests and Experiments

The inspectors evaluated the following from August 6-10, 2018:

10 CFR 50.59 Evaluations

(1) CA2512-16-05, modification package 13-0033, hardened condensate storage tank
(2) CA2512 Final Safety Analysis Report change to increase the maximum design bases accident temperature for class 1E equipment rooms
(3) CA2512 16-09 - procedure change (ODP-ZZ-00002) regarding when emergency diesel generator room ventilation supply fans are required
(4) CA2512 17-02 - LDCN 17-0003, volume control tank explosive atmosphere (forced oxidation)10 CFR 50.59 Screening/Applicability Determinations
(1) CA2511-01160, modification package 17-0012, bypass (jumper) A ultimate heat sink fan motor high speed thermal overloads
(2) CA2511/OTN-AP-00003/002, hardened condensate storage tank
(3) CA2511/compensatory measures additions to OTO-ZZ-00012
(4) CA2511/OTN-GK-00001/050, control building heating, ventilation, air conditioning system
(5) CA2511/OTN-GK-00001/051, control building heating ventilation, air conditioning system
(6) CA2511/OTN-NG-00001/017, class 1E 480 heating ventilation, air conditioning electrical system
(7) CA2511-01088, MP 16-0036/201606214-modification of essential service water drains both component cooling water heat exchangers
(8) CA2511-01090, replacement of under frequency relay for reactor coolant pump motor
(9) CA2511/MP18-0045, NK battery replacement
(10) CA2511/OTN-EF-00001/073, essential service water system
(11) CA2511/EOPADD42/002, revise procedure to make the motor-driven auxiliary feedwater pumps available when the hardened condensate storage tank is aligned to auxiliary feedwater suction
(12) CA2511/OTS-PA-00001/022 - operation and testing of alternate power source
(13) CA2511/OTN-EP-00001 ADD3/009 - initial fill and vent of safety injection accumulators
(14) CA2511/17000810 - cycle KJHS0180 to maintain jacket water temp in proper temperature band
(15) CA2511/OTN-EB-00001 ADD1/007 - component cooling water equipment rotation and controlling temperature
(16) CA2511/night order and immediate operability determination compensatory measures for Condition Report 201802284
(17) CA2511/OTN-NG-00001/017, class 1E 480 heating ventilation, air conditioning electrical system
(18) CA2511/EOPADD42/002, make the motor-driven auxiliary feedwater pumps available when the hardened condensate storage tank is aligned to auxiliary feedwater suction

71111.18Plant Modifications

The inspectors evaluated modification package MP 07-0069, replace 480V load center circuit breakers with new Square D breakers.

71111.19Post Maintenance Testing

The inspectors evaluated the following post maintenance tests:

(1) Battery charger NK22 after equipment outage on July 18, 2018
(2) Emergency exhaust system train A after equipment outage on August 8, 2018
(3) SGK04B modification after equipment outage on August 13, 2018
(4) Site 200 series electrical distribution after equipment outage on September 9, 2018
(5) Pressurizer backup heaters after equipment outage on September 21, 2018

71111.22Surveillance Testing The inspectors evaluated the following surveillance tests: Routine

(1) Containment isolation signal slave relay train A test on August 2, 2018
(2) Ultimate heat sink cooling tower fan, trains A and B, test on August 22, 2018

In-service (2 Samples)

(1) Emergency service water pump train A in-service test on July 11, 2018
(2) Emergency diesel generator fuel oil system train B in-service test on July 25, 2018

71114.04Emergency Action Level and Emergency Plan Changes

The inspectors evaluated Procedure EIP-ZZ-00101, Classification of Emergencies, Revision 55 on September 13, 2018. This evaluation does not constitute NRC approval.

OTHER ACTIVITIES - BASELINE

71151Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

(1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (07/01/2017 - 06/30/2018)
(2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (07/01/2017 -

06/30/2018)

(3) IE04: Unplanned Scrams with Complications Sample (07/01/2017 - 06/30/2018)

71152Problem Identification and Resolution Annual Follow-up of Selected Issues

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Essential service water system thermal performance evaluation including inventory losses under Condition Report 201803313 on August 9, 2018
(2) Switchyard breaker trip, MDV52-2, under Condition Report 201803237 on July 28, 2018

71153Follow-up of Events and Notices of Enforcement Discretion Licensee Event Reports

The inspectors evaluated Licensee Event Report 2018-002-00, Inadequate Emergency Operating Procedure Guidance for Asymmetric Natural Circulation Cooldown on May 7, 2018, which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 60855Operation of an Independent Spent Fuel Storage Installation and 60857Review of 10 CFR 72.48 Evaluations The inspectors evaluated the licensees operation of the Independent Spent Fuel Storage Installation (ISFSI) from August 11-17, 2018, on-site at the Callaway Plant and conducted an in-office review of additional documentation, including quality assurance audit reports, condition reports, and documents related to the licensees maintenance of their ISFSI and related equipment.

