IR 05000458/1997011

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-458/97-11
ML20202B009
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/28/1997
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mcgaha J
ENTERGY OPERATIONS, INC.
References
50-458-97-11, NUDOCS 9712030036
Download: ML20202B009 (5)


Text

-

-

.

....

SUBJECT:

NRC INSPECTION REPORT 50-458/9711

,

Dear Mr. McGaha:

Thank you for your letter dated August 20,1997, in response to our letter and

' Notice of Violation dated July 21,1997. We have reviewed your reply and find it-responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

'

s

Sincerely, h, Blainh Murray, Chief i

Plant Support Branch Division of Reactor Safety Docket No.: 50-450 License No.: NPF-47 cc:

.

Executive Vice President and Chief Operating Officer

/

Entergy Operations, Inc.

[/

. P.O. Box 31995

/f Jat;kson, Mississippi-39286-1995

/

.Vice President -

- Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi - 39286-1995

.kl.klllk,fl l k971128agje gry n %'

..

.

-

.

.

.

.

Entergy Operations, Inc._

-2-

,

General Manager :

Plant Operations

-

,

River Bend Station -

Entergy Operstions, Inc.

P.O. Box 220 --

'St. Francisville, Louisiana 70775 -

Director _ - Nuclear Safety.-

'

River Bend Station Entergy Operations, Inc.

P.O. Box 220 -

St. Francisville, Louisiana 70775 Wise, Carter, Child & Caraway P.O. Box 651 -

= Jackson, Mississippi 39205 Mas k J. Wetterhahn, Esq.

Winston & Strawn 1401 L Street, N.W.

Washington, D.C. -20005-3502 Manager Licensing River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 The Honorable Richard P. leyoub Attorney General P.O. Box 94095

' Baton Rouge, Louisiana 70804-9095 H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, Louisiana _70806 President of West Feliciana Police Jury P.O. Box.1921 -

St. Francisville, Louisiana. 70775 Joint Ownership Manager-Cajun Electric Power Coop. Inc.

P.O. Box 15540 Baton Rouge, Louisiana _70895

,

,,

s-

---..-., -

---.

-

- > -. -, - -.

,en-

-

..

g...

L,

.:!;

Enter 0y Operations, Inc.

-3-William H. Spell, Administrator Louisiana Radiation Protection Division -

- P.O. Box 82135 '

Baton Rouge, Louisiana 70884-2135

-1 i

a

'

)

]

..

l

-

'!p

)

' ' '

.........

...

_

_ _ _ _ - _ _ _

_ _ _ _ _ _ _ _ _ _ _

.

Entergy Operations, Inc.

-4-DISTRIBUTION w/ cony of liegngge's letter dated Auaust 20.1997:

DMB (IE04)

Regional Administrator i

Senior Resident inspector (Grand Gulf)

-

<

River Bend Resident inspector DRS Director DRS Deputy Director DRP Director DRS-PSB Branch Chief (DRP/C)

Project Engineer (DRP/C)

Branch Chief (DRP/TSS)

Elaine Koup, NRR/DRPM/PSGB (MS: OWFN 11 E22)

Leah Tremper, OC/DAF/LFARB (MS: W/FN O E10)

MIS System RIV File PSB File (Hodgeti)

DRS Action item File 97-G-0079

,

DOCUMENT NAME: G:\\ REPORTS \\RB711 AK.TWD To receive copy of document, Indicate in box:"C" = Copy wthout enclosures "E" = Copy wth enclosures "N" = No copy RIV;PSB b E

C:DRS/@6 i

TWDexter:nh BMurra/#Q 11497 11/Jg197 h

OFFICIAL RECORD COPY

- - _ _ _ - _

_ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ - _ _ _ _

__

._

'.

.

Entergy Operations, Inc.

-4-DISTRIBUTION w/conv of lictnige's letter dated August 20.1997:

DMB (IE04)

Regional Administrator Senior Resident inspector (Grand Gulf)

River Bend Resident inspector DRS Director DRS Deputy Director DRP Director DRS PSB Branch Chief (DRP/C)

Project Engineer (DRP/C)

Branch Chief (DRP/TSS)

Elaine Koup, NRR/DRPM/PSGB (MS: OWFN 11 E22)

Leah Tremper, OC/DAF/LFARB (MS: TWFN 9 E10)

MIS System RIV File PSB File (Hodges)

DRS Action item file 97-G-0079 DOCUMENT NAME: G:\\ REPORTS \\RB71 U.K.TWD Tc receive copy of document, Indicate in box:"C" = Copy without encJosures "E" = Copy wrth enclosures *N" = No copy RIV.PSB hg E

C.DRS/F{$$

TWDexter:nh BMurra/*Q 11Q97 11th;797 h

l OFFICIAL RECORD COPY

_

_

-i..___.-__.___---

,_,_,___.m,___:__________.,________,_____,_____,_____,,.______.____.,.,______________,,,___

_ _ __ __

-

..

Entergy operations,Inc.

Ibver tieral Statui

,

,

' 8 15 S

'Oh*ay c1 g

,

- Entergy umw-Ias 504 635 !40

-

._

Fuck J. King te Latety a ficy-eateny Mus August 20,1997 U.S. Nuclear Regulatory Commission Document Control Desk, OPI 17 Wasidngton, DC 20555 Subject:

Reply to Notice of Violation in IR 97 011 River Bend Station UnitI License No. NPF-47 Docket No. 50-458

.

