October 19, 2018
SUBJECT:
CALLAWAY PLANT - NRC INTEGRATED INSPECTION REPORT 05000483/2018003 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION REPORT 07201045/2018001
Dear Mr. Diya:
On September 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Callaway Plant. On October 3, 2018, the NRC inspectors discussed the results of this inspection with Mr. T. Herrmann, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
Inspectors documented a licensee-identified violation, which was determined to be of very low safety significance. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the Callaway Plant. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Nicholas H. Taylor, Chief Project Branch B Division of Reactor Projects
Docket Nos. 50-483, 72-1045 License No. NPF-30
Enclosures:
Inspection Report 05000483/2018003 and 07201045/2018001
w/Attachments
1: Documents Reviewed
2: Request for Information Quarterly
Baseline Inspection
Inspection Report
Docket Numbers:
05000483 and 07201045
License Number:
Report Numbers:
05000483/2018003 and 07201045/2018001
Enterprise Identifiers: I-2018-003-006 and I-2018-001-0135
Licensee:
Union Electric Company
Facility:
Callaway Plant and Independent Spent Fuel Storage Installation
Location:
8315 County Road 459
Steedman, Missouri 65077
Inspection Dates:
July 1, 2018 to September 30, 2018
Inspectors:
D. Bradley, Senior Resident Inspector
S. Janicki, Resident Inspector
S. Alferink, PhD, Reactor Inspector
J. Drake, Senior Reactor Inspector
L. Brookhart, Senior ISFSI Inspector, FCDB
P. Elkmann, Senior Emergency Preparedness Inspector
N. Hernandez, Operations Engineer
C. Newport, Senior Resident Inspector
E. Simpson, CHP, Health Physicist, FCDB
C. Stott, Reactor Inspector
Approved By:
N. Taylor
Chief, Project Branch B
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at the Callaway Plant in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC-identified and self-revealed findings, violations, and additional items are summarized in the tables below. A licensee-identified non-cited violation is documented in the Inspection Results at the end of this report.
List of Findings and Violations
None.
Additional Tracking Items
Type Issue number Title Inspection Procedure Status URI 05000483/2018003-01 Failure to perform 10 CFR 50.59 evaluation for compensatory measures associated with stagnant, inactive loop 71111.17T Open
Type Issue number Title Inspection Procedure Status LER 05000483/2018-002-00 Inadequate Emergency Operating Procedure Guidance for Asymmetric Natural Circulation Cooldown on May 7, 2018 71153 Closed
PLANT STATUS
Callaway Plant began the inspection period at full power and remained at this power level through the end of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01Adverse Weather Protection External Flooding
The inspectors evaluated readiness to cope with external flooding on July 16, 2018.
71111.04Equipment Alignment Partial Walkdown
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Remote shutdown panel on July 12, 2018
- (2) Component cooling water emergency makeup valves on August 7, 2018
- (3) Fire water storage tanks on August 24, 2018
- (4) Emergency exhaust system train B on August 25, 2018
Complete Walkdown (1 Sample)
The inspectors evaluated system configurations during a complete walkdown of the component cooling water system train A on September 10, 2018.
71111.05AQFire Protection Annual/Quarterly Quarterly Inspection
The inspectors evaluated fire protection program implementation in the following selected areas:
- (1) Load center and motor generator room, fire area A-27, on July 20, 2018
- (2) Component cooling water train A, fire area A-16N, on September 5, 2018
- (3) Component cooling water train B and remote shutdown panel, fire areas A-16S, A-28, and A-33, on September 19, 2018
- (4) Spent fuel pool cooling train A, fire area FB-1, on September 20, 2018
Annual Inspection (1 Sample)
The inspectors evaluated fire brigade performance on July 23 and August 20, 2018.
71111.06Flood Protection Measures Cables
The inspectors evaluated cable submergence protection in safety-related manhole MH01B on August 16, 2018.
71111.11Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification
The inspectors observed and evaluated licensed operator continuing training in the simulator on July 27, 2018.
Operator Performance (1 Sample)
The inspectors observed and evaluated control room staff in the following evolutions:
- (1) Crew turnover on September 7, 2018
- (2) Pressurizer backup heaters capacity test and post maintenance test on September 21, 2018
Operator Exams (1 Sample)
The inspectors reviewed and evaluated requalification examination results on August 22, 2018.