The Callaway ISFSI is a 10 CFR Part 72 general licensed ISFSI and utilized the Holtec HI-STORM UMAX Storage System, approved under Certificate of Compliance 1040, License Amendment 0, UMAX Final Safety Analysis Report Revision 2, and HI-STORM FW Final Safety Analysis Report Revision 3. This storage system utilizes the multi-purpose canister (MPC-37)that stores 37 pressurized water reactor fuel assemblies in a below grade vertical ventilated module. Callaway had constructed the UMAX ISFSI to hold 48 MPC-37 canisters within the vertical ventilated modules at the site. The top ISFSI pad dimensions are 108.5 feet by 157.5 feet, configured in six rows of eight canisters. During the routine ISFSI inspection, Callaway was in the middle of their second loading campaign. Inspectors were onsite to observe the loading activities associated with canister number 4 out of 12 planned for the dry fuel storage campaign. By the end of the loading campaign, the licensee was expected to have a total of 18 canisters stored in the UMAX ISFSI.

The ISFSI activities specifically reviewed during the on-site inspection and the subsequent in-office review included:

(1) Evaluated and observed fuel selection and fuel loading operations associated with the 4th canister of the campaign (the 10th cask placed at the ISFSI)
(2) Evaluated and observed welding of the canister, non-destructive testing of the welds, pressure testing, forced helium drying, helium backfill, and heavy load movements from the spent fuel pool to the sites vertical cask transporter and into the vertical ventilated module
(3) Reviewed the licensee's loading, processing, and heavy load procedures associated with their current dry fuel storage campaign
(4) Reviewed the licensees corrective action program implementation for ISFSI operations since the last routine ISFSI inspection which was completed in January 2017
(5) Reviewed quality assurance program implementation, including recent quality assurance audits, surveillances, and quality control activities
(6) Reviewed documentation for compliance with Technical Specifications related to operational surveillance activities and Final Safety Analysis Report required annual maintenance activities
(7) Reviewed the licensees radiological monitoring data for the calendar years 2016 and 2017 to verify compliance with 10 CFR 72.104 requirements
(8) Reviewed spent fuel documentation for the canisters loaded since the last routine ISFSI inspection to verify the fuel met all technical specification requirements for storage (canisters 7-10)
(9) Reviewed annual maintenance activities for heavy lifting components which included special lifting devices and the sites cask handling crane
(10) Reviewed all 10 CFR72.48 safety evaluations/screenings performed by the licensee for changes made to the ISFSI program since the last routine ISFSI inspection in accordance with NRC Inspection Procedure 60857
(11) Reviewed all changes made to the licensees 10 CFR 72.212 report under the licensees 10 CFR 72.48 program (Reviewed changes from Revision 2 and Revision 3)

INSPECTION RESULTS

Licensee-Identified Non-Cited Violation 71153Follow-up of Events and Notices of Enforcement Discretion This violation of very low safety significance was identified by the licensee and has been entered into the licensees corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Violation: Technical Specification 5.4.1.a requires, in part, that written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2. Section 6 of Appendix A to Regulatory Guide 1.33, Revision 2, requires procedures for combating emergencies and other significant events. The licensee established Emergency Operating Procedure (EOP) ES-0.2, Natural Circulation Cooldown, Revision 9, in part, to meet the regulatory requirement. Figure 1 of ES-0.2 allowed cooldown rates that exceeded the values used in the license basis for radiological consequence analyses and exceeded the values used in the design of the nitrogen accumulators for atmospheric steam dumps and turbine-driven auxiliary feedwater system actuations. This issue was discussed in Licensee Event Report 2018-002-00, Inadequate EOP Guidance for Asymmetric Natural Circulation Cooldown.

Contrary to the above, from April 29, 2008 through May 7, 2018, the licensee failed to maintain procedures for combating emergencies and other significant events. Specifically, the licensee failed to maintain EOPs for natural circulation cooldown. This performance deficiency resulted in atmospheric steam dumps and turbine-driven auxiliary feedwater systems being rendered inoperable due to depletion of the safety-related actuation nitrogen.

Significance/Severity Level: This performance deficiency was more than minor, and therefore a finding, because it adversely affected the procedure quality attribute of the Mitigating Systems Cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. As a result, the licensee would not have been able to reach shutdown cooling conditions and the plant would have been placed in a condition of being unable to control decay heat removal via atmospheric steam dumps.

