IR 05000445/1979021

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-445/79-21 on 790829.No Noncompliance Noted. Major Areas Inspected:Second Corporate Mgt Meeting Re Preoperational & Testing Activities
ML19256E103
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 09/05/1979
From: Madsen G, Renee Taylor, Westerman T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19256E100 List:
References
50-445-79-21, NUDOCS 7910290049
Download: ML19256E103 (4)


Text

.

.

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION IV

'E Inspection Report No. 50-445/79-21 Docket No. 50-445 Licensee:

Texas Utilities Generating Company 2001 Bryan Tower Dallas, Texas 75201 Facilir/:

Ccmanche Peak Electric Station - Unit 1 Inspection At:

Glen Rose, Texas Inspection Conducted: August 29, 1979 C' b'- 7 k

't

/

'

Principal Inspector:

/

R. Smith, Rsactor Inspector Date c

.

$

l es e

.. G.~ Taylor, Resident Reactor Inspector Date M

$

Date

~

Blai Murray, Radiapon Specialist

,

lf f~b~l$

i n

,

g R. G. Spangler, Reactor Inspector Date 7 f, h 9-3 - 79 T. F. Westerman, Chief, Reactor Projects Section Date Y Y l f4 0 l.S -79

'G. L. Madsen, Chief, Reactor Operations and Date Nuclear Support Branch 7' N

-

1 S -79 Reviewed By:

T. F. Westerman, Chief, Reactor Projects Section Date 7?/

[y } [

,

7 9102 9 064f(

'

.

-2-Inspection Summary Inspection on August 29,1979 (Report No. 50-445/79-21)

Area Inspected:

This inspection consisted of the second corporate ranage ent meeting.

The meeting involved discussions by both f;RC and the licensee regarding preoperational organization and testing activities.

The inspection involved fifteen (15) hours on-site time by six flRC inspectors.

2[

dlO i

.

-3-DETAILS 1.

Management Meeting The second corporate management meeting between the t!RC Region IV staff and the Texas Utilities Generating Company staff was conducted at tne licensee's offices at Comanche Peak fluclear Generating Station on August 29, 1979. The following licensee personnel were in attendance.

Texas Utilities Generating Company B. R. Clements, Vice President and Manager, fluclear Operations J. C. Kuykendall, General Superintendent D. N. Chapman, Manager, Quality Assurance R. A. Jones, Assistant General Superintendent D. W. Braswell, Engineering Superintendent R. B. Seidel, Operations Superintendent T. L. Thompson, Maintenance Superintendent R. Canp, Lead Startup Engineer Westinghcuse Electric Corporation P. S. Vanteslaar, Site Manager flRC Region IV Office of Inspection & Enforcement G. L. Madsen, Chief, Reactor Operations & Nuclear Support Cranch T. F. Westerman, Chief, Reactor Projects Section B. Murray, Radiation Specialist R. Smith, Operations Reactor Inspector R. G. Spangler, Operations Reactor Inspector R. G. Taylor, Construction Regional Resident Inspector 2 '.

Purpose and Scope of the Meeting A meeting was held with management representatives of the licensee and NSSS Site Manager to (1) review the status of construction related problems; (?) identify the change in emphasis of the inspection program; (3) to clarify the licensee's program for staffing the facility during the preoperational and startup testing phases; (4) to determine the quality assurance renuire-ments which would be applicable during the testing phases; and (5) to advise

~

the licensee of the programatic requirements of the inspection program for the testing phases.

3.

Items Discussed During the Meeting The general areas outlined below were discussed by the licensee representatives and/or the Region IV personnel.

Questions which were raised during the course of the meeting were discussed and resolved during the meeting.

M/

319

.-

.

-4-Construction problems which are still unresolved and the remining a.

construction inspection effort.

b.

Staffing of the facility during preoperational and startup testing.

c.

Status of the preoperational testing program.

d.

Quality Assurance program to be used to implement the 10 CFP. 50, Appendix B criteria.

Provisions of the FSAR that IE will inspect against with respect to e.

the licensee's preparation and conduct of testing and operations.

f.

The IE program for selective review of test progran elements and licensee activities.

The IE program for inspections against the Technical Specifications and 10 CFR 50.59 after the operating license is issued.

h.

The der

-; for the completion of various stages of the testing progr-

'D /