IR 05000482/2025403
| ML25104A056 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 04/14/2025 |
| From: | Jesse Rollins NRC/RGN-IV/DRSS/PSB |
| To: | Reasoner C Wolf Creek |
| References | |
| IR 2025403 | |
| Download: ML25104A056 (7) | |
Text
April 14, 2025
SUBJECT:
WOLF CREEK GENERATING STATION - SECURITY BASELINE INSPECTION REPORT 05000482/2025403
Dear Cleave Reasoner:
On April 4, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Wolf Creek Generating Station and discussed the results of this inspection with Mike Boyce, Vice President, Engineering, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jesse M. Rollins, Chief Physical Security Branch Division of Radiological Safety & Security Docket No. 05000482 License No. NPF-42
Enclosure:
As stated
Inspection Report
Docket Number:
05000482
License Number:
Report Number:
Enterprise Identifier:
I-2025-403-0003
Licensee:
Wolf Creek Nuclear Operating Corp.
Facility:
Wolf Creek Generating Station
Location:
Burlington, KS
Inspection Dates:
March 31, 2025, to April 4, 2025
Inspectors:
D. Holman, Sr Physical Security Inspector
Approved By:
Jesse M. Rollins, Chief
Physical Security Branch
Division of Radiological Safety & Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Wolf Creek Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspector evaluated the access control program through completion of the following
inspection elements: Access Control
(1)
- Tier I: All Requirements
- Tier II: All Requirements
- Tier III: All Requirements
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspector verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
- (1) April 1 through December 31,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspector verified no proprietary information was retained or documented in this report.
- On April 4, 2025, the inspector presented the security baseline inspection results to Mike Boyce, Vice President, Engineering, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
CR10038674,
CR10014508,
CR10030518,
CR10036311,
CR10037345,
CR10037138,
CR10038041
Condition Report
Corrective Action
Documents
Resulting from
Inspection
CR10040858,
CR10040859,
CR10040826
Condition Report
CR10035964 -
Discovery Team
Worksheet
Control Room Found Unsecured
08/21/2024
Inspection Report 05000482/2022402
WCGS Security Baseline Inspection Report
06/29/2022
OJT Task 01.02
Conduct a Post Turnover [Turnover Standards Added]
Example
Blank
SECF 01-108A-11
Weekly Device Test Log, Tuesday/Days [Security Diesel
Generators]
11/26/2024
SECF-01-108A-01
Daily Device Test Log
11/04/24
SECF-01-108A-01
Daily Device Test Log
2/17/2024
Miscellaneous
SECF-01-108A-01
Daily Device Test Log
01/30/2025
AP 27-005A
Cargo Search
AP 27-012
WCGS General Security Information
SEC 01-108A
Security System Performance Testing
19A
SEC 01-202A
Personnel Access To The Protected Area
SEC 01-203A
Personnel Access To Vital Areas
SEC 01-204A
Badge Preparation and Maintenance
SEC 01-206A
Lock and Key Control
Procedures
SEC 01-207
Vehicle Access Control
Self-Assessments QH-2024-2708
NRC Security Baseline Inspection Readiness Assessment
08/15/2024
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Checklist, IP 71130.02, Access Control