IR 05000458/1990024
| ML20058D050 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 10/22/1990 |
| From: | Cain C, Caldwell R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20058D045 | List: |
| References | |
| 50-458-90-24, NUDOCS 9011050287 | |
| Download: ML20058D050 (2) | |
Text
E
..
.
.
,,.o
.
APPENDIX U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report:
50-458/90-24 Operating License:
NPF-47 Docket:
50-458 Licensee: Gulf States Utilities (GSU)
P.O. Box 220
.
St. Francisv111e, Louisiana 70775
-
Facility Name:
River Bend Station (RBS)
Inspection At:
RBS, St. Francisville, Luuisiana Inspection Conducted:
September 10-14, 1990 Inspector:
/ / w///
c/r/9e
-
%
A~. Caldwell, Ser.ior Security Inspector Date /'
~
Nuclear Materials and Safeguards Inspection Section Approved:
M 46 oh lo flt f70
.
Charles L. Cain, Chief, Nudlear Materials and Date'
Safeguards Inspection Section Inspection Summary Inspection Conducted September 10-14. 1990 (Report 50-458/90-24)
Areas Inspected:
Routine, unannounced inspection of the licensee's physical security program.
The areas inspected within the physical security program included management support, security program plans, and audits; protected and vital area access control of personnel; alarm stations and communications; testing, maintenance, and compensatory measures; and security training and
'
qualifications.
Results: Within the areas inspected, one noncited violation and no deviations
.
were Tdentified. One open item is identified in paragraph 2.
l The NRC inspection effort focused on the progress made in improving the l -
security program based on the findings of the licensee's independent audits of the. security program.
The strength of management's involvement in the i.mprovement effort is demonstrated in organizational changes and procedural
ENCLDSURE CONTAINS '
UPON SEPARATION THIS 90110502s7 901029 -
PACC IS DECONTROLLED gDR ADOCK 0 %
B,-
.
i
.
.
a
- *
-
,
,
,
.g.
revisions.
The licensee's quality systems staff has conducted special audits of the security operations, systems, and human resources. These audits listed 14 concerns for response by security management. The physical security system upgrade and the establishment of a dedicated maintenance team has been accomplished since the last NRC inspection.
,
f ENCLOSURE CONTAINS i'
SUIGUARDS INFORMATION l
UPON SEPARATION THIS l
PAGE IS DE00NTROLLED l
i
'
t