IR 05000423/1985037
| ML20135A646 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/28/1985 |
| From: | Mccabe E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20135A643 | List: |
| References | |
| CON-NRC-05-85-157-01, CON-NRC-5-85-157-1 50-423-85-37, NUDOCS 8509100227 | |
| Download: ML20135A646 (1) | |
Text
._.
_
-
,
- - _.
_
.
_
,
,
U.S. NUCLEAR REGULATORY COMISSION
REGION I
,
Docket / Report: 50-423/85-37 Construction Permit:
CPPR-113 Licensee:
Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06101 Facility:'
Millstone Nuclear Power Station, Unit 3, Waterford, Connecticut i
Inspection / Evaluation Period: July 8 - August 19, 1985 Onsite Phase: July 8-19, 1985
.
NRC Contract: -NRC-05-85-157-01 Task Order:
002 Reporting Organization:
Parameter, Inc.
'
Report Approval:
6.4, kM Pl2 BIBS E. C. McCabe, Chief, Reactor Projects Section 38 Date Summary:
Inspection / evaluation, concentrated on more significant aspects of the licensee's Probablistic Safety Study, to assess whether significant discrepancies existed between Technical Specifications, the Final Safety Analysis Report, the Safety Evaluation Report, and the as-built plant configuration.
The inspector concluded that the draft Technical Specifications were compatible with the as-built systems, structures, and components in the areas inspected and that compli-
,
ance with the Technical Specifications could be definitely measured or determined.
'
'
.