IR 05000482/2025005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2025005)
ML25226A267
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/15/2025
From: Ami Agrawal
NRC/RGN-IV/DORS/PBB
To: Reasoner C
Wolf Creek
References
IR 2025005
Download: ML25226A267 (1)


Text

August 15, 2025

SUBJECT:

UPDATED INSPECTION PLAN FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2025005)

Dear Cleve Reasoner:

The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for Wolf Creek Generating Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ML25042A278), the NRC determined that a broad, comprehensive review of the Reactor Oversight Process (ROP) is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.

This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding. Please contact me at (817) 200-1141 with any questions you have regarding this letter.

Sincerely, Ami N. Agrawal, Chief Reactor Projects Branch B Division of Operating Reactor Safety Docket Nos. 05000482; 07200079 License No. NPF-42 Enclosure:

Inspection Plan cc w/ encl: Distribution via LISTSERV Signed by Agrawal, Ami on 08/15/25

ML25226A267

SUNSI Review By: ANA

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available OFFICE BC:DORS/PBB NAME AAgrawal SIGNATURE

/RA/

DATE 08/15/25

Site Inspection Activity Plan 07200079 - Wolf Creek (ISFSI)

07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count Wolf Creek ISFSI Triennial and ISFSI loading inspection during campaign (one week, TBD)

8/1/2026 8/31/2026 IP 60855 001001 Operation Of An ISFSI Prepared on 8/13/2025 1:37:57 PM 1 of 3

Site Inspection Activity Plan Wolf Creek 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count WC 2025 INITIAL EXAM

1 7/6/2025 7/12/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

8/17/2025 8/23/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

Inservice Inspection-WC

1 10/6/2025 10/17/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,4,PI - WC

1 10/13/2025 10/17/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

10/13/2025 10/17/2025 IP 71124.04 000728 Occupational Dose Assessment

10/13/2025 10/17/2025 IP 71151 000746 Performance Indicator Verification Age-Related Degradation Inspection - Wolf Creek

1 3/30/2026 4/3/2026 IP 71111.21N.04 001832 Age-Related Degradation

4/13/2026 4/17/2026 IP 71111.21N.04 001832 Age-Related Degradation RP 1,4,PI - WC

1 4/13/2026 4/17/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

4/13/2026 4/17/2026 IP 71124.04 000728 Occupational Dose Assessment

4/13/2026 4/17/2026 IP 71151 000746 Performance Indicator Verification RP 5,6,7,8 - WC

1 6/8/2026 6/12/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation

6/8/2026 6/12/2026 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

6/8/2026 6/12/2026 IP 71124.07 000731 Radiological Environmental Monitoring Program

6/8/2026 6/12/2026 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation WC 2026 BRQ

1 6/21/2026 6/27/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Security 71130.02/.07/.08

1 7/13/2026 7/16/2026 IP 71130.02 000734 Access Control

7/13/2026 7/16/2026 IP 71130.07 000739 Security Training

7/13/2026 7/16/2026 IP 71130.08 000740 Fitness-For-Duty Program

7/13/2026 7/16/2026 IP 71130.09 001656 Security Plan Changes

7/13/2026 7/16/2026 IP 71151 001338 Performance Indicator Verification EP Program & PI Inspection (2026) - WC

1 8/17/2026 8/21/2026 IP 71114.02 000717 Alert and Notification System Testing

8/17/2026 8/21/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System Prepared on 8/13/2025 1:37:57 PM 2 of 3

Site Inspection Activity Plan

8/17/2026 8/21/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

8/17/2026 8/21/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness

8/17/2026 8/21/2026 IP 71151 001397 Performance Indicator Verification Wolf Creek 2026 PI&R

1 10/5/2026 10/9/2026 IP 71152B 000747 Problem Identification and Resolution

10/12/2026 10/23/2026 IP 71152B 000747 Problem Identification and Resolution Inservice Inspection-WC

1 3/29/2027 4/8/2027 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,3,PI - WC

1 4/5/2027 4/9/2027 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

4/5/2027 4/9/2027 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

4/5/2027 4/9/2027 IP 71151 000746 Performance Indicator Verification Security 71130.01/.02/.04

1 6/7/2027 6/11/2027 IP 71130.01 000733 Access Authorization

6/7/2027 6/11/2027 IP 71130.02 000734 Access Control

6/7/2027 6/11/2027 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

6/7/2027 6/11/2027 IP 71130.09 001656 Security Plan Changes

6/7/2027 6/11/2027 IP 71151 001338 Performance Indicator Verification Prepared on 8/13/2025 1:37:57 PM 3 of 3