IR 05000416/1986009

From kanterella
Jump to navigation Jump to search
Insp Rept 50-416/86-09 on 860407-11.No Violation or Deviation Noted.Major Areas Inspected:Review of Liquid & Gaseous Radioactive Effluents,Environ Monitoring & Outstanding Item Followup
ML20210Q436
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/30/1986
From: Harris J, Stoddart P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20210Q441 List:
References
50-416-86-09, 50-416-86-9, NUDOCS 8605140084
Download: ML20210Q436 (7)


Text

l.. "

.)

r*

.

.

km REGg UNITED STATES

[

D NUCLEAR REGULATORY COMMISSION o

['

REGION ll o

<

101 MARIETTA STREET N.W.

-

E

  • f ATLANTA, GEORGI A 30323

~

%,

$

+...+

AP9 o 0 MS Report No.:

50-416/86-09 Licensee: Mississippi Power and Light Company Jackson, MS 39205 Docket No.: 50-416 License No.:

NPF-29 Facility Name: Grand Gulf Inspection Ce ducted:

Apri} 7-11, 1986 k'N-b Inspector: -

-

CN/

}."D. Harr s

Date Signed Approved by:

d (f9%

/

  1. - 3 #- 74 Stoddart,/Settion Chief Date Signed Pni l l i p[y.2.'

Emergenm Preparedness and Radiation Protection Branch Division of Radiation Safety and Safeguards SUMMARY Scope: This routine, unannounced onsite inspection included review of liquid and gaseous racicactive effluents, environmental monitoring and outstanding item followup.

'"

Results: Of the 3 areas inspected, no violations or deviations were identifiea.

-

.

w

',w'

a.

~,

V e

F

$

$$

..

~

_

,

,-

,,

,

i p ;,

,.

.,

N

.

.

,

,

-

,

t

3

'.h 2 'M

,-

,

,

'

,

,

-

,

t

. REPORT > DETAILS q

g

-

J

_

-

'.; -

j.t

'l

'T.

Persons Contacted

-

~

'

'

Q

.

,

"

License.e Employees

-

a,,

-

.

R. 2ndkson, Acting' Super ~ visor,,Environmentil Services

'

i R. Brinkman, Radiologics1 Engfneer

-

<

D. Cotton, Dosimetry Specialist:

'

J. Cassetter, Count Room Spec.iaiTst L. Temple, Acting Instrumentation and Calibration Superintendent

,

!

J. Pa'rker, Instrumentation and Calibration Engineer

.

,

j B. Lee,' Quality Assurance At.dit Supervisor

  • J. D. Bailey, Compliance Coordinator M. Michalski, Radwaste Supervisor

)

  • W. E. Edge, Manager, Nuclear Site Quality Assurance
  • S..M.

Feith, Director, Quality Assurance

,

  • G. O. Smith, Plant Chemist
  • A. N. Holbrook, Chemistry Supervisor

!

  • J. Holmes, Chemistry Specialist t

,-

  • J. L. Robert,on, Opsrations Superintendent

'

,

  • C. R. Hutchinson, Ger.eral Manager -

'

  • J. V. Parrish, Chemistry / Radiation Control Superintendent '

y

..

  • L. F. Daughterys Compliance Superintendent

'

  • J. C. Vincelli, ie,chnical Assistant to the Chemistry / Radiation Control Superintendent c
  • R. F. Rogers, Technical Assistant to the General Manager

,

,

  • M. J. Wright, Manager, Plant Operations

'

Other licensee employees contacted include 6 j

office personnel.

/

~

technicians, cperators, and

>

Other Organizations l

~

  • J. P. Czaika, Technical Advisor, Southern Mississippi Electric

'

NRC Resident Inspectors I

  • J. Caldwell

'

  • Attended exit interview

2.

. Exit Interview

The inspection scope and findings were summarized on April 11, 1986, with

.those persons ' indicated. in paragraph I above.

One item involving

verification testing of engineering design changes to the post accident sampling system was ' discussed (paragraph 9). ' The' inspector described the

,-

areas inspected and discussed in detail the. inspection findings.

No

,.

,[

,

.

L.

.4

.

.

dissenting comments were received from the licensee. The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspector during this inspection.

3.

Audits and Appraisals (80721, 84723, 84724)

Technical Specification 6.5.2.8 requires audits. of the radiological environmental monitoring program at least once per 12 months, and of the Offsite Dose Calculation Manual (ODCM) and implementing procedures at least once per 24 months, The inspector reviewed the following audits MAR 85/0174 12/16/85, Radioactive Gaseous Releases MAR 86/009 1/28/86, Radioactive Liquid Effluents MAR 85/0090 6/18/85, Airborne Radioactivity Control MAR 85/0133 10/17/85, Radiological Deficiency Reports Audits MAR 85/0174 and 86/009 address implementation of the ODCM.

