April 14, 2025

SUBJECT:

WOLF CREEK GENERATING STATION - SECURITY BASELINE INSPECTION REPORT 05000482/2025403

Dear Cleave Reasoner:

On April 4, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Wolf Creek Generating Station and discussed the results of this inspection with Mike Boyce, Vice President, Engineering, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jesse M. Rollins, Chief Physical Security Branch Division of Radiological Safety & Security Docket No. 05000482 License No. NPF-42

Enclosure:

As stated

Inspection Report

Docket Number:

05000482

License Number:

NPF-42

Report Number:

05000482/2025403

Enterprise Identifier:

I-2025-403-0003

Licensee:

Wolf Creek Nuclear Operating Corp.

Facility:

Wolf Creek Generating Station

Location:

Burlington, KS

Inspection Dates:

March 31, 2025, to April 4, 2025

Inspectors:

D. Holman, Sr Physical Security Inspector

Approved By:

Jesse M. Rollins, Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Wolf Creek Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspector evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

  • Tier I: All Requirements
  • Tier II: All Requirements
  • Tier III: All Requirements

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspector verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) April 1 through December 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

  • On April 4, 2025, the inspector presented the security baseline inspection results to Mike Boyce, Vice President, Engineering, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

CR10038674,

CR10014508,

CR10030518,

CR10036311,

CR10037345,

CR10037138,

CR10038041

Condition Report

Corrective Action

Documents

Resulting from

Inspection

CR10040858,

CR10040859,

CR10040826

Condition Report

CR10035964 -

Discovery Team

Worksheet

Control Room Found Unsecured

08/21/2024

Inspection Report 05000482/2022402

WCGS Security Baseline Inspection Report

06/29/2022

OJT Task 01.02

Conduct a Post Turnover [Turnover Standards Added]

Example

Blank

SECF 01-108A-11

Weekly Device Test Log, Tuesday/Days [Security Diesel

Generators]

11/26/2024

SECF-01-108A-01

Daily Device Test Log

11/04/24

SECF-01-108A-01

Daily Device Test Log

2/17/2024

Miscellaneous

SECF-01-108A-01

Daily Device Test Log

01/30/2025

AP 27-005A

Cargo Search

AP 27-012

WCGS General Security Information

SEC 01-108A

Security System Performance Testing

19A

SEC 01-202A

Personnel Access To The Protected Area

SEC 01-203A

Personnel Access To Vital Areas

SEC 01-204A

Badge Preparation and Maintenance

SEC 01-206A

Lock and Key Control

Procedures

SEC 01-207

Vehicle Access Control

71130.02

Self-Assessments QH-2024-2708

NRC Security Baseline Inspection Readiness Assessment

08/15/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Checklist, IP 71130.02, Access Control