IR 05000458/1990026
| ML20024F980 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 12/19/1990 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Deddens J GULF STATES UTILITIES CO. |
| References | |
| NUDOCS 9012270200 | |
| Download: ML20024F980 (2) | |
Text
- '
f'0,h!'
i
.j Docket: No. 50-458/90-26 License No.:NPF-47
s-
.q i
Gulf States' Utilities ATTN:. James C. Deddens Senior Vice President (RBNG)'
l P.O. Box 220 St. Francisville, Louisiana 70775
.
Gentlemen:
'
Thank you for your letter of-December 3,1990, in response.to our letter
,
,
' and Notice of Deviation. dated November 2,1990. We.have reviewed your reply. f>
'
,
-!and find'it responsive to the concerns raised in our Notice of Violation. We
'
will review the' implementation of your corrective actions during'a future
. inspection to determine that full compliance has been achieved and will be-maintained.
Sincerely, lDl
'
l' <
Samuel J. Collins, Director Division of Reactor Projects '
l
<
,
.;
'CC:'
,;
- Gulf States stilities.
..
D M ATTN:
J.4E. Booker, Manager-a
,
- Nuclear Industry Relations o
P.O. - Bo'x 72951 -
'
._ Beaumont, Texas -77704 E
Winston &lStrawn-E'
. ATTN:..-Mark.J. Wetterhahn, Esq.
.
14.01'L; Street, N.W..
.,
. ashington, D.C.
20005-3502
~
.W f
- . Gulf States ' Utilities.-
>
l
';ATTH:- Les. England Director Nuclear Licensing.
'j g
'
t:
>P.O. Box 220 H
St. Francisville, Louisiana 70775
.RIV:DRP/QfPHHarrellCiDRP/h,'
D RVAzuatdfVv
.
J ollins
,
b-
-
.!
- 12/14 /90
-
12/64 /90
,1
-
d" ' %.
'
J 9012270200 901219
'
PDR ADOCK 05000450 O
-
-
!
-.1 1-;
'
I D
'
Gulf States Utilities'
-2-
.;
-r i
1Mr. J.. David McNeill, III-
,
William G. Davis, Esq.
Department 'of Justice
. -
-Attorney General's Office P.O. Box'94095 Baton Rouge, Louisiana 70804-9095 H; Anne P1ettinger
,
!
3456-Villa Rose Drive
~. Baton ~ Rouge, Louisiana 70806
-
- President-of West Feliciana
-
LPolice' Jury..
,
P.O. Box 1921 St.._ Francisville, Louisiana 70775
,
Cajun Electric Power Coop. Inc.
. ATTN:
Philip-GeHarris.
,,
.107191 Airline' Highway
.P;0.' Box:15540-..
.
-
Daton Rouge, Louisiana ~70895 q
Department of Environmental Quality
' ATTNi _ Glenn' Miller, Administrator
'
. Radiation Protection Division P.O. Box 14690.
'
= Baton Rouge, Louisiana 70898
>!
b'cctoDMB"(IE01)'
,
1I
'#
. bcc d'istrib. by RIV:
'. R. D. ' Martin ResidentJInspector
'
-
!
' ;.DRP.,
.Sotion Chief;(DRP/C)
'
'
,
Lisa Shea, RM/ALF M n System-RSTS' Operator i
DRSS-RPEPS
-
-
,
- Project; Engineer (DRP/C)'
RIV File
.
!DRS
'
Senior-Resident inspector, Cooper
<
Senior Resident Inspector Fort Calhoun
'
c
,
g-r s,
, dl r
'
i
,
-
.
,
- _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _
e e=
=
i
~
Sh
-
GU&F.i f.1T.E'S
.JT.T.:;.. ~ f L3 l ?.3 N Y
-
a
$
IOG(Q}3"~
December 3, 1990
- fj
' -'
{,
'
RBG-34103 File Ibs. G9.5, G15.4.1 CEC l01990 0"
U
-
U. S. Nuclear Regulatory Camission i_
Document Control Desk Washington, D.C.
20555 Gentlemen:
River Bend Station - Unit 1 Refer to: Region IV Docket No. 50-458/90-26 Pursuant to 10CPR2.201, this letter provides Gulf States Utilities Caqx.ny's IcSU) response to the Notice of Deviation for NRC Inspection Report No.
w-458/90-26.
The inspection was conducted by &ssrs. Ford and Ioveless during the period of September 5 through October 16, 1990, of activities authorized by NRC Oper.ating License NPF-47 for River Bend Station - Unit 1.
GSU's response to the deviation is provided in the enclosure.
Should-you have any questions, please contact Mr.
L.
A.
England at (504) 381-4145.
Sincerely,
J. C. Deddens Senior Vice President
-
River Bend Nuclear Group I.AE/DRD/FRC/DNL/JWC/ch Attachment cc:
U. S. Nuclear Regulatory Cannission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011
.
Senior Resident Inspector Post Office Box 1051 St. Francisville, IA 70775 k
~*
~~~ '
j'
-.-
_
_
.
.
-
-,
_
_.
~
_.
. -.
. -.
_.
--
s
.,
-.
[
-i HESPOM 'IO NtyfICE & DEVIATION 50-458/9026-01 REFERENCES Notice of Deviation Letter frcra S. J. Collins to J. C. Deddens, dated
-
November 2, 1990.
" DEVIATION FDOM COfNI7 MENT ON LIGITING LEVELS T
h. River Dend Station Updated Safety Analysis Report (USAR), Section
.9.5.3.1.1,-
dated August 1987, states that
."The station lighting systems
provide lighting intensities at levels reconmended by the Illuminating
"
Engineering Society and in accordance with current OSHA requirements."
OSHA-good practice procedures give, as a rule-of-thumb, 20-30 foot-candles for areas where services are performd and 50-60 foot-candles for areas where tasks are being performed.
-N Illu:ninating Engineering Society Handbook, Section 9,
" Electric Generating Station," reccamends illuminance levels for nuclear powr at 15' foot candles for uncontrolled auxiliary building areas.
'
plants
. Contrary to the above, on October 3,1990, lighting in D tunnel did not meet these requiremnts in that approximately 75 percent of the lights in the tunnel ;were, burned out and the intensity was such that valves and piping could only be'seen with'the aid of a flashlight.
REASON EUR THE DEVIATION D tunnel is not a normally traveled plant -area.
It is assigned.to the Electrical Foreman to patrol.on a weekly basis.. Due to increased activities
_l for Refueling' Outage No..-3 (RF-3) preparation, this-patrol was not performed
'for two months prior to 'RF-3.
This is the primary cause for the lack of lighting in D tunnel.
-
<
cCORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED
-
Inmediately upon notification of, inadequate lighting _ this area was relamped.
In addition,- Electrical-Maintenance made a patrol of the entire plant
'
- including areas of infrequent; travel.-
CORRECTIVE STEPS WHIOi WILL BE TAKEN 10 ' PREVENT FURTHER DEVIATIONS The weekly patrols of Electrical Maintenance Ibreman will restune following RF-3.
In addition Eto these patrols a " HOT" line has been set up in the Electrical Supervisor's office which will allow individuals to-report-poor
-
lighting ; problems.
- This "fKyr" line is connected to a-recorder which allows 24-hour access and also allows for a review by the Electrical Supervisor on a daily work day basis.
Page 1 of 2
- -
.
-
.
.
-
_
-
..
-
.
e.
t.
DATE MIEN EULL COMPLIANCE WILL BE AGIEVED The corrective actions which have been taken are expected to mintain conpliance with the USAR ccanitment.
.
Page 2 of 2