The audits reviewed provided adequate confirmation that technical specifications and administrative control obligations are being met.

An audit of the radiological environmental monitoring had been performed recently but was still in drait and was not reviewed during the inspection.

No violations or deviations were identified.

4.

Procedures (84723, 84724)

Technical Specification 6.8.1 requires written procedures to be established, implemented and maintained.

The inspector reviewed the following procedures.

08-5-03-17 Core Damage Estimation, Rev. 6, 11/15/85 06-CH-S017-A-0027 Radwaste Effluent Liquid Process Monitor Calibration, Rev. 21, 9/21/85 06-CH-1D17-M-0017 Ef fl uent Radiation Monitoring Source Check, Rev. 21, 1/19/84 06-0P-1017-A-0021 Containment Building Ventilation Gaseous Monitor Calibration, Rev. 20, 4/10/84 03-S-03-004 Chemistry Authors Guide, Rev. 4, 2/26/86 08-5-03-013 Software Quality Control, Rev. 3, 11/15/85 08-S-03-006 Chemi stry Storage & Handling of Radioactive Sources, Rev. 4, 10/01/85 l

i

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

-

.

08-S-04-003' Laboratory Safety, Rev. 3, 12/18/85 08-S-03-020 Interlaboratory Monitoring Program, Rev. 2, 11/22/85 05-5-04-018 Non Routine Samples for Isotopic Analysis, Rev. 1, 2/24/86 08-S-04-200 Operation of Germanium Counting System, Rev. 3, 10/30/85 08-S-04-221 Calibration and Maintenance of PASS Equipment, Rev. 1, 6/27/85 08-S-04-324 Resins, Determine Total Capacity of Resin Beads, Rev. 6, 11/13/85 08-5-04-326 Silica Analysis (Micro), Rev. 4, 2/24/86 05-5-04-608 Iodine Separation, Rev. 3, 11/1/85 OS-S-04-953 Post Accident Inline Sampling and Analysis Assembly, Rev. 1, 10/22/85 08-S-04-211 Charcoal Bed Performan e, Rev. 2, 5/28/85 08-S-04-220 Ventilation Exhaust Gaseous Monitoring System's Operation, Rev. 1, 12/13/84 The inspector noted that all the procedures had been reviewed and approved as required.

No violations or deviations were identified.

5.

Semi-Annual and Annual Reports (80721, 84723, 84724)

Technical Specifications 6.9.1.6 and 6.9.1.8 require submittal of the Annual Radiological Environmental Report and Semi-annual Effluent Release Reports, respectively.

The inspector reviewed Semi-Annual Radioactivt Effluent Reports for 1985.

No technical discrepancies were noted and the reports were consistent with Regulatory Guide 1.21.

Doses for liquid and gaseous pathways were within applicable Technical Specification limits.

The meteorological data indicates a high data recovery rate for the second, third and fourth quarters.

This was significant improvement over first quarter recovery rates.

The meteorological computer compares data from the primary and secondary sensors to evaluate' operability of individual components as well as eliminate incorrect data.

The inspector toured the meteorological station and reviewed the maintenance logs and channel check records.

The inspector had no further questions.

The inspector reviewed a draft of the 1985 Annual Radiological Environmental Report. The report included all required information and no obvious errors

-

-

- -

-

-

-

-.

- -

-

- -

-

- -

.

__

_

_

.

.

.

i i

were noted.

The inspector determined that the program was performed as

required.

No violations or deviations were identified.

6.

Radioactive Gaseous Waste and Gaseous Effluent Treatment Systems (84724)

Technical Specification 3/4.11.2 establishes upper limits for concentrations of radioactive material in gaseous effluents, t

The inspector selectively reviewed release records from January '- March 1935. All releases were within limits.

Technical Specifications 4.6.6.3 and 4.7.2 give surveillance requirements for the Standby Gas Treatment System and Control Room Emergency Filtration System, respectively.

The inspector reviewed Operations and Maintenance records from August 1985 to April 1986.

These records covered blower, isolation and operability tests of both the above systems, 'as well as charcoal absorber analysis and in-place leak testing of component filters. The inspector had no further.

questions

No violations or deviations were identified.

i 7.