Using Inspection Manual Chapter 0609, Attachment 4, Initial Characterization of Findings, and Appendix A, The Significance Determination Process (SDP) for Findings At-Power, Exhibit 2, Mitigating Systems Screening Questions, dated June 19, 2012, the inspectors determined that the finding required a detailed risk evaluation since the finding represented an actual loss of function of at least a single train for greater than its technical specification allowed outage time. Specifically, as reported in Licensee Event Report 2018-002-00, Inadequate EOP Guidance for Asymmetric Natural Circulation Cooldown, atmospheric steam dumps and the turbine-driven auxiliary feedwater system were rendered inoperable, due to the inadequate EOP revision, in April 2008. As a result, this exceeded the allowed outage time for the associated Technical Specifications 3.7.4 and 3.7.5, respectively.

The senior reactor analyst reviewed the issue and determined that the issue was of very low safety significance, or Green. The senior reactor analyst noted that the impact of the performance deficiency on plant safety was limited to a steam line break leading to a consequential loss of offsite power. The frequency of all such events was estimated to be approximately 3.5 x 10-5/year, using values available in the plant-specific SPAR model.

According to the licensee, the design basis time that the nitrogen backup accumulators would provide motive force to the atmospheric steam dumps and the turbine-driven auxiliary feedwater flow control valves was 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> with a maximum realistic time available of approximately 16.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. Therefore, the analyst used an average probability of nonrecovery of offsite power over a 12-hour period (6.2 x 10-2). Additionally, the licensee has two air compressors supplied by the vital diesel generators that would eliminate the demand for the nitrogen accumulators. Therefore, the analyst applied a generic value for the failure of a multi-train system (3.0 x 10-3). Using these assumptions, the analyst calculated the frequency of a steam line break with unrecovered loss of offsite power and a failure of the remaining two air compressors. This bounded the value of the incremental conditional core damage frequency to less than 6.5 x 10-9/year.

Corrective Action Reference: Condition Report 201802284.

Unresolved Item Failure to perform 10 CFR 50.59 evaluation for 71111.17T (Open) compensatory measures associated with stagnant, Evaluations of inactive loop.05000483/2018003-01 Changes, Tests and Experiments

Description:

The inspectors identified an unresolved item related to implementation of 10 CFR 50.59, Evaluations Changes, Tests and Experiments, for the licensees failure to perform an adequate evaluation for compensatory measures for a stagnant, inactive loop.

The licensee enacted compensatory measures to support atmospheric dump valve/turbine-driven AFW pump operability due to an issue identified for natural circulation cooldown with a faulted steam generator (i.e., inactive loop). A reduction in the Technical Specification 3.4.16 dose equivalent iodine (DEI) limit (from 1Ci/gm to 0.4Ci/gm) was imposed without a 10 CFR 50.59 evaluation and/or license amendment. Specifically, the licensee did not consider the compensatory measure of reducing Technical Specification 3.4.16 limits on DEI-131 as a change to technical specifications.

The licensee considered this a temporary action that did not meet the intent of 10 CFR 50.90 for a technical specification change.

Planned Closure Action: There is currently an NEI paper under review by the NRC Headquarters Technical Specification Branch and a draft Regulatory Guide that addresses the issue of non-conservative technical specifications and timely submittal of license amendment requests associated with them. This issue will be resolved based on the results of the Technical Specifications Branchs final decision on the subject.

Licensee Action: The licensee has entered the issue into their corrective action program.

Corrective Action Reference: Condition Report

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On August 10, 2018, the inspectors presented the Evaluations of Changes, Tests and Experiments inspection results to Mr. T. Herrmann, Site Vice President, and other members of the licensee staff.

On August 16, 2018, the inspectors presented the routine ISFSI inspection results to Mr. B. Cox, Senior Director Nuclear Operations, and other members of the licensee staff.

On August 22, 2018, the inspectors presented the annual requalification inspection results to Mr. M. Otten, Operations Training Manager, and other members of the licensee staff.

On September 26, 2018, the emergency preparedness inspector presented the results of the review of changes to the licensees emergency plan to Mr. G. Rausch, Manager, Emergency Preparedness, and other members of the licensee staff.

On October 3, 2018, the inspectors presented the quarterly resident inspector inspection results to Mr. T. Herrmann, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Procedure 71111.01: Adverse Weather Protection