71111.12Maintenance Effectiveness Routine Maintenance Effectiveness
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
- (1) Emergency diesel generator including temperature switches on July 11, 2018
- (2) Component cooling water including gas voiding on September 21, 2018
71111.13Maintenance Risk Assessments and Emergent Work Control
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
- (1) Elevated risk actions due to emergent work on the solid state protection system input relay K334 on July 9, 2018
- (2) Elevated risk actions due to planned residual heat removal train A pump and valve inservice testing on July 20, 2018
- (3) Elevated risk actions due to planned containment isolation signal train B relay testing on August 16, 2018
- (4) Elevated risk actions due to planned control room filtration train A surveillance testing on August 28, 2018
- (5) Elevated risk actions due to planned switchyard breaker replacements on September 14, 2018
71111.15Operability Determinations and Functionality Assessments
The inspectors evaluated the following operability determinations and functionality assessments:
- (1) Component cooling water piping penetration degradation on August 15, 2018
- (2) Engineered safety features actuation system surveillance results on August 16, 2018
- (3) Emergency diesel generator fuel oil filtration on August 24, 2018
71111.17TEvaluations of Changes, Tests and Experiments
The inspectors evaluated the following from August 6-10, 2018:
10 CFR 50.59 Evaluations
- (1) CA2512-16-05, modification package 13-0033, hardened condensate storage tank
- (2) CA2512 Final Safety Analysis Report change to increase the maximum design bases accident temperature for class 1E equipment rooms
- (3) CA2512 16-09 - procedure change (ODP-ZZ-00002) regarding when emergency diesel generator room ventilation supply fans are required
- (4) CA2512 17-02 - LDCN 17-0003, volume control tank explosive atmosphere (forced oxidation)
10 CFR 50.59 Screening/Applicability Determinations
- (1) CA2511-01160, modification package 17-0012, bypass (jumper) A ultimate heat sink fan motor high speed thermal overloads
- (2) CA2511/OTN-AP-00003/002, hardened condensate storage tank
- (3) CA2511/compensatory measures additions to OTO-ZZ-00012
- (4) CA2511/OTN-GK-00001/050, control building heating, ventilation, air conditioning system
- (5) CA2511/OTN-GK-00001/051, control building heating ventilation, air conditioning system
- (6) CA2511/OTN-NG-00001/017, class 1E 480 heating ventilation, air conditioning electrical system
- (7) CA2511-01088, MP 16-0036/201606214-modification of essential service water drains both component cooling water heat exchangers
- (8) CA2511-01090, replacement of under frequency relay for reactor coolant pump motor
- (9) CA2511/MP18-0045, NK battery replacement
- (10) CA2511/OTN-EF-00001/073, essential service water system
- (11) CA2511/EOPADD42/002, revise procedure to make the motor-driven auxiliary feedwater pumps available when the hardened condensate storage tank is aligned to auxiliary feedwater suction
- (12) CA2511/OTS-PA-00001/022 - operation and testing of alternate power source
- (13) CA2511/OTN-EP-00001 ADD3/009 - initial fill and vent of safety injection accumulators
- (14) CA2511/17000810 - cycle KJHS0180 to maintain jacket water temp in proper temperature band
- (15) CA2511/OTN-EB-00001 ADD1/007 - component cooling water equipment rotation and controlling temperature
- (16) CA2511/night order and immediate operability determination compensatory measures for Condition Report 201802284
- (17) CA2511/OTN-NG-00001/017, class 1E 480 heating ventilation, air conditioning electrical system
- (18) CA2511/EOPADD42/002, make the motor-driven auxiliary feedwater pumps available when the hardened condensate storage tank is aligned to auxiliary feedwater suction
71111.18Plant Modifications
The inspectors evaluated modification package MP 07-0069, replace 480V load center circuit breakers with new Square D breakers.
71111.19Post Maintenance Testing
The inspectors evaluated the following post maintenance tests:
- (1) Battery charger NK22 after equipment outage on July 18, 2018
- (2) Emergency exhaust system train A after equipment outage on August 8, 2018
- (3) SGK04B modification after equipment outage on August 13, 2018
- (4) Site 200 series electrical distribution after equipment outage on September 9, 2018
- (5) Pressurizer backup heaters after equipment outage on September 21, 2018
===71111.22Surveillance Testing The inspectors evaluated the following surveillance tests:
Routine===
- (1) Containment isolation signal slave relay train A test on August 2, 2018
- (2) Ultimate heat sink cooling tower fan, trains A and B, test on August 22, 2018
In-service (2 Samples)
- (1) Emergency service water pump train A in-service test on July 11, 2018
- (2) Emergency diesel generator fuel oil system train B in-service test on July 25, 2018
71114.04Emergency Action Level and Emergency Plan Changes
The inspectors evaluated Procedure EIP-ZZ-00101, Classification of Emergencies, Revision 55 on September 13, 2018. This evaluation does not constitute NRC approval.
OTHER ACTIVITIES - BASELINE
71151Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
- (1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (07/01/2017 - 06/30/2018)
- (2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (07/01/2017 - 06/30/2018)
- (3) IE04: Unplanned Scrams with Complications Sample (07/01/2017 - 06/30/2018)
71152Problem Identification and Resolution Annual Follow-up of Selected Issues
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Essential service water system thermal performance evaluation including inventory losses under Condition Report 201803313 on August 9, 2018
- (2) Switchyard breaker trip, MDV52-2, under Condition Report 201803237 on July 28, 2018
71153Follow-up of Events and Notices of Enforcement Discretion Licensee Event Reports
The inspectors evaluated Licensee Event Report 2018-002-00, Inadequate Emergency Operating Procedure Guidance for Asymmetric Natural Circulation Cooldown on May 7, 2018, which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx.
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 60855Operation of an Independent Spent Fuel Storage Installation and 60857Review of 10 CFR 72.48 Evaluations The inspectors evaluated the licensees operation of the Independent Spent Fuel Storage Installation (ISFSI) from August 11-17, 2018, on-site at the Callaway Plant and conducted an in-office review of additional documentation, including quality assurance audit reports, condition reports, and documents related to the licensees maintenance of their ISFSI and related equipment.
