U.S. NUCLEAR REGULATORY COMMISSION
-
OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-483/79-11 Docket No. 50-483 License No. CPPR-139 Licensee:
Union Electric Company Post Office. Box 149 St. Louis, MO 63166 Facility:
Callaway, Unit 1 Inspection At:
Callaway Site, Callaway County, Missouri Inspection Conducted: October 16-18, 1979
/2, s/
it I fn e' I *
y
.
/ J.
Inspector:
W. A. Hansen
///7 //. '/
ef b
/* !7
Approved By:
R. C. K C
,
Projects Section
.
Inspection Summary Inspection on October 16-18, 1979 (Report No. 50-483/79-11)
Areas Inspected: Activities related to concrete placement; and site tcur. The inspection involved sixteen (16) hours on site by one hTC inspector.
Results: No items of noncompliance or deviations were noted.
2166 156 7 912210
.
DETAILS Persons Contacted Union Electric Company (UE)
- W. H. Weber, Manager, Nuclear Construction
- M. E. Doyne, General Superintendent, Callaway Construction
- R. L. Powers, Site Quality Assuranse Group Leader
- F. D. Field, Manager, Quality Assurance
- W. S. Strothman, Supervising Engineer - QA
- J. C. Gearhardt, Quality Assurance Engineer
- R. Veatch, Quality Assurance Engineer
- J. E. Davis, Operational QA Supervisor Daniel International Corporation (Daniel)
- E. D. McFarland, Construction Engineering Manager
- J. A. Holland, Project Quality Assurance Manager
- J. R. Cook, Quality Control Manager The inspector also contacted and interviewed other licensee and contractor personnel, including craftsmen, QA/QC, technical and engineering staff members.
'
- Denotes those attending exit meetings.
1.
Site Tours An extensive site tour was performed in order to determine the general status of work performed in areas of: concrete placement; reactor coolant system welding and electrical cable tray installation.
2.
Observation of Concrete Placement Concrete placement UC5 10B04 was being made on October 16, 1979.
The last 50% of the placement was observed. It was observed that:
There was adequate crew for the placement.
a.
b.
The use of vibrating equipment was performed correctly.
Placement technique including the pumping system and the drop c.
chutes were satisfactory.
On October 17, 1979, the post placement curing was observed. Wet burlap was placed on all exposed surfaces.
2166, 157-2-
,
No items of noncompliance or deviations were identified on this area
,
of the inspections.
Exit Meeting The inspector met with licensee representatives (denoted in the Persons Contacted paragraph) at the conclusion of the inspection on October 18, 1979. The inspector suntaarized the scope and findings of the inspection.
2166 158
.
-3-