Condition Reports

201001813 201706008 201702791

Procedures

Number Title Revision

ODP-ZZ-00017, Appendix 2 Technical Specification Related Annunciators 4

OOA-EF-00001 Ultimate Heat Sink Setpoint Levels 13

OTA-RK-00020 Annunciator Response Procedure MCB Panel 4

RK020

OTN-EF-00001 Essential Service Water System 77

Miscellaneous Documents

Number Title Revision

U-29-03-F Ultimate Heat Sink Retention Pond - PMF 0

Determination

RFR 22267A Approve replacement for EFLIS0027/27A

Inspection Procedure 71111.04: Equipment Alignment

Condition Reports

200701435 200901558 201701338 201706207

201801283 201801316 201803443 201804144

201804154 201804197 201804204 201804251

Procedures

Number Title Revision

APA-ZZ-00356 Pump and Valve Inservice Test Program 24

EDP-ZZ-01114 Motor Operated Valve Program Guide 36

EDP-ZZ-04107 HVAC Pressure Boundary Control 31

OSP-EG-0001A CCW Train A Valve Alignment Surveillance 7

OSP-GG-0005B B Train Fuel Building Negative Pressure Test 8

OTN-KC-00001, Addendum 19 Filling and Draining Fire Water Storage 7

Tanks

Drawings

Number Title Revision

E-23EF02B Schematic Diagram ESW to SW System Isolation Valve 4

Miscellaneous

Documents

Number Title Revision

Fire Preplan Manual Various

EF-15 Add 7 Essential Service Water System Fault Tree Model 0

RFR 22556 Clarify Note 3 on E-23Al09 for Foxboro Contact A

RFR 23186B Evaluate Using MOV-Long-Life Grease on all MOVs

ULNRC-GG-001 Fuel Building Ventilation System 2

Inspection Procedure 71111.05AQ: Fire Protection Annual/Quarterly

Condition Reports

201801575 201802736 201803613

Procedures

Number Title Revision

APA-ZZ-00750 Hazard Barrier Program 41

EDP-ZZ-04107 HVAC Pressure Boundary Control 31

FPP-ZZ-00009 Fire Protection Training Program 34

MTT-ZZ-00252 Installation of Flexible Fire Seals 5

Miscellaneous Documents

Number Title Revision

Fire Preplan Manual Various

T66-1000 S Drill Planning and Authorization Various

Inspection Procedure 71111.06: Flood Protection

Condition Reports

201309387 201403831 201605812 201704709

201804053

Drawings

Number Title Revision

C-U203 ESWS Units 1 & 2 Electrical Manholes Plans, Sections & 8

Detail

Miscellaneous Documents

Number Title

MP 09-0049 Evaluate method of preventing water intrusion into manhole MH01

Inspection Procedure 71111.11: Licensed Operator Requalification Program and

Licensed Operator Performance

Condition Reports

200700956 200702502 200903732 201406048

201804776 201804779

Procedures

Number Title Revision

APA-ZZ-00395 Significant Operator Response Timing 29

MPE-ZZ-QY054 Inspection and Test of Protective Lockout Relays, General 5

Electric Type HEA

ODP-ZZ-00001 Operations Department - Code of Conduct 104

ODP-ZZ-00003 Shift Relief and Turnover 37

Miscellaneous Documents

Title Date

Annual Requalification Results Summary July 6, 2018

Operations Night Orders

Inspection Procedure 71111.12: Maintenance Effectiveness

Condition Reports

201104544 201104651 201206896 201403496

201608165 201801489 201802184

Work Orders

397333

Procedures

Number Title Revision

APA-ZZ-00296 Gas Intrusion Program 3

APA-ZZ-00500, Appendix 11 Degraded and Nonconforming Condition 9

Resolution

EDP-ZZ-01128 Maintenance Rule Program 25

EDP-ZZ-01128, Appendix 2 Summary of SSC Performance Criteria 32

EDP-ZZ-01128, Appendix 4 Maintenance Rule System Functions 18

Drawnings

Number Title

M-22EG03 Piping and Instrument Diagram - Component Cooling Water

Miscellaneous Documents

Number Title

EG-54 Allowable Gas Void Volume for Each Train of the Component Cooling

Water Suction Piping

EG-55 Water Hammer due to Voids in Component Cooling Water System Piping

MP 10-0042 Install New CCW/Radwaste Flow Restriction Device

Inspection Procedure 71111.13: Maintenance Risk Assessments and Emergent Work

Control

Condition Reports

200706552 201011290 201705555 201706032

201707194 201804887

Work Orders

18000637 18002661 18507861

Procedures

Number Title Revision

APA-ZZ-00322 Integrated Work Management Process Description 20

APA-ZZ-00322, Online Work Integrated Risk Management 17

Appendix F

APA-ZZ-00356 Pump and Valve Insrvice Test Program 24

OSP-EJ-V001A Train A RHR Valve Inservice Test 20

OSP-EJ-P001A RHR Train A Inservice Test 64

OSP-GK-0001A A Train Control Room Filtration and Pressurization 17

System Monthly Operability Verification

OSP-SA-0009B Train B CISA Slave Relay Test 19

Drawings

Number Title Revision

8618-X-94080 One Line Diagram Metering and Relaying 345KV 20

Differential and 345KV Bus-A and B Pot. Devices

Miscellaneous Documents

Number Title

RFR 019023A Determine Retest Requirements for MDV41V511

Inspection Procedure 71111.15: Operability Determinations and Functionality

Assessments

Condition Reports

199400711 199701249 199901106 201010145

201801641 201804251 201804276