The Callaway ISFSI is a 10 CFR Part 72 general licensed ISFSI and utilized the Holtec HI-STORM UMAX Storage System, approved under Certificate of Compliance 1040, License Amendment 0, UMAX Final Safety Analysis Report Revision 2, and HI-STORM FW Final Safety Analysis Report Revision 3. This storage system utilizes the multi-purpose canister (MPC-37)that stores 37 pressurized water reactor fuel assemblies in a below grade vertical ventilated module. Callaway had constructed the UMAX ISFSI to hold 48 MPC-37 canisters within the vertical ventilated modules at the site. The top ISFSI pad dimensions are 108.5 feet by 157.5 feet, configured in six rows of eight canisters. During the routine ISFSI inspection, Callaway was in the middle of their second loading campaign. Inspectors were onsite to observe the loading activities associated with canister number 4 out of 12 planned for the dry fuel storage campaign. By the end of the loading campaign, the licensee was expected to have a total of 18 canisters stored in the UMAX ISFSI.
The ISFSI activities specifically reviewed during the on-site inspection and the subsequent in-office review included:
- (1) Evaluated and observed fuel selection and fuel loading operations associated with the 4th canister of the campaign (the 10th cask placed at the ISFSI)
- (2) Evaluated and observed welding of the canister, non-destructive testing of the welds, pressure testing, forced helium drying, helium backfill, and heavy load movements from the spent fuel pool to the sites vertical cask transporter and into the vertical ventilated module
- (3) Reviewed the licensee's loading, processing, and heavy load procedures associated with their current dry fuel storage campaign
- (4) Reviewed the licensees corrective action program implementation for ISFSI operations since the last routine ISFSI inspection which was completed in January 2017
- (5) Reviewed quality assurance program implementation, including recent quality assurance audits, surveillances, and quality control activities
- (6) Reviewed documentation for compliance with Technical Specifications related to operational surveillance activities and Final Safety Analysis Report required annual maintenance activities
- (7) Reviewed the licensees radiological monitoring data for the calendar years 2016 and 2017 to verify compliance with 10 CFR 72.104 requirements
- (8) Reviewed spent fuel documentation for the canisters loaded since the last routine ISFSI inspection to verify the fuel met all technical specification requirements for storage (canisters 7-10)
- (9) Reviewed annual maintenance activities for heavy lifting components which included special lifting devices and the sites cask handling crane
- (10) Reviewed all 10 CFR72.48 safety evaluations/screenings performed by the licensee for changes made to the ISFSI program since the last routine ISFSI inspection in accordance with NRC Inspection Procedure 60857
- (11) Reviewed all changes made to the licensees 10 CFR 72.212 report under the licensees 10 CFR 72.48 program (Reviewed changes from Revision 2 and Revision 3)
INSPECTION RESULTS
Licensee-Identified Non-Cited Violation 71153Follow-up of Events and Notices of Enforcement Discretion This violation of very low safety significance was identified by the licensee and has been entered into the licensees corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.
Violation: Technical Specification 5.4.1.a requires, in part, that written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2. Section 6 of Appendix A to Regulatory Guide 1.33, Revision 2, requires procedures for combating emergencies and other significant events. The licensee established Emergency Operating Procedure (EOP) ES-0.2, Natural Circulation Cooldown, Revision 9, in part, to meet the regulatory requirement. Figure 1 of ES-0.2 allowed cooldown rates that exceeded the values used in the license basis for radiological consequence analyses and exceeded the values used in the design of the nitrogen accumulators for atmospheric steam dumps and turbine-driven auxiliary feedwater system actuations. This issue was discussed in Licensee Event Report 2018-002-00, Inadequate EOP Guidance for Asymmetric Natural Circulation Cooldown.
Contrary to the above, from April 29, 2008 through May 7, 2018, the licensee failed to maintain procedures for combating emergencies and other significant events. Specifically, the licensee failed to maintain EOPs for natural circulation cooldown. This performance deficiency resulted in atmospheric steam dumps and turbine-driven auxiliary feedwater systems being rendered inoperable due to depletion of the safety-related actuation nitrogen.
Significance/Severity Level: This performance deficiency was more than minor, and therefore a finding, because it adversely affected the procedure quality attribute of the Mitigating Systems Cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. As a result, the licensee would not have been able to reach shutdown cooling conditions and the plant would have been placed in a condition of being unable to control decay heat removal via atmospheric steam dumps.
Using Inspection Manual Chapter 0609, Attachment 4, Initial Characterization of Findings, and Appendix A, The Significance Determination Process (SDP) for Findings At-Power, Exhibit 2, Mitigating Systems Screening Questions, dated June 19, 2012, the inspectors determined that the finding required a detailed risk evaluation since the finding represented an actual loss of function of at least a single train for greater than its technical specification allowed outage time. Specifically, as reported in Licensee Event Report 2018-002-00, Inadequate EOP Guidance for Asymmetric Natural Circulation Cooldown, atmospheric steam dumps and the turbine-driven auxiliary feedwater system were rendered inoperable, due to the inadequate EOP revision, in April 2008. As a result, this exceeded the allowed outage time for the associated Technical Specifications 3.7.4 and 3.7.5, respectively.