Radioactive Liq;id Waste (84723)

Technical Specification 3/4.11.1 establishes upper limits for concentrations of radioactive materials in liquid effluents.

The inspector reviewed selected release ' records to verify conformance with

!

technical specifications.

For a selected release, the inspector performed dose calculations using the current revision of the ODCM for two nuclides

,

and two different organs.

The calculations agreed with the licensee

,

computer generated dose projections.

The inspector discussed operational

'

performance of the liquid radwaste systems.

There have been some routine problems noted, but the processing load due to -leakage had been reduced during the past year. Currently, the.radwaste demineralizers are effective

'

for over a year.

No violations or deviations were identified.

8.

Radioactive Effluent Monitoring Instrumentation (83723, 83724)

i Technical Specification 3/4.3.7.1 requires radioactive liquid-and gaseous

.

effluent monitoring instrumentation channels to be operable with their

alarm /t ip setpoints set in accordance' with. specified limits and give minimue time intervals for channel checks, channel functional tests, and channel calit ation operations.

i i

i

i

.

- - _

._- _

_, _

,._.=.. _-_-,.,,_ _._, -,_.., _, _ _ _

...,.,

-

.

The inspector observed monthly channel functional tests of the Standby Service Water Radiation Monitors A and B, the Component Cooling Water Radiation Monitor and the Radwaste Effluent Radiation Monitor.

The operability of Control Room readouts for the radioactive effluent monitoring instrumentation were verified by direct observation.

Review of selected records from December 19S? to April 1986 showed that the surveillance program for channel checks, channel functional _ tests and channel calibrations met the technical specification requirements.

For gaseous monitors the alarm / trip setpoints arc set using the most conservative point determined from either the annual calibration or monthly grab sample analysis. For liquid monitor alarm trip setpoint, minimum dilution flow and total tank voiding are assumed to determine conservative setpoints.

No violations or deviations were identified.

9.

Inspector Followup Items (IFI) (92701)

(Closed) LER 83177, Water Collected in Off Gss Pretreatment Monitor Resulting in Improper Flow Through the Monitor Due to an Accumulation of Condensation.

The inspector reviewed the licensee corrective actions and found them feasible.

The prcblem has not recurred.

(Closed)

IFI 416/84-34-01, Compare Normal and PASS Sample Isotopic Analyses (Closed)

IFI 416/84-34-02, Re2ize Stripped Gas Flow Meter and Set Up a Test (Closed)

IFI 416/84-34-03, Review Accuracy of Chloride and Boron Analyses (Closed)

IFI 416/84-34-04, Review Design Changes to Allow Purging of Sample Lines (Closed)

IFI 416/84-39-05, Review Test Results of Negative Ventilation Pressure in PASS Panel Area (Closed)

IFI 416/84-39-06, Evaluation Radiological Problems for Putting Stripped Gas Into Turbine Building Exhaust Vent and Establish Administrative Controls to Ensure Turbine Building Fastener Stay on When PASS is in Use (Closed)

IFI 416/84-39-07, PASS Needs Sump, a Pump and Drain Line (Closed)

IFI 416/84-39-08, Evaluation Need to Test Baron and Chloride Measurements on a Routine Basis The licensee has initiated engineering design changes to correct the above and has established a testing and maintenance program for the PASS System.

The inspector reviewed the changes and implementing procedures and found the items listed have been properly addressed.

The verification

_ _ _ _ _

O

testing upon implementing engineering design changes will be reviewed in a future inspection.

This will be tracked as IFI 416/86-09-01.

(Closed) 416/84-52-01, Inadequate Information on Deposition or Loss of Particulate and Radiciodine Aerosols in Long Sampling Line.

The inspector reviewed a study provided by a licensee contractor. The study covered deposition of particulate in sampling lines for the Containment Exhaust Ventilation System, Fuel Handling Area Exhaust Ventilation System, Radwaste Ventilation Exhaust System, the Turbine Building Exhaust Systems and both trains of the Standby Gas Treatment System.

The results of this study indicate accurate samples are obtained for all systems.

(Closed) 416/85-30-01, Review of Chemistry and Counting Roon Precedures The inspection noted that several procedures had been changed in agreement with comments made during the previous inspection (Closed) 416/85-30-02, Quality Control Checks For Whole Body Counting Ecuipment.

The inspector noted that licensee was using vendor supplied quality control software. The inspector discussed with cognizant licensee personnel some problems with certain aspects of this particular software package.

The licensee was aware of these problems and was using other options within the program to avoid them.

- - - - -

-

-

-

- - -

-

-

-

. -

-.

-

-

- -

- -

- -

-

- -