Work Orders

10002666

Procedures

Number Title Revision

OTS-JE-00002 Filtration of Emergency D/G Fuel Oil 11

Inspection Procedure 71111.17T: Evaluations of Changes, Tests and Experiments

Condition Reports

201403041 201601534 201603312 201608686

201700966 201702032 201703841 201704156

201707651 201802284 201803910 201803973

201804069

Calculations

Number Title Revision

81402-C-010 Design of Safety Related Pipe Supports for HCST Piping 2

81402-S-005 Pipe Stress and Support Load Evaluation of HCST Supply 1

Line to Safety-Related Auxiliary Feedwater System

Suction

GK-19, Addendum 3 2016 Auxiliary Building Battery and SWBD room GOTHIC 0

temperature analysis

GM-03 EDG Room Temperatures w/o HVAC 3

GM-03, Addendum 1 EDG Room Temperature Analysis With Both Air Supply 3

Fans Unavailable

GM-03, Addendum 2 Inputs 3

GM-320 Diesel/Generators Building HVAC 0

GM-320, Diesel Generator Building HVAC Update 0

Addendum 2

M-FL-04, Impact of MP 13-0033 - Hardened Condensate Storage 2

Addendum 6 Tank Refuel 21 Tie-Ins

NAI-1719-001 Callaway Control Building Loss of Class 1E A/C GOTHIC 1

Room Heat Up Analysis

NAI-1719-001, Control Building Temperature Analysis for Operability 1

Addendum 1 Evaluation

NAI-1719-002 Callaway Control Building with Control Room Loss of 0

Class 1 E A/C GOTHIC Room Heat Up Analysis

NAI-1719-004 Callaway Control Building with Control Room Loss of 0

Class 1 E A/C GOTHIC Room Heat Up With Installed

Fans and Louvers

NG-12, NG MCC Setpoint Calculation 3

Addendum 27

NG-22, Addendum 6 NG Load Center Setpoint Calculation 1

Procedures

Number Title Revision

APA-ZZ-00108 Primary Licensing Documents: Change/Revision Process 24

APA-ZZ-00143 10 CFR 50.59 and 10 CFR 72.48 Reviews 17

APA-ZZ-00600 Design Change Control 60

EDP-ZZ-04600 Engineering Change Control 1

ES-1.1 SI Termination 16

ES-1.1 SI Termination 17

ES-0.2 Natural Circulation Cooldown 15

ES-0.2 Natural Circulation Cooldown 14

ES-0.2 Natural Circulation Cooldown 13

ES-0.2 Natural Circulation Cooldown 0

FDP-ZZ-00103 License Document Change Process 19

IP-ENG-001 Standard Design Process 0

OTN-EF-0001 Essential Service Water System 72

OTN-EF-0001 Essential Service Water System 73

OTN-EF-0001 Essential Service Water System 76

ODP-ZZ-00002 Equipment Status Control 86

ODP-ZZ-00002 Equipment Status Control 85

ODP-ZZ-00002 Equipment Status Control 86

OTN-EB-00001, Closed Cooling Water System - Equipment Rotation and

Addendum 1 Controlling Temperature

OTN-EP-00001, SI Accumulator Level Control

6, 7

Addendum 1

OTN-EP-00001, Initial Fill and Vent of SI Accumulators

8, 9

Addendum 3

OTN-GK-00001 Control Building HVAC System 53

Operation and Testing of the Alternate Emergency Power

OTS-PA-00001 22

Source

Drawings

Number Title Revision

8600-X-90422 Storeroom 2 Power Plan Receptacles 7

8600-X-90424 Storeroom 2 Lighting Plan 3

EA04-H006-332 Pipe Supports, Service Water System 1

Communication Corridor

EA04-H007-332 Pipe Supports, Service Water System 1

Communication Corridor

EA04-H011-332 Pipe Supports, Service Water System 1

Communication Corridor

E-009-00081 Metal-Clad Switchgear - Title Sheet Electrical 9

Diagram

E-009-00190 Metal-Clad Switchgear - Indoor 7

E-009-00250 IM 13.8 KV Class 1E Potential Transformer 9

Component

E-009-00252 Metal-Clad Switchgear - Interconnection 7

Diagram

E-009-00262 Metal-Clad Switchgear - Equipment Summary 1

E-009-00339 AZZ Qualification Report for Frequency Relay 1

ABB P/N 422C1276

E-018-00172 SZ 5 2SP-1WD Schematic 16

E-018-00223 Wiring Diagram 2SP-1WD (SIZE 5) 13

E-21NK01 Class 1E 125V DC System - Meter & Relay 17

Diagram

E-21NK02 Class 1E 125V DC System - Meter & Relay 17

Diagram

E-050-00006 Batteries - 60 Cell NCN-23 Layout ON-2-S07- 13

074530-816 Racks

E-050-00009 Layout For 60 Cell NCN-13 Battery ON-2-507- 12

074520-816 Racks 10'-0" LG

E-050-00032 Batteries - NCX-NAX Typical Termination 0

Assemblies

E-U1NG01 Low Voltage System - Class IE 480V Single 15

Line Meter And Relay Diagram

E-U3EF02A Schematic Diagram - Ultimate Heat Sink 22

Cooling Tower Fans

GB01-H001-332 Pipe Supports, Central Chilled Water System 2

Pumps Suction & Discharge

GB02-H003-332 Pipe Supports, Central Chilled Water System 1

Pumps Suction & Discharge

M-22AL01(Q) Piping and Instrumentation Diagram Auxiliary 50

Feedwater System

M-22EA01 Piping And Instrumentation Diagram Service 23

Water System FSAR Figure 9.2 -1 Sheet 1

M-22EG02 Piping & Instrumentation Diagram Component 22

Cooling Water System FSAR Figure 9.2-3

Sheet 2

M-22EG22 Small Piping Isometric Component Cooling 7

Water System Auxiliary Building Location 141

M-22GB01 Piping And Instrumentation Diagram Central 18

Chilled Water System FSAR Figure 9.4-10

M-23EA04 Piping Isometric - Service Water System 9

Comm. Corridor (Central Chillers)