The senior reactor analyst reviewed the issue and determined that the issue was of very low safety significance, or Green. The senior reactor analyst noted that the impact of the performance deficiency on plant safety was limited to a steam line break leading to a consequential loss of offsite power. The frequency of all such events was estimated to be approximately 3.5 x 10-5/year, using values available in the plant-specific SPAR model.
According to the licensee, the design basis time that the nitrogen backup accumulators would provide motive force to the atmospheric steam dumps and the turbine-driven auxiliary feedwater flow control valves was 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> with a maximum realistic time available of approximately 16.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. Therefore, the analyst used an average probability of nonrecovery of offsite power over a 12-hour period (6.2 x 10-2). Additionally, the licensee has two air compressors supplied by the vital diesel generators that would eliminate the demand for the nitrogen accumulators. Therefore, the analyst applied a generic value for the failure of a multi-train system (3.0 x 10-3). Using these assumptions, the analyst calculated the frequency of a steam line break with unrecovered loss of offsite power and a failure of the remaining two air compressors. This bounded the value of the incremental conditional core damage frequency to less than 6.5 x 10-9/year.
Corrective Action Reference: Condition Report 201802284.
Unresolved Item (Open)
Failure to perform 10 CFR 50.59 evaluation for compensatory measures associated with stagnant, inactive loop.05000483/2018003-01 71111.17T Evaluations of Changes, Tests and Experiments
Description:
The inspectors identified an unresolved item related to implementation of 10 CFR 50.59, Evaluations Changes, Tests and Experiments, for the licensees failure to perform an adequate evaluation for compensatory measures for a stagnant, inactive loop.
The licensee enacted compensatory measures to support atmospheric dump valve/turbine-driven AFW pump operability due to an issue identified for natural circulation cooldown with a faulted steam generator (i.e., inactive loop). A reduction in the Technical Specification 3.4.16 dose equivalent iodine (DEI) limit (from 1Ci/gm to 0.4Ci/gm) was imposed without a 10 CFR 50.59 evaluation and/or license amendment. Specifically, the licensee did not consider the compensatory measure of reducing Technical Specification 3.4.16 limits on DEI-131 as a change to technical specifications.
The licensee considered this a temporary action that did not meet the intent of 10 CFR 50.90 for a technical specification change.
Planned Closure Action: There is currently an NEI paper under review by the NRC Headquarters Technical Specification Branch and a draft Regulatory Guide that addresses the issue of non-conservative technical specifications and timely submittal of license amendment requests associated with them. This issue will be resolved based on the results of the Technical Specifications Branchs final decision on the subject.
Licensee Action: The licensee has entered the issue into their corrective action program.
Corrective Action Reference: Condition Report
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On August 10, 2018, the inspectors presented the Evaluations of Changes, Tests and Experiments inspection results to Mr. T. Herrmann, Site Vice President, and other members of the licensee staff.
On August 16, 2018, the inspectors presented the routine ISFSI inspection results to Mr. B. Cox, Senior Director Nuclear Operations, and other members of the licensee staff.
On August 22, 2018, the inspectors presented the annual requalification inspection results to Mr. M. Otten, Operations Training Manager, and other members of the licensee staff.
On September 26, 2018, the emergency preparedness inspector presented the results of the review of changes to the licensees emergency plan to Mr. G. Rausch, Manager, Emergency Preparedness, and other members of the licensee staff.
On October 3, 2018, the inspectors presented the quarterly resident inspector inspection results to Mr. T. Herrmann, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Procedure 71111.01: Adverse Weather Protection
Condition Reports
201001813
201706008
201702791
Procedures
Number
Title
Revision
ODP-ZZ-00017, Appendix 2
Technical Specification Related Annunciators
OOA-EF-00001
Ultimate Heat Sink Setpoint Levels
OTA-RK-00020
Annunciator Response Procedure MCB Panel
RK020
OTN-EF-00001
Essential Service Water System
Miscellaneous Documents
Number
Title
Revision
U-29-03-F
Ultimate Heat Sink Retention Pond - PMF
Determination
RFR 22267A
