IR 05000445/1979003

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Repts 50-445/79-03 & 50-446/79-03
ML19261C712
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/13/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19261C714 List:
References
NUDOCS 7903280287
Download: ML19261C712 (1)


Text

7E' N)-

-

.

,,pa 88%,

UNITED STATES

[

'o NUCLEAR REGULATORY COMMISSION

REGION IV

y

g 5-

. g 611 RYAN PLAZA DRIVE, SUITE 1000

  • I.

/

March 13, 1979 In Reply Refer To:

RIV Docket No. 50-445/Rpt. 79-03 50-446/Rpt. 79-03

.

Texas Utilities Generating Company ATTil: Mr. R. J. Gary, Executive Vice President and General Manager 2001 Bryan Tower Dallas, Texas 75201 Gentlemen:

Thank you for your letter of March 6,1979, in response to our letter dated February 20, 1979, and the attached flotice of Violation. We have no further questions at this time and we will review your corrective action during a future inspection.

Sincerely,

.

,fL'4'%c'&

.

f

-

W7 C. 53 idle, Chief Reactor Construction and s

Engineering Support Branch 790328 OA87