M-23EG23 Small Piping Isometric Component Cooling 4

Water System Auxiliary Building Location 142

M-29EG22 Hanger Location Dwg Small Pipe Component 1

Cooling Water System Auxiliary Building

Location 141

M-29EG23 Hanger Location Dwg. Small Pipes Component 1

Cooling Water System Auxiliary Building

Location 142

Miscellaneous Documents

Number Title Revision or

Date

2005 ASHRAE Handbook Fundamentals

Callaway FSAR, Various Chapters

AABD 6.0 Callaway Energy Center Accident Analysis Basis 6A

Document Feedwater System Pipe Break

ANSI/IEEE C37.9-1979 Test Procedure for AC High-Voltage Circuit

Breakers Rated on a Symmetrical Current Basis

EDN-01 Engineering Design Notice, MP 13-0002

EDN-02 Engineering Design Notice, MP 13-0002

IB 7.4.1.7-5 ABB Circuit Shield Type 81 Series 422, Vendor

Manual

IEEE Std 323-1974 IEEE Standard for Qualifying Class 1E Equipment

for Nuclear Power Generating Stations

IEEE Std 450-1995 IEEE Recommended Practice for Maintenance,

Testing, and Replacement of Vented Lead-Acid

Batteries for Stationary Applications

LTR-LIS-18-182 Attachment 1, Review of Mitigating Strategy for 0

Stagnant/Voided Loop as the Result of Asymmetric

Natural Circulation

NUREG-0830, Safety Evaluation Report Related To The Operation

Supplement No. 3 Of Callaway Plant, Unit 1

RFR 15642 Formal Safety Evaluation A, B

RFR 201104353 Class 1E Electrical Equipment Survivability

RFR 201403041 Class 1E Electrical Equipment Survivability

September 4,

STARS-ENG-5001-8.1 Replace EDG Fans CGM01A & B

2012

Hardened Condensate Storage Tank Refuel 21 February 23,

STARS-ENG-5001-8.1

Tie-Ins 2015

Inspection Procedure 71111.18: Plant Modifications

Condition Reports

201502453 201701626 201704103 201800905

201800917 201801692 201802679

Work Orders

11005902 11005918 15502053 17502428

Procedures

Number Title Revision

EDP-ZZ-04600 Engineering Change Control 1

Miscellaneous Documents

Number Title Revision

or Date

CA2883 Technical Task Job Brief Checklist June 8, 2016

LD-351023928-1 Masterpact Breaker 1

MP 07-0069 Replace 480V Load Center Circuit Breakers 4

NG-12 NG MCC Setpoint Calculation 3

SVP-133 Standard Verification Plan 1

TB-12-007 Masterpact Breakers Fail to Close 1

Inspection Procedure 71111.19: Post Maintenance Testing

Condition Reports

200408234 201801437 201803246 201803541

Work Orders

2501352 12002857 12003896 12508243

15000794 15511559 17501719 17502428

Procedures

Number Title Revision

APA-ZZ-00322 App E Post-Maintenance Test Program 12

MPE-NK-QB004 NK Class 1E Battery Charger Inspection 11

OSP-BB-00002 PZR Heater Capacity Test 9

OSP-SA-0009B Train A CISA Slave Relay Test 19

OTN-BB-00005 Pressurizer and Pressure Control 15

OTN-NK-00001 Add 2 125VDC Bus NK03 and Distribution System 3

OTN-PG-00001 480 VAC Non-Class 1E Electrical System 30

OTO-ZZ-00012 Severe Weather 39

Drawings

Number Title Revision

E-23BB25 Pressurizer Heater Backup Group B Heater 1

Grouping

Miscellaneous Documents

Number Title

ULNRC Revise Ventilation System Surveillance Requirements to Operate for

Hours per Month

Inspection Procedure 71111.22: Surveillance Testing

Condition Reports

200600435 201001813 201206883 201804199

Work Orders

18003285 18504656

Procedures

Number Title Revision

APA-ZZ-00340 Surveillance Program Administration 44

ISL-EF-00T67 Loop-TMP: ESW A Cool Twr Inlet and Pump 7

Discharge Temperatures

OSP-EF-P001A ESW Train A Inservice Test 80

OSP-JE-P001B Train B Emergency Diesel Generator Fuel Oil 33

System In-service Tests

Miscellaneous Documents

Number Title Revision

AL-20 Evaluation of Tolerances for Fixed Parameters used in 0

IST Pump Surveillances

ULDBD-EF-001 Essential Service Water System 2

Inspection Procedure 71151: Performance Indicator Verification

Condition Reports

201501431

Miscellaneous Documents

Title Revision

NRC Performance Indicator Transmittal Report Various

Inspection Procedure 71152: Problem Identification and Resolution

Condition Reports

201705467 201705575 201800563 201800905

201801274 201801348 201801489 201801502

201801684 201801925 201802184 201802547

201803237 201803245 201803286 201803706

201803313 201803781 201803852 201804116

201804149 201804251 201804807

Work Orders

18002574

Miscellaneous Documents

Number Title Revision

RFR 180142 Add Splice inside MH 59-50 and remove splice inside pull 1

box between MH 59-50 and MH 59-51 to Cable CA-3618

Inspection Procedure 71153: Follow-up of Events and Notices of Enforcement Discretion