Approve replacement for EFLIS0027/27A
Inspection Procedure 71111.04: Equipment Alignment
Condition Reports
200701435
200901558
201701338
201706207
201801283
201801316
201803443
201804144
201804154
201804197
201804204
201804251
Procedures
Number
Title
Revision
APA-ZZ-00356
Pump and Valve Inservice Test Program
EDP-ZZ-01114
Motor Operated Valve Program Guide
EDP-ZZ-04107
HVAC Pressure Boundary Control
CCW Train A Valve Alignment Surveillance
B Train Fuel Building Negative Pressure Test 8
OTN-KC-00001, Addendum 19 Filling and Draining Fire Water Storage
Tanks
Drawings
Number
Title
Revision
E-23EF02B
Schematic Diagram ESW to SW System Isolation Valve
Miscellaneous
Documents
Number
Title
Revision
Fire Preplan Manual
Various
EF-15 Add 7
Essential Service Water System Fault Tree Model
RFR 22556
Clarify Note 3 on E-23Al09 for Foxboro Contact
A
RFR 23186B
Evaluate Using MOV-Long-Life Grease on all MOVs
ULNRC-GG-001
Fuel Building Ventilation System
Inspection Procedure 71111.05AQ: Fire Protection Annual/Quarterly
Condition Reports
201801575
201802736
201803613
Procedures
Number
Title
Revision
APA-ZZ-00750
Hazard Barrier Program
EDP-ZZ-04107
HVAC Pressure Boundary Control
Fire Protection Training Program
MTT-ZZ-00252
Installation of Flexible Fire Seals
Miscellaneous Documents
Number
Title
Revision
Fire Preplan Manual
Various
T66-1000 S
Drill Planning and Authorization
Various
Inspection Procedure 71111.06: Flood Protection
Condition Reports
201309387
201403831
201605812
201704709
201804053
Drawings
Number
Title
Revision
C-U203
ESWS Units 1 & 2 Electrical Manholes Plans, Sections &
Detail
Miscellaneous Documents
Number
Title
MP 09-0049
Evaluate method of preventing water intrusion into manhole MH01
Inspection Procedure 71111.11: Licensed Operator Requalification Program and
Licensed Operator Performance
Condition Reports
200700956
200702502
200903732
201406048
201804776
201804779
Procedures
Number
Title
Revision
APA-ZZ-00395
Significant Operator Response Timing
MPE-ZZ-QY054
Inspection and Test of Protective Lockout Relays, General
Electric Type HEA
ODP-ZZ-00001
Operations Department - Code of Conduct
104
ODP-ZZ-00003
Shift Relief and Turnover
Miscellaneous Documents
Title
Date
Annual Requalification Results Summary
July 6, 2018
Operations Night Orders
Inspection Procedure 71111.12: Maintenance Effectiveness
Condition Reports
201104544
201104651
201206896
201403496
201608165
201801489
201802184
Work Orders
397333
Procedures
Number
Title
Revision
APA-ZZ-00296
Gas Intrusion Program
APA-ZZ-00500, Appendix 11 Degraded and Nonconforming Condition
Resolution
EDP-ZZ-01128
EDP-ZZ-01128, Appendix 2
Summary of SSC Performance Criteria
EDP-ZZ-01128, Appendix 4
Maintenance Rule System Functions
Drawnings
Number
Title
M-22EG03
Piping and Instrument Diagram - Component Cooling Water
Miscellaneous Documents
Number
Title
EG-54
Allowable Gas Void Volume for Each Train of the Component Cooling
Water Suction Piping
EG-55
Water Hammer due to Voids in Component Cooling Water System Piping
MP 10-0042
Install New CCW/Radwaste Flow Restriction Device
Inspection Procedure 71111.13: Maintenance Risk Assessments and Emergent Work
Control
Condition Reports
200706552
201011290
201705555
201706032
201707194
201804887
Work Orders
18000637
18002661
18507861
Procedures
Number
Title
Revision
APA-ZZ-00322
Integrated Work Management Process Description
APA-ZZ-00322,
Appendix F
Online Work Integrated Risk Management
APA-ZZ-00356
Pump and Valve Insrvice Test Program
Train A RHR Valve Inservice Test
RHR Train A Inservice Test
A Train Control Room Filtration and Pressurization
System Monthly Operability Verification
Train B CISA Slave Relay Test
Drawings
Number
Title
Revision
8618-X-94080
One Line Diagram Metering and Relaying 345KV
Differential and 345KV Bus-A and B Pot. Devices
Miscellaneous Documents
Number
Title
RFR 019023A
Determine Retest Requirements for MDV41V511
Inspection Procedure 71111.15: Operability Determinations and Functionality
Assessments
Condition Reports
199400711
199701249
199901106
201010145
201801641
201804251
201804276
Work Orders
10002666
Procedures
Number
Title
Revision
OTS-JE-00002
Filtration of Emergency D/G Fuel Oil
Inspection Procedure 71111.17T: Evaluations of Changes, Tests and Experiments
Condition Reports
201403041
201601534
201603312
201608686
201700966
201702032
201703841
201704156
201707651
201802284
201803910
201803973
201804069
Calculations
Number
Title
Revision
81402-C-010
Design of Safety Related Pipe Supports for HCST Piping
81402-S-005
Pipe Stress and Support Load Evaluation of HCST Supply
Line to Safety-Related Auxiliary Feedwater System
Suction
GK-19, Addendum 3
2016 Auxiliary Building Battery and SWBD room GOTHIC
temperature analysis
GM-03
EDG Room Temperatures w/o HVAC
