Forwards Review of Millstone Unit 3 Tech Specs & Tech Spec Comparison Rept 50-423/85-37 on 850708-0819.Tech Specs & Implementing Procedures Compatible w/as-built Plant. Refinement of Tech Specs & SAR Need to Be Accomplished
ML20135A641
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/30/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20135A643 List:
References
NUDOCS 8509100226
Download: ML20135A641 (2)


See also: IR 05000423/1985037

Text

.. __ .

w ..,

c.

'

AUG 3 01985

Docket No. 50-423

Northeast Nuclear Energy Company ,

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

-P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: Technical Specification Comparison (Report 50-423/85-37)

This forwards the enclosed NRC contractor report of a comparison of draft Millstone

'

3 Technical Specification provisions and the Millstone 3 facility. That sampling

comparison was based on a selection from the more significant contribLtors to risk

identified in your Probablistic Safety Study for Millstone 3. The pre ninary

! results of the comparison were discussed with Mr. Crockett and other - ' cc of

your staff on July 19, 1985.

Overall, this comparison concluded that the Technical Specifications and implement-

ing procedures are compatible with the as-built plant, consistent with the present

stage of development of the Technical Specifications and procedures. As the report

illustrates, however, a substantive amount of refinement of Technical Specification

and SAR provisions remained to be accomplished at the time of the comparison, as

-

did a considerable amount of procedure development. We will use the report as a

reference in our inspection efforts, and significant aspects will be pursued fur-

ther through our ongoing inspections of facility testing and conformance to NRC

requirements and your commitments.

Your cooperation with us and our contractor is appreciated.

Sincerely,

l ori;rinni SigneOT11

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

. Enclosure: NRC Region I Report 50-423/85-37

.

I

l

B509100226 850830

$"

" '

M il

h[ Q

t

-

._ _- ._. . _ _ _ _ . .._ __ _ . - -_.. ._ ___

'

.

,

p ?

AUG 3 01985

Northeast Nuclear Energy Company 2

1

'

cc w/ encl:

V. Papadopoli, Construction Quality Assurance Supervisor ,

! E. R. Foster, Director of Generation Construction

E. J. Mroczka, Vice President, Nuclear Operations

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg, Station Superintendent

~Public Document Room (PDR)

Local Public Document Room (LPDR)

.

Nuclear Safety Information Center (NSIC)

t

NRC Senior Resident Inspector

. State of Connecticut

"

bec w/ encl:

Region I Docket Room (with concurrences)

DRP Section Chief

G. Walton, SRI, Beaver Valley Unit 2

'.

B. Doolittle, NRR

R. Perch, NRR

B. Youngblood, NRR

R. Starostecki, RI

< S. Ebneter, RI

! L. Bettenhausen, RI

J. Durr, RI  ;

P. Eselgroth, RI

'

J. Wiggins, RI

C. Anderson, RI

-

P. Eapen, RI

J. Johnson, RI

>

'

T. Martin, RI

R. Bellamy, RI

,

R. Summers, RI

'.

H. Van Kessel, RI

H. Phillips, IE

J

i i

,

! RI: P

1

'

McC o We ti r

8/28/85 _

l

'

0FFICIAL RECORD COPY

i

, _ - , _ , __.._ _. .--- .-.- . ._ -.-_ _,- . _ - - - - - - _ - _ - _ , _ _