Condition Reports

201803580

Procedures

Number Title Revision

APA-ZZ-00102 EOP/OTO Writers Manual 13

E-3 Steam Generator Tube Rupture 23

ES-0.2 Natural Circulation Cooldown 15

ODP-ZZ-00025 EOP/OTO Users Guide 33

Inspection Procedure 60855: Operation of an Independent Spent Fuel Storage

Installation and Inspection Procedure 60857: Review of 10 CFR 72.48 Evaluations

Condition Reports

201605802 201700196 201700328 201700621

201700649 201700652 201702372 201702969

201703274 201703295 201704069 201704732

201800292 201800328 201800713 201800920

201801469 201801531 201802109 201803118

201803195 201803220 201803274 201803310

20180402 201803404 201803406 201803430

201803434 201803457 201803464 201803465

201803559

Work Orders

15506408-500 15506409-500 15506643-500

Procedures

Number Title Revision

MC-GTAW Machine Gas Tungsten Arc Welding 16

APA-ZZ-00143 10 CFR 50.59 and 10 CFR 72.48 Reviews 17

APA-ZZ-00500 Corrective Action Program 69

APA-ZZ-01600 Dry Fuel Storage Program 0

ETP-ZZ-04020 Fuel Selection and Cask Loading for Dry Cask 4

Storage

ETP-ZZ-04021 ISFSI Loading Campaign Performance 4

ETP-ZZ-04022 Pre-Operation Inspection 1

ETP-ZZ-04023 MPC Loading 3

ETP-ZZ-04024 MPC Sealing, Drying, and Backfill Operations 3

ETP-ZZ-04025 MPC Transfer 2

ETP-ZZ-04026 MPC Unloading 1

ETP-ZZ-04027 Responding to Abnormal Conditions 2

FDP-ZZ-00105 10 CFR 72.212 Report Maintenance 0

GQP-9.2 Liquid Penetrant Exam 10

GQP-9.6 Visual Examination of Welds 18

MSLT-MPC Helium Leak Test Cal-1

MPM-KE-QH001 Cask Handling Crane Inspection 8

OSP-ZZ-00001 Control Room Shift and Daily Log Readings 90

and Channel Checks

PI-CNSTR-OP Closure Welding MPC 2

Design Basis Documents

Number Title Revision

CoC 1040 Certificate of Compliance 1040 Holtec 0

HI-STORM UMAX Storage System

FSAR 1040 FSAR for Holtec HI-STORM UMAX Storage 2

System

FSAR 1032 FSAR for Holtec HI-STORM FW Storage 3

System

2.212 Callaway 10 CFR 72.212 Report 3

2.48 Applicability Determinations and 72.48 Screens

CA2510 CA3163 ECO-102-24 ECO-105-17

ECO-105-21 ECO-5018-75 ECO-5021-27 ECO-5021-29

ECO-5021-31 MP13-0009 MP 17-0007 1154R0

29R0 1242R0 1285R0

Miscellaneous

Documents

Number Title Revision or Date

180000747Close Specific Radiation Work Permit 2

180000747Trans Specific Radiation Work Permit 0

180000747Trans Specific Radiation Work Permit 0

18001046 Calibration Test Report July 25, 2018

18001047 Calibration Test Report August 1, 2018

ALARA Plan 2018 -ISFSI Project ALARA Package 2

CA-M-20180430-2 Survey of ISFSI Pad Quarterly Q217 April 30, 2018

DOC-104-209-105 MPC FW Lift Cleat Assembly Leased March 27, 2018

ETP-ZZ-0420 Fuel Characteristics for Canister #7-10 4

HSP-355 Periodic Inspection and Recertification of SLD 7

RWP-18DFS General Radiation Work Permit 0

TLD Data 2016 and 2017 ISFSI Fence TLD Data 0

Initial Request for Information

Quarterly Baseline Inspection

Callaway Plant

Inspection Report: 05000483/2018003

Inspection Dates: July 1 - September 30, 2018

Inspection Procedure: IP 71111 series, IP 71151, IP 71152

Lead Inspector: Dan Bradley, Senior Resident Inspector

Information Requested For 3rd Quarter 2018

The following information should be sent to the resident office in electronic format (Certrec IMS