GM-03, Addendum 1 EDG Room Temperature Analysis With Both Air Supply
Fans Unavailable
GM-03, Addendum 2 Inputs
GM-320
Diesel/Generators Building HVAC
GM-320,
Addendum 2
Diesel Generator Building HVAC Update
M-FL-04,
Addendum 6
Impact of MP 13-0033 - Hardened Condensate Storage
Tank Refuel 21 Tie-Ins
NAI-1719-001
Callaway Control Building Loss of Class 1E A/C GOTHIC
Room Heat Up Analysis
NAI-1719-001,
Addendum 1
Control Building Temperature Analysis for Operability
Evaluation
NAI-1719-002
Callaway Control Building with Control Room Loss of
Class 1 E A/C GOTHIC Room Heat Up Analysis
NAI-1719-004
Callaway Control Building with Control Room Loss of
Class 1 E A/C GOTHIC Room Heat Up With Installed
Fans and Louvers
NG-12,
Addendum 27
NG MCC Setpoint Calculation
NG-22, Addendum 6 NG Load Center Setpoint Calculation
Procedures
Number
Title
Revision
APA-ZZ-00108
Primary Licensing Documents: Change/Revision Process
APA-ZZ-00143
CFR 50.59 and 10 CFR 72.48 Reviews
APA-ZZ-00600
Design Change Control
EDP-ZZ-04600
Engineering Change Control
SI Termination
SI Termination
Natural Circulation Cooldown
Natural Circulation Cooldown
Natural Circulation Cooldown
Natural Circulation Cooldown
FDP-ZZ-00103
License Document Change Process
IP-ENG-001
Standard Design Process
OTN-EF-0001
Essential Service Water System
OTN-EF-0001
Essential Service Water System
OTN-EF-0001
Essential Service Water System
ODP-ZZ-00002
Equipment Status Control
ODP-ZZ-00002
Equipment Status Control
ODP-ZZ-00002
Equipment Status Control
OTN-EB-00001,
Addendum 1
Closed Cooling Water System - Equipment Rotation and
Controlling Temperature
OTN-EP-00001,
Addendum 1
SI Accumulator Level Control
6, 7
OTN-EP-00001,
Addendum 3
Initial Fill and Vent of SI Accumulators
8, 9
OTN-GK-00001
Control Building HVAC System
OTS-PA-00001
Operation and Testing of the Alternate Emergency Power
Source
Drawings
Number
Title
Revision
8600-X-90422
Storeroom 2 Power Plan Receptacles
8600-X-90424
Storeroom 2 Lighting Plan
EA04-H006-332
Pipe Supports, Service Water System
Communication Corridor
EA04-H007-332
Pipe Supports, Service Water System
Communication Corridor
EA04-H011-332
Pipe Supports, Service Water System
Communication Corridor
E-009-00081
Metal-Clad Switchgear - Title Sheet Electrical
Diagram
E-009-00190
Metal-Clad Switchgear - Indoor
E-009-00250
IM 13.8 KV Class 1E Potential Transformer
Component
E-009-00252
Metal-Clad Switchgear - Interconnection
Diagram
E-009-00262
Metal-Clad Switchgear - Equipment Summary
E-009-00339
AZZ Qualification Report for Frequency Relay
ABB P/N 422C1276
E-018-00172
SZ 5 2SP-1WD Schematic
E-018-00223
Wiring Diagram 2SP-1WD (SIZE 5)
E-21NK01
Class 1E 125V DC System - Meter & Relay
Diagram
E-21NK02
Class 1E 125V DC System - Meter & Relay
Diagram
E-050-00006
Batteries - 60 Cell NCN-23 Layout ON-2-S07-
074530-816 Racks
E-050-00009
Layout For 60 Cell NCN-13 Battery ON-2-507-
074520-816 Racks 10'-0" LG
E-050-00032
Batteries - NCX-NAX Typical Termination
Assemblies
E-U1NG01
Low Voltage System - Class IE 480V Single
Line Meter And Relay Diagram
E-U3EF02A
Schematic Diagram - Ultimate Heat Sink
Cooling Tower Fans
GB01-H001-332
Pipe Supports, Central Chilled Water System
Pumps Suction & Discharge
GB02-H003-332
Pipe Supports, Central Chilled Water System
Pumps Suction & Discharge
M-22AL01(Q)
Piping and Instrumentation Diagram Auxiliary
Feedwater System
M-22EA01
Piping And Instrumentation Diagram Service
Water System FSAR Figure 9.2 -1 Sheet 1
M-22EG02
Piping & Instrumentation Diagram Component
Cooling Water System FSAR Figure 9.2-3
Sheet 2
M-22EG22
Small Piping Isometric Component Cooling
Water System Auxiliary Building Location 141
M-22GB01
Piping And Instrumentation Diagram Central
Chilled Water System FSAR Figure 9.4-10
M-23EA04
Piping Isometric - Service Water System
Comm. Corridor (Central Chillers)
M-23EG23
Small Piping Isometric Component Cooling
Water System Auxiliary Building Location 142
M-29EG22
Hanger Location Dwg Small Pipe Component
Cooling Water System Auxiliary Building
Location 141
M-29EG23
Hanger Location Dwg. Small Pipes Component
Cooling Water System Auxiliary Building
Location 142
Miscellaneous Documents
Number
Title
Revision or
Date
2005 ASHRAE Handbook Fundamentals
Callaway FSAR, Various Chapters
AABD 6.0
Callaway Energy Center Accident Analysis Basis
Document Feedwater System Pipe Break
6A
Test Procedure for AC High-Voltage Circuit
Breakers Rated on a Symmetrical Current Basis
EDN-01
Engineering Design Notice, MP 13-0002
EDN-02
Engineering Design Notice, MP 13-0002
IB 7.4.1.7-5
ABB Circuit Shield Type 81 Series 422, Vendor
Manual
IEEE Standard for Qualifying Class 1E Equipment
for Nuclear Power Generating Stations
IEEE Recommended Practice for Maintenance,
Testing, and Replacement of Vented Lead-Acid