File Nos.:

09.5,G15.4.1 RBO 44152 RDFI-97-0302 Gentlemen:

Pursuant to the provisions of 10CFR2.201, Attachment A provides the Entergy Opentions, Inc, resporse to the Notice of Violation (NOV) described in NRC Inspection Report (IR) 50 458/97-011.

.

The subject violation,50-458/97011 01, involves failure to ct,rry fonvard a design feature (i.e., an audible alarm) during a security system upgrade which had previously been used as a justification for a security plan change.

Should you have any questions regarding the attached information, please contact Mr. David Lorfing of my staff at (504) 381-4157.

Sinc rely,

.

h',

-

lu-Gu attachments

,a, t ", *

e %

gs 4700R90945-970820 PDR ADOCK 05000458 G

PDR h,

.

- - - - _

- - _

- --

--

__

'

.

,

-

.

A1TACllMENT A REPLY TO NOTICE OF VIOLATION 50-458/9711-01 Page1of2 Violation:

During an NRC inspection conducted on June 23 27,1997, one violation of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG 1600, the violation is listed below:

Condition 2.D of the River Bend Station Operating License NPF-47, requires the licensee to maintain in effect and fully implement all provisions of the Commission approved physical security plan. This includes amendments and changes made pursuant to the authority of 10 CFR 50.54(p).

Paragraph 2.6.8.5 of the River Bend Station Physical Security Plan states, in part, " Temporary security positions are normally established to provide compensatory measures for degraded barriers or malfunctioning security equipment..... Because the Video Capture System provides detection and assessment capabilities, it may be used in lieu of temporary security perimeter positions during computer failures or transfers."

The licensee'sjustification to use the video capture system as an acceptable compensatory measure, in the event of a computer failure, was that an audible video capture system alarm was automatically activated

.

upon the loss of the security computers.

Contrary to the above, on June 26,1997, the inspector identified that the video capture system did not have the capability of generating an audible alann.

This is a Severity Level IV violation (458/9711-01).

Reasons for the Violation:

In February,1995, a change was implemented to the Physical Security Plan Part of this change was the ability to use the video capture system in lieu of a Security Officer as a compensatory measure. The justification for this, which was docketed in the change submittal for use of this process, was that the video capture system had an audible alarm.

This was a statement of fact about an actual system configuration, and not identified in the licensing basis decuments nonnally reviewed during the River Bend Station

< 10 CFR 50.54(p) change teview process.

In September,1996, the security computer system was replaced. Prior to installation of this new computer sptem, a 10 CFR 50.54(p) change review was performed to verify requirements for the security system. This review did not identify a requirement for an audible alarm on the video capture system. Therefore, during replacement of the new

. computer system, the audible alarm for the video capture system was not canied fonvard.

<

i l

-.. -

..

.

-.-..

..

_

.. -

-

.

.

. - - -. -

'

I

.

_

.

Reply to Notice of Violation in 50-458/97-011 August 20,1997 RIlO-44152 R11F1-97-0302 Page 2 of 2 cc:

U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington,TX 76011 NRC Sr. Resider.t inspector P. O. Box 1050 St. Francisville, LA 70775 David Wigginton NRR Project Manager U. S. Nuclear Regulatory Commission M/S OWFN 13113 Washington, DC 20555

f.

.

ATTACliMENT A REPIN TO NOTICE OF VIOLATION 50-458/9711-t,(

Page 2 of 2 The primary cause of this occurrence is that insufficient guidance exists to ensure that the relevant infonnation contained within docketed correspondence for changes to the Physier.1 Security Plan is bounded within the licensing basis documents which are revicwed during the 10 CFR 50.54(p) change review process.

Corrective Actions That flave licen Taken:

Upon identification of the deficiency, immediate measures were taken to preclude the use of tl.c video capture system as a compensatory measure.

Corrective Actions That Will Be Taken to Avoid Further Violations:

Specifically, the audible alarm will be installed in the video capture system. Security personnel will be notified that use of the video capture system as a compensatory measure is again valid. The licensing basis documents which are reviewed during the 10 CFR 50.54(p) change review process will be changed to include the audible alarm, thereby bounding this condition within the scope of future change reviews.

Le 10 CFR 50.54(p) review process will be evalu:ted and appropriately enhanced to i

ensure * hat the relevant information contained within docketed correspondence for changes u the Physical Security Plan is bounded within the licensing basis documents.

In addition, an administrative review of docketed security correspondence since 1994 will

'

be perfonned to detemiine if any similar concems exist.

During the interim period, until these generic corrective actions are complete, measures will be taken to ensure that future 10 CFR 50.54(p) change reviews will include a review of applicable security plan related docketed correspondence.

Other 10 CFR 50.54 change review processes will be evaluated to determine if any enhancements are needed to prevent a similar occurrence in their respective areas.

Date When Full Compliance Will lic Achieved:

River Bend Station is currently in full compliance.

AdditionalInformation:

Please note that the use of the video capture system is as a compensatory measure.

The audible alamt was not reinstalled upon replacement of the security computer system in September 1996. The video capture system has not been used as a compensatory measure since that time.