preferred) to the attention of Dan Bradley by July 26, 2018. Please provide requested

documentation electronically in pdf files, Excel, or other searchable formats, if possible. The

information should contain descriptive names and be indexed or hyperlinked to facilitate ease of

use. If requested documents are large and/or only hard copy formats are available, please

inform the inspector for clarification.

Please provide the following information for the Component Cooling Water (EG) system:

1. A list of all calculations and drawings associated with the selected system.

2. A list of condition reports associated with the selected system for the last 3 years.

3. A list of work orders associated with the selected system for the last 3 years, including

all open work orders.

4. A list of any pre-existing evaluations or calculations with low design margins for the

selected system.

5. A copy of the last 3 heat exchanger inspections including performance data for the

selected system.

6. A list of maintenance rule components and functions; based on engineering or expert

panel judgment, for the selected system.

7. A list of maintenance rule functional failure evaluations for the last 3 years for the

selected system.

8. A list of operating experience evaluations for the last 3 years for the selected system.

9. A list of all procedures and calculations that involve time-critical operator actions.

10. A list of permanent and temporary modifications performed in the past 3 years for the

selected system. Include a list of any documents associated with modifications such as:

calculations, specifications, vendor manuals, Final Safety Analysis Report, Technical

Specifications and Bases updates, updated procedures, and maintenance and

surveillance activities and procedures.

11. A list of root cause and apparent cause evaluations associated with component failures

or design issues initiated/completed in the last 3 years for the selected system.

2. A list of any common-cause failures of components in the last 3 years for the selected

system.

13. An electronic copy of the design bases documents for the selected system.

14. An electronic copy of the system health notebooks for the selected system.

Additionally, please provide the basis documents used to compute or establish the following

NRC Performance Indicators (PIs) for the most recent 4 quarters which data is available:

a) IE-01: Unplanned Scrams per 7000 Critical Hours

b) IE-03: Unplanned Power Changes per 7000 Critical Hours

c) IE-04: Unplanned Scrams with Complications

Inspector Contact Information:

Dan Bradley

Senior Resident Inspector

573-676-3181

Dan.Bradley@nrc.gov

Mailing Address:

U.S. NRC Resident Inspector Office

201 NRC Road

Steedman, MO 65077

ML18295A010

SUNSI Review Non-Sensitive Publicly Available Keyword:

By: NHT/RDR Sensitive Non-Publicly Available NRC-002

OFFICE SRI/DRP/B RI/DRP/B C:DRS/EB1 C:DRS/EB2 C:DRS/OP C:DRS/PSB2

NAME DBradley SJanicki TFarnholtz GWerner VGaddy HGepford

SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/

DATE 10/19/18 10/16/18 10/09/2018 10/11/2018 10/9/18 10/15/18

OFFICE TL:DRS/IPAT DNMS:FCDB C:DRP/B

NAME GGeorge JKatanic NTaylor

SIGNATURE /RA - /RA/ /RA/

HFreeman for/

DATE 10/09/2018 10/15/2018 10/19/2018