Batteries for Stationary Applications
LTR-LIS-18-182
1, Review of Mitigating Strategy for
Stagnant/Voided Loop as the Result of Asymmetric
Natural Circulation
Supplement No. 3
Safety Evaluation Report Related To The Operation
Of Callaway Plant, Unit 1
RFR 15642
Formal Safety Evaluation
A, B
RFR 201104353
Class 1E Electrical Equipment Survivability
RFR 201403041
Class 1E Electrical Equipment Survivability
STARS-ENG-5001-8.1
Replace EDG Fans CGM01A & B
September 4,
2012
STARS-ENG-5001-8.1
Hardened Condensate Storage Tank Refuel 21
Tie-Ins
February 23,
2015
Inspection Procedure 71111.18: Plant Modifications
Condition Reports
201502453
201701626
201704103
201800905
201800917
201801692
201802679
Work Orders
11005902
11005918
15502053
17502428
Procedures
Number
Title
Revision
EDP-ZZ-04600
Engineering Change Control
Miscellaneous Documents
Number
Title
Revision
or Date
CA2883
Technical Task Job Brief Checklist
June 8, 2016
LD-351023928-1
Masterpact Breaker
MP 07-0069
Replace 480V Load Center Circuit Breakers
NG-12
NG MCC Setpoint Calculation
SVP-133
Standard Verification Plan
TB-12-007
Masterpact Breakers Fail to Close
Inspection Procedure 71111.19: Post Maintenance Testing
Condition Reports
200408234
201801437
201803246
201803541
Work Orders
2501352
2002857
2003896
2508243
15000794
15511559
17501719
17502428
Procedures
Number
Title
Revision
APA-ZZ-00322 App E
Post-Maintenance Test Program
MPE-NK-QB004
NK Class 1E Battery Charger Inspection
PZR Heater Capacity Test
Train A CISA Slave Relay Test
OTN-BB-00005
Pressurizer and Pressure Control
OTN-NK-00001 Add 2
25VDC Bus NK03 and Distribution System
OTN-PG-00001
480 VAC Non-Class 1E Electrical System
OTO-ZZ-00012
Severe Weather
Drawings
Number
Title
Revision
E-23BB25
Pressurizer Heater Backup Group B Heater
Grouping
Miscellaneous Documents
Number
Title
ULNRC
Revise Ventilation System Surveillance Requirements to Operate for
Hours per Month
Inspection Procedure 71111.22: Surveillance Testing
Condition Reports
200600435
201001813
201206883
201804199
Work Orders
18003285
18504656
Procedures
Number
Title
Revision
APA-ZZ-00340
Surveillance Program Administration
ISL-EF-00T67
Loop-TMP: ESW A Cool Twr Inlet and Pump
Discharge Temperatures
ESW Train A Inservice Test
Train B Emergency Diesel Generator Fuel Oil
System In-service Tests
Miscellaneous Documents
Number
Title
Revision
AL-20
Evaluation of Tolerances for Fixed Parameters used in
IST Pump Surveillances
ULDBD-EF-001
Essential Service Water System
Inspection Procedure 71151: Performance Indicator Verification
Condition Reports
201501431
Miscellaneous Documents
Title
Revision
NRC Performance Indicator Transmittal Report
Various
Inspection Procedure 71152: Problem Identification and Resolution
Condition Reports
201705467
201705575
201800563
201800905
201801274
201801348
201801489
201801502
201801684
201801925
201802184
201802547
201803237
201803245
201803286
201803706
201803313
201803781
201803852
201804116
201804149
201804251
201804807
Work Orders
18002574
Miscellaneous Documents
Number
Title
Revision
RFR 180142
Add Splice inside MH 59-50 and remove splice inside pull
box between MH 59-50 and MH 59-51 to Cable CA-3618
Inspection Procedure 71153: Follow-up of Events and Notices of Enforcement Discretion
Condition Reports
201803580
Procedures
Number
Title
Revision
APA-ZZ-00102
EOP/OTO Writers Manual
E-3
Steam Generator Tube Rupture
Natural Circulation Cooldown
ODP-ZZ-00025
EOP/OTO Users Guide
Inspection Procedure 60855: Operation of an Independent Spent Fuel Storage
Installation and Inspection Procedure 60857: Review of 10 CFR 72.48 Evaluations
Condition Reports
201605802
201700196
201700328
201700621
201700649
201700652
201702372
201702969
201703274
201703295
201704069
201704732
201800292
201800328
201800713
201800920
201801469
201801531
201802109
201803118
201803195
201803220
201803274
201803310
20180402
201803404
201803406
201803430
201803434
201803457
201803464
201803465
201803559
Work Orders
15506408-500
15506409-500
15506643-500
Procedures
Number
Title
Revision
MC-GTAW
Machine Gas Tungsten Arc Welding
APA-ZZ-00143
CFR 50.59 and 10 CFR 72.48 Reviews
APA-ZZ-00500
Corrective Action Program
APA-ZZ-01600
Dry Fuel Storage Program
ETP-ZZ-04020
Fuel Selection and Cask Loading for Dry Cask
Storage
ETP-ZZ-04021
ISFSI Loading Campaign Performance
ETP-ZZ-04022
Pre-Operation Inspection
ETP-ZZ-04023
MPC Loading
ETP-ZZ-04024
MPC Sealing, Drying, and Backfill Operations
ETP-ZZ-04025
MPC Transfer
ETP-ZZ-04026
MPC Unloading
ETP-ZZ-04027
Responding to Abnormal Conditions
FDP-ZZ-00105
CFR 72.212 Report Maintenance
GQP-9.2
Liquid Penetrant Exam
GQP-9.6
Visual Examination of Welds
MSLT-MPC
Helium Leak Test
Cal-1
MPM-KE-QH001
Cask Handling Crane Inspection
Control Room Shift and Daily Log Readings
and Channel Checks
PI-CNSTR-OP
Closure Welding MPC
Design Basis Documents
Number
Title
Revision
CoC 1040
Certificate of Compliance 1040 Holtec
HI-STORM UMAX Storage System
FSAR 1040
FSAR for Holtec HI-STORM UMAX Storage
System
FSAR 1032
FSAR for Holtec HI-STORM FW Storage
System
2.212
Callaway 10 CFR 72.212 Report
2.48 Applicability Determinations and 72.48 Screens
CA2510
CA3163
ECO-102-24
ECO-105-17
ECO-105-21
ECO-5018-75
ECO-5021-27
ECO-5021-29
ECO-5021-31
MP13-0009
MP 17-0007
1154R0
29R0
242R0
285R0
Miscellaneous
Documents
Number
Title
Revision or Date
180000747Close
Specific Radiation Work Permit
180000747Trans
Specific Radiation Work Permit
180000747Trans
Specific Radiation Work Permit
18001046
Calibration Test Report
July 25, 2018
18001047
Calibration Test Report
August 1, 2018
ALARA Plan
2018 -ISFSI Project ALARA Package
CA-M-20180430-2
Survey of ISFSI Pad Quarterly Q217
April 30, 2018
DOC-104-209-105
MPC FW Lift Cleat Assembly Leased
March 27, 2018
ETP-ZZ-0420
Fuel Characteristics for Canister #7-10
HSP-355
Periodic Inspection and Recertification of SLD
RWP-18DFS
General Radiation Work Permit
TLD Data
2016 and 2017 ISFSI Fence TLD Data
Initial Request for Information
Quarterly Baseline Inspection
Callaway Plant
Inspection Report: 05000483/2018003
Inspection Dates: July 1 - September 30, 2018
Inspection Procedure: IP 71111 series, IP 71151, IP 71152
Lead Inspector: Dan Bradley, Senior Resident Inspector
Information Requested For 3rd Quarter 2018
The following information should be sent to the resident office in electronic format (Certrec IMS
preferred) to the attention of Dan Bradley by July 26, 2018. Please provide requested
documentation electronically in pdf files, Excel, or other searchable formats, if possible. The
information should contain descriptive names and be indexed or hyperlinked to facilitate ease of
use. If requested documents are large and/or only hard copy formats are available, please
inform the inspector for clarification.
Please provide the following information for the Component Cooling Water (EG) system:
1.
A list of all calculations and drawings associated with the selected system.
2.
A list of condition reports associated with the selected system for the last 3 years.
3.
A list of work orders associated with the selected system for the last 3 years, including
all open work orders.
4.
A list of any pre-existing evaluations or calculations with low design margins for the
selected system.
5.
A copy of the last 3 heat exchanger inspections including performance data for the
selected system.
6.
A list of maintenance rule components and functions; based on engineering or expert
panel judgment, for the selected system.
7.
A list of maintenance rule functional failure evaluations for the last 3 years for the
selected system.
8.
A list of operating experience evaluations for the last 3 years for the selected system.
9.
A list of all procedures and calculations that involve time-critical operator actions.
10. A list of permanent and temporary modifications performed in the past 3 years for the
selected system. Include a list of any documents associated with modifications such as:
calculations, specifications, vendor manuals, Final Safety Analysis Report, Technical
Specifications and Bases updates, updated procedures, and maintenance and
surveillance activities and procedures.
11. A list of root cause and apparent cause evaluations associated with component failures
or design issues initiated/completed in the last 3 years for the selected system.
2. A list of any common-cause failures of components in the last 3 years for the selected
system.
13. An electronic copy of the design bases documents for the selected system.
14. An electronic copy of the system health notebooks for the selected system.
Additionally, please provide the basis documents used to compute or establish the following
NRC Performance Indicators (PIs) for the most recent 4 quarters which data is available:
a) IE-01: Unplanned Scrams per 7000 Critical Hours
b) IE-03: Unplanned Power Changes per 7000 Critical Hours
c) IE-04: Unplanned Scrams with Complications
Inspector Contact Information:
Senior Resident Inspector
573-676-3181
Dan.Bradley@nrc.gov
Mailing Address:
U.S. NRC Resident Inspector Office
201 NRC Road
Steedman, MO 65077
SUNSI Review
By: NHT/RDR
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available
Keyword:
OFFICE
SRI/DRP/B
RI/DRP/B
C:DRS/EB1
C:DRS/EB2
C:DRS/OP
C:DRS/PSB2
NAME
DBradley
SJanicki
TFarnholtz
GWerner
VGaddy
HGepford
SIGNATURE
/RA/
/RA/
/RA/
/RA/
/RA/
/RA/
DATE
10/19/18
10/16/18
10/09/2018
10/11/2018
10/9/18
10/15/18
OFFICE
TL:DRS/IPAT
DNMS:FCDB
C:DRP/B
NAME
GGeorge
JKatanic
NTaylor
SIGNATURE
/RA -
HFreeman for/
/RA/
/RA/
DATE
10/09/2018